Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 5,84,160Document Cost
₹ 2,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_435457_5Bid Award Id
ViewTender No
NIB - Jaisalmer-04/2024-25 PMKSY 2.0Tender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
15 to 30 cm hammered single stone pitching with all lift, with supply.
504
1823
919079.28
... More
Morrum, building debris, lime, gravel, stone ballast less than 40 mm nominal size for various distance transportation including loading, unloading and stacking. (The length of the transport will be calculated from the nearest route and not by road) lead upto 3Km
6347.7
245
1560772.48
... More
Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (SAM BSR RD&PR 2024-25) Hard soil
13290.93
83
1103944.98
... More
Cement concrete mix (1:4:8) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm (SAM BSR RD&PR 2024-25)
127.12
3556
452126.19
... More
Cement concrete mix (1:5:10) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm including watering, loading and un-loading wherever required complete in all respect.(SAM BSR RD&PR 2024-25)
63.84
3289
210018.28
... More
R.R. stone Masonry (using R. R. stones where stones to be not less than 15 cm in size in any direction) for foundation including all leads of all construction materials including curing etc. complete in 1: 6 Cement Mortar (SAM BSR RD&PR 2024-25)
1264.33
4007
5066339.3
... More
R.R. stone Kharnja in 1: 6 Cement Mortar and laid in position complete including all leads of all construction materials including curing and finishing(SAM BSR RD&PR 2024-25)
115.2
717
82636.42
... More
50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20mm,
1762.67
430
759465.29
... More
25 mm thick cement plaster on wall with 1:4 ratio with joint scraping and regular leveling for 14 days (SAM BSR RD&PR 2024-25)
2150.05
331
712268.56
... More
Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio (SAM BSR RD&PR 2024-25)
820.3
128
105556.2
... More
P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span (SAM BSR RD&PR 2024-25)
463.01
2209
1022870.01
... More
Leveling the excavated soil, in the Catchment area and pouring water and ramming with a rammer.(SAM BSR RD&PR 2024-25)
670.72
71
48029.9
... More
Unpolished rough kota stone / jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped.
4398.95
689
3032724.8
... More
Supply and laying of HDPE Geomembrane 500 micron,excluding GST (Horticulture letter 4065-4144 Date 2023)
15377.26
101
1553103.16
... More
Laying, welding & testing of 1mm HDPE Liner (WRD BSR CH-V ITEM NO 45)
15377.26
18
276790.66
... More
150cm height fencing with iron post 35X35X5mm at 3m distance and 30cm deep in ground, cement concrete 1:3:6 (.30X.30X.60m) corners and every 10th post supported by 35X35X5mm iron post, along with black barbed wire in 4 lines, GI staple wire between 2 posts including tying and fitting. Analysis for upto 27m length fencing, including earth excavation work (0.54 cubic meter concrete)
1536
341
523944.96
... More
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. (SAM BSR RD&PR 2024-25), 2A
260.2
143
37448.56
... More
Gate and Yojna Disply Board of work details
12
3500
42000
... More
Lumpsump fitting of iron door, inlet/outlet iron grill jaali, disply board and photograph / Yojna Disply Board
58
1500
87000
... More
Sewan grass seeds sowing on ridge in 03 row
27000
1
33750
... More
Sewan grass seeds
60
200
12000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements