Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date5 Feb 2024
Closing Date14 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 6,00,000
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Summary

Construction Of Talab,talai Renovation,mpt,pb And Ssb Block Mandrayal

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी.      मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil)   (BSR GKN-2023-24,ITEM NO. 196(B)

97006.45

5603092

57.76

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (WRD BSR 2023 Item No. 1 (C) ,(Chapter No.V)(10% Deduct)

11873.17

1260930

106.2

... More
Compaction on Earth By manually or plain roller. (density 90% of Proctor) (WRD BSR 2023 Item No. 18(A),(Chapter No.V)(10% Deduct)

81827.56

1841120

22.5

... More
Dressing of uneven embankment in required profile (WRD BSR 2023 Item No. 23,(Chapter No.V)(10% Deduct)

55967.68

720304

12.87

... More
Watering of earth including cost of carriage of water when source of water is Beyond 1 Km but upto 5 Km extra per Km (WRD BSR 2023 Item No. 28 A,(Chapter No.V)(10% Deduct)

80214.5

909632

11.34

... More
नींव ट्रेंचेज में मिट्टी की खुदाई का कार्य खुदी हुई मिट्टी का निस्‍तारण तथा समतल करना। (आईटम 2 के अनुसार)  (ब)सख्‍त मिट्टी में/ कंकर मिली मिट्टी में (th-ds-,u- 2023&24 vkbZVe ua- 165c½½ 

34500

5595210

162.18

... More
क्‍वेरी रविस जिसमें 40 प्रतिशत पत्‍थर के स्‍पाल हो या कंकर या घाड़ला को बिछाना तथा आपूर्ति करना, पानी छिड़कना तथा दुरमुट से कूटना।  ¼ch,lvkj th-ds-,u- 2023&24 vkbZVe ua- 124½½ 

8233

5426205

659.08

... More
15 ls 30 lseh eksVs gFkksM+s ls rjk'ks gq, ,dy iRFkj dh fifpax leLr mBku ds lkFk ,oa vkiqfrZ ds lkFk ¼¼ch,lvkj th-ds-,u- 2023&24 vkbZVe ua- 167½

434.24

618175

1423.58

... More
cksMZ ¼ iRFkj dh ifV~Vdk½ vkiwfrZ dj lkbZV ij yxkus dk iw.kZ dk;Z LS

70

105000

1500

... More
Preparing locally available Munja tufts, digging of pits and planting (includes local transportation upto 1 km.) ¼ 6 ykbu esa ½ (BSR 2023 FOREST DEPT. ITEM NO.3.2.1.1(10% Deduct)

74360

93693

1.26

... More
ccwy ds cht dh vkiwfrZ 2 fdyks@ykbu izfr 100 eh- ¼ 4 ykbu esa ½ (BSR 2020 FOREST DEPT. ITEM NO.19(3)(10% Deduct)

379.2

12183

32.13

... More
ccwy ds cht dh cqokbZ 4 ykbZu es¼thds,u 2023&24 vkbZVe ua- 159½

18960

21614

1.14

... More
जंगल की सफाई, साधारण वनस्‍पति तथा झाडि़यों को काटने सहित। (G.K.N.2023-24,Item no. 191 )

3800

9880

2.6

... More
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्‍थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्‍तारण करना  साधारण /मुलायम मिट्टी में| (G.K.N.2023-24,Item no.2) साधारण /मुलायम मिट्टी में (G.K.N.2023-24,Item no.2(a))

4620

604296

130.8

... More
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्‍थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्‍तारण करना  साधारण /मुलायम मिट्टी में| (G.K.N.2023-24,Item no.2) सख्‍त, चिकनी,कंकर मिट्टी में   (G.K.N.2023-24,Item no.2(b))

1980

321116

162.18

... More
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्‍थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्‍तारण करना  साधारण /मुलायम मिट्टी में| (G.K.N.2023-24,Item no.2) आईटम 2 में 1.5 मीटर अतिरिक्‍त उठान (Lift) (G.K.N.2023-24,Item no.3)

1800

37296

20.72

... More
नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्‍थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्‍तारण करना  साधारण /मुलायम मिट्टी में| (काली मिट्टी खुदाई)साधारण /मुलायम मिट्टी में (G.K.N.2023-24,Item no.2(a))

6600

863280

130.8

... More
मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) (G.K.N.2023-24,Item no.185(य))

6600

904530

137.05

... More
Extra charges for disposal of excavated/re-handled material in required profile laid in uniform layers 15 cm and given side slopes well dressed having layer thickness including loading and un-loading wherever required with cost of dewatering wherever required complete in all respect (BSR Irri. Dept.2023 Item No.9(a) Chapter V)

6600

56430

8.55

... More
ISI marked low Density Poly Ethylene (LDPE) film black, High Impact resistant, Heavy duty Grade 030 in thickness of 125, 200 & 250 micron in the form of flat sheet of 6 to 9 metre width without having any joints as per IS: 2508-1984 (BSR Irri. Dept.2023 Item No.25 Chapter II) 250 MICRON

1112.8

190288

171

... More
Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. (BSR Irri. Dept.2023 Item No.39 Chapter IX)

3994

212081

53.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.