Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Civil And Construction
Eprocure
Opening Date22 Nov 2024
Closing Date10 Dec 2024
Tender Amount₹ 44,25,000 
Notes
Download

Costs

  • EMD

    ₹ 88,500
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
hard/dense soil (WRD BSR 2023 item no. 1b page11)

427.18

86

36891.59

... More
hard soil, kankar/ boulders, murrum (WRD BSR 2023 item no. 1c page11)

284.79

108

30805.65

... More
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी पत्‍थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। ( item no. RD / 170 a)

183.58

3598

660667.99

... More
नींव तथा कुर्सी में पत्‍थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्‍द करना तथा तराई आदि सहित।    इकाई :  घन मीटर 1: 6 elkys esa ( item no. RD / 166 a)

285.55

2675

763865.88

... More
एनीकट हेतु पत्‍थर की चिनाई सीमेंट-बजरी मसाले में।   1:6 elkys esa  for Superstructure ( item no. RD / 166 a, )

306.72

2675

820481.97

... More
सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्‍थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । (item no. RD / 16 )

78.1

4492

350847.95

... More
सीमेन्‍ट प्‍लस्‍टर दीवार पर 1:4 अनुपात में सीमेन्‍ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 fe-fe-    इकाई :  वर्ग मीटर (item no. RD / 76 a)

271.77

266

72318

... More
पत्‍थर या ईंट के काम पररेज्ड एण्‍ड कट (Exposed) टीप 1:3 अनुपात में सीमेंट बजरी मसाले में मय 14 दिन तक नियमित तराई के।   ( item no. RD / 79a, 79c)   

126.15

179

22597.64

... More
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्‍थर को अलग करना (Sorting of grass & pebbles) एवं बण्‍ड (Bund) का सेक्‍शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. (item no. RD / 196 b)

-

-

-

... More
a मशीनरी कार्य सख्‍त मिट्टी (in Hard Soil)      

3123.03

53

166582.42

... More
Compaction of earth or highly weathered strata by manually or plain roller. (density 90% of Proctor). (WRD BSR 2023/Ch-V/ Item no. 18a)

3123.03

22

70970.86

... More
Watering of earth including cost of carriage of water when source of water up to 1 Km. (WRD BSR 2023/Ch-V/ Item no. 28a, b)

3123.03

11

35769.31

... More
uhao rFkk dqlhZ esa iRFkj dh os j)k&ksdk fpukbZ] xkjk elkys esa ;k fcuk elkys es lw[ks iRFkj esaA (Item No. RD / 26b)

138.01

1615

223002.08

... More
15 ls 30 lseh e¨Vs gFk¨M+s ls rjk'ks gq, ,dy iRFkj dh fifpax leLr mBku ds lkFk] vkiwfrZ ds lkFkA (Item No. RD / 167)

444.77

1132

503764.29

... More
Dag belling 5 to 7.5cm. deep (BSR 2024-2025 Item no. 6B)

547

1

935.37

... More
Cleaning of Shrubs and bushes including cutting etc. (BSR 2024-25 Item no. 191)      

3623.88

2

10364.28

... More
Benching base and depositing the excavated material including dressing etc. complete within initial lead upto 50m and lift upto 1.5m (WRD BSR 2023 item no.20 page no.14)

923.07

88

81389.85

... More
JCB Machine / tractor with scraper using for Earth work excavation,Braking of clods of excavated earth, Sorting of grass & pebbles and Bund section formation as per profile With ups and down movement ,initial Lead 250m and lift upto 3 mtr.etc. Draft based on chapter 5th of irrigation page number 32 to 34 ( valid from dated 01/02/2017 ) Unit 1 cubicmeter machinery work in hard soil.  (BSR 2024-25 Item no. 196 b)

3290.55

53

175517.77

... More
Compaction of Soil with using 8 to 10 Ton roller etc. with 90% procter density. (BSR 2024 - 25 Item no. 144 )     

3290.55

25

84830.3

... More
Watering of earth incluing cost of carriage of water when source of water upto 2 km. (WRD BSR 2023 item no. 28 a&b page14,15)

3290.55

16

52643.49

... More
Dressing of uneven embankment in required profile (WRD BSR 2023 Item no. 23 page17)

2735

13

35551.44

... More
Supply of gravel/kankar soil including loading,unloading at work site (BSR 2024-25 Item No. 135a)

246.79

270

66633.57

... More
Spreading of gravel in 15cm layer with required grade and camber including dressing. (BSR 2024-25 Item No. 145)

246.79

69

17048.32

... More
Excavation including loading & Unloading,desposal and dressing of excavated earth within initial lead of 50 mtr. & 1.5mtr. lift in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect

-

-

-

... More
(a) hard/dence soil(WRDBSR 2023 item no. 1b pg 11)

168.75

86

14572.41

... More
(b) Hard soil mixed with kankar/boulder,morrum(WRD BSR 2023 ITEM NO.1c Pg 11)

112.5

108

12169.24

... More
Supply & fixing of 15 to 30cm. thick Dry stone pitching of stone hammer dressed properly fixed in defined shape for bund (BSR 2024-25 item 167)

56.95

1132

64503.85

... More
Dry Stone masonry including all leads of all construction material(WRD 2022 item no. 5 page no.22)

15.19

1438

21840.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.