Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Eprocure
Opening Date18 Dec 2024
Closing Date1 Jan 2025
Tender Amount₹ 49,02,000 
Notes
Download

Costs

  • EMD

    ₹ 98,040
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Summary

Sn_7 Wdsc Tonk

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation including loading unloading disposal and dressing of Excavated earth with in inntial lead of 50mtr and lift up to 1.50 mtr in dry or moist including dressing of excavated area dewatering wherever required complele in all respect (Excavation work to be Executed by machine) as per BSR on Irrigation tonk circle. Item no. 1 A. Hard I denese soil.

83.73

81

6782.13

... More
B. Hard soil mixed with kanker boulder morrum.

89.2

83

7403.6

... More
Soft/Disintegrated rock item no 02 A

178.4

139

24886.8

... More
cement concrete well mixed in cement mortar(1:4:8) laid in position complete including curing Aggregate size upto 20mm. (GKN 170 A)

96.52

4090

394846.91

... More
Random rubble stone masonary in cement sand mortar(1:6) for foundation (GKN 166A)

580.8

3561

2068803.79

... More
Cement plaster including smooth finishing in cement mortar (1:4)25mm thick (GKN 76A)

375.04

302

113295.83

... More
Cement concrete coping in cement mortar1:2:4.With Aggregate12 mm thick (GKN16)

84.02

4946

415604.93

... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. ( Item no-16-A WRD BSR 2022 tonk less 10% C.P. ) with initial lead of 250m. Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived isat least 90% 221.3x4+24/2x2+1/2 =

12299.93

94

1162343.39

... More
compaction of earth or highly weathered strata By mannually or plain roller (density 90% of proctor)(Item no-18a wrd 2022 Tonk)

12299.93

21

265678.49

... More
watering of earth includding cost of carriage of water with source of water is up to 5 km.(Item no-28a wrd 2022 Tonk)

12299.93

9

122876.3

... More
E/W in excavation in foundation in soil up to 1.5 m (BSR GKN Item No.2B)

137.16

178

24477.57

... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m( Item no. 20 WRD BSR tonk 2022 less 10% C.P.)

432

72

31492.8

... More
15 to 30 cm thick dressed Stone pitching work with all lead and lift to site (GKN Bsr item no-167) BSR 2024-25

24.9

1448

36075.37

... More
feV~Vh dk fofHkUu nwjh ds fy, ifjogu lkexzh dks pku] mrkjuk o LVsfdax lfgrA ¼ifjogu dh yEckbZ fudVre :V ls x.kuk dh tkosxh u dh lMd ekxZ ls½ (Item no. 185 b up to 2 km. GKN BSR 2023-24

1530

101

155325.6

... More
Sign Board

3

1600

4800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.