Watershed Development And Soil Conservation Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 3,88,789Document Cost
₹ 2,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WDSC_438422_1Tender No
NIT 06/2024-25 BID NO 06 BLOCK SAJJANGARHTender Authority
Watershed Development And Soil Conservation Department ViewPurchaser Address
-Website
http://https://www.karnataka.gov.in/watershed/Pages/home.aspx
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard soil mixed with Kankar / boulders, Morrum
5989.72
103
619935.5
... More
Soft / Disintegrated rock
1236.15
139
172443.06
... More
Hard rock without blasting
1540.16
206
317426.56
... More
Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of 20mm size
559.35
3991
2232500.91
... More
cement mortar for apron 1;6, 23cm kharanja for thickness
867.35
510
442901.05
... More
Random rubble stone masonary in cement mortar 1:6 forFoundation and super structure
3290.35
2915
9591642.22
... More
Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB.
526.97
4844
2552814.88
... More
Cement plaster in cement sand mortar 1:4, 25mm thick with curing.
3812.65
277
1056751.51
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench
1042.97
83
87296.25
... More
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required.
1042.97
68
71338.87
... More
Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench
1042.97
179
186889.08
... More
Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.
8327.72
69
577860.21
... More
Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone
346.7
1158
401568.74
... More
Dismelting old cement plaster, skirtin raking out joints and cleaning the surface. (BSR RDPR 2023 Item No.115)
961.96
34
32889.24
... More
Providing and fixing reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wier) all complete. (BSR RDPR 2023 Item No.61)
2731.62
84
229756.64
... More
Providing of centering & shuttering with steel sheets in RCC for roof, slab, chajja, linten etc. lift upto 4.5m and removing of framework etc. (BSR RDPR 2023 Item No.93 b)
474.71
313
148888.04
... More
Iron works for grill/gate etc complete including cutting, mounting and installation of flat edges, guide Tee and track channel or any part of gate with cost of material complete in all respect (BSR RDPR 2023 Item No.63)
2935.04
93
275453.22
... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
4770.74
21
103047.98
... More
Watering of earth including cost of carriage of water when source of water is up to 3 km lead
4770.74
18
88878.89
... More
Dressing of uneven embankment in required profile
3822.48
10
40594.74
... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m
917.86
72
66911.99
... More
Supply of Dhaman grass Seeds
23.2
120
2790.96
... More
Supply of Ratanjot/Castor Seeds
32
60
1939.52
... More
Sowing of Dhaman grass Seeds in different rows
2320
1
2644.8
... More
Sowing of Ratanjot/Castor Seeds in different rows
1600
1
1824
... More
Supply stone, spali and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm thickness
12.88
1313
16912.73
... More
display Board (including painting, writing and installation on site)
19
3000
57000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements