Watershed Development And Soil Conservation Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Watershed Development And Soil Conservation Department - WDSC Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date7 Feb 2024
Closing Date13 Feb 2024
Tender Amount₹ 24,29,000 
Notes
Download

Costs

  • EMD

    ₹ 48,580
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Continious contour Trench Dag belling work up to 2.5 to 5 cm depth. As per BSR 2023item no 6a

4050

4090

1.01

... More
lw[kh ;k xhyh feV~Vh [kqnkbZ dk;Z dVkbZ esa e; HkjkbZ] [kkyh djkbZ o [kqnh gqbZ feV~Vh dk fuLiknu izkjfEHkd yhM 50 eh- o mBkku 1-5 eh- fuLiknhr feV~Vh dks lery ;k njslh djuk ,oa vko';drkuqlkj Mh okVfjax djukA ¼v½ lk/kkj.k feV~Vh] dadj@cksYMj] ewjeZ ¼70 izfr'kr½ ¼ch,lvkj ty lalk/ku foHkkx 2022½ ¼vkbZVe ua- 1 lh ist ua- 11½ Hard Soil / Hard Murram 100% of total Quantity

891

92218

103.5

... More
Plantation Work A .Pit digging (size 0.45mx0.45mx0.45m) As per BSR WRD 2022 S.no -1(c,) Stony / Murram soil (100%)

61.01

6314

103.5

... More
Cost of saplings with 10 % mortality (Forestry plant as per market rate)

736

29440

40

... More
Plantation work BSR- 2023 S.no. 158, (a) (b) Ordinary Soil (100%)

669.48

4552

6.8

... More
Transportation Cost of saplings from 50 km distance Including loding unloding.Lumsum

736

5152

7

... More
Rehandling of plants by Head in plantation Area up to 1km BSR Forest 2020 S. No. C2.1v

669.48

5382

8.04

... More
Thawala making of New plants.Minimum 0.15 cm Halfdia.BSR 2023 S. No. 162(a)

669.48

3039

4.54

... More
3 times Nirai gudai up to depth of 15 cm and 45 cm diameter BSR 2023 S. No. 161

2008.44

4559

2.27

... More
18 times watering to the plant with 15 liters per plant BSR 2023.S. No. 160

12050.64

39526

3.28

... More
Cost of water tanker 4000 liter per trip BSR 2023 Material no.6

62

29760

480

... More
Cost of grass seed on CCT in 4 raw (1KG/100Mtr) (as per market rate)

54

5400

100

... More
Cost of grass seed in pasture land area @ (8KG/ ha.) (as per market rate)

19

1900

100

... More
Sowing of grass seed on bunds in Four rows BSR 2023 S. No. 159

5400

5994

1.11

... More
Watch & Ward (two Member/24 Hr)

730

186150

255

... More
Construction of Main Gate Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect(A) Hard soil mix with kankar/ boulders, morrum

3.45

357

103.5

... More
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्‍थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित।

0.52

2008

3854.01

... More
नींव तथा कुर्सी में पत्‍थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्‍द करना तथा तराई आदि सहित।सीमेंट बजरी 1:6 in foundation and plinth

5.2

16636

3199.23

... More
सीमेंट कंक्रीट (coping)1 सीमेंट : 2 बजरी : 4 पत्‍थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित ।   

0.46

2181

4741.68

... More
ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि।

300

31683

105.61

... More
सीमेंट प्‍लास्‍टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। 20MM      item no. 77b bsr ps bhainsrodgarh 2023

15.12

2594

171.59

... More
इनामिल पेन्‍ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना।

15.12

1984

131.26

... More
2nd Year A .Pit digging (size 0.45mx0.45mx0.45m) As per BSR WRD 2022 S.no -1(b,) Hard Soil (100%)

12.2

1021

83.7

... More
Cost of saplings with 10 % mortality (Forestry plant as per market rate)

147

5880

40

... More
Plantation work BSR- 2023 S.no. 158, (a) (b) Ordinary Soil (100%)

134

742

5.54

... More
Transportation Cost of saplings from 50 km distance Including loding unloding.Lumsum

147

1029

7

... More
Rehandling of plants by Head in plantation Area up to 1km BSR Forest 2020 S. No. C2.1v

147

1181

8.04

... More
Thawala making of New plants.Minimum 0.15 cm Halfdia.BSR 2023 S. No. 162(a)

134

608

4.54

... More
3 times Nirai gudai up to depth of 15 cm and 45 cm diameter BSR 2023 S. No. 161

2008.44

4559

2.27

... More
18 times watering to the plant with 15 liters per plant BSR 2023.S. No. 160

12050.64

39526

3.28

... More
Cost of water tanker 4000 liter per trip BSR 2023 Material no.6

45

21600

480

... More
Watch & Ward (two Member/24 Hr)

730

186150

255

... More
3rd Year A .Pit digging (size 0.45mx0.45mx0.45m) As per BSR WRD 2022 S.no -1(b,) Hard Soil (100%)

6.1

510

83.7

... More
Cost of saplings with 10 % mortality (Forestry plant as per market rate)

74

2960

40

... More
Plantation work BSR- 2023 S.no. 158, (a) (b) Ordinary Soil (100%)

67

371

5.54

... More
Transportation Cost of saplings from 50 km distance Including loding unloding.Lumsum

74

518

7

... More
Rehandling of plants by Head in plantation Area up to 1km BSR Forest 2020 S. No. C2.1v

74

594

8.04

... More
Thawala making of New plants.Minimum 0.15 cm Halfdia.BSR 2023 S. No. 162(a)

67

304

4.54

... More
3 times Nirai gudai up to depth of 15 cm and 45 cm diameter BSR 2023 S. No. 161

2008.44

4559

2.27

... More
18 times watering to the plant with 15 liters per plant BSR 2023.S. No. 160

12050.64

39526

3.28

... More
Cost of water tanker 4000 liter per trip BSR 2023 Material no.6

45

21600

480

... More
Watch & Ward (Two Member/24 Hr)

730

186150

255

... More
Vriksh Kunj Shiv mandir Bhawanipura 1 st year Barbed wire Fencing Dag belling work up to 2.5 to 5 cm depth. As per BSR 2023item no 6a

531

536

1.01

... More
Jungle Clearance including cutting of Shrubs As per BSR 2023tem no 191

2059.8

5211

2.53

... More
180cm ऊंचाई की फेंसिंग लोहेका पोस्ट50X50X6mm के 3मी.दूरी से व 45cmजमीन में सीमेंटकंक्रीट 1:2:4(.30X.30X.60m)कोर्नर व प्रत्येक10वां पोस्ट को50X50X6mm लोहेके पोस्ट से सपोर्ट कियाहुआ,साथ में 6लाईन व2 डाईगोनल लाईन में कालाकांटेदार तार, 2पोस्ट के बीच जीआई. स्टेपल तार से बांधना व फिट करना,मिट्टी खुदाई कार्य सहित       As per BSR 2023item no 195a

531

327271

616.33

... More
Pipe Line lw[kh ;k xhyh feV~Vh [kqnkbZ dk;Z dVkbZ esa e; HkjkbZ] [kkyh djkbZ o [kqnh gqbZ feV~Vh dk fuLiknu izkjfEHkd yhM 50 eh- o mBkku 1-5 eh- fuLiknhr feV~Vh dks lery ;k njslh djuk ,oa vko';drkuqlkj Mh okVfjax djukA ¼v½ lk/kkj.k feV~Vh] dadj@cksYMj] ewjeZ ¼70 izfr'kr½ ¼ch,lvkj ty lalk/ku foHkkx 2022½ ¼vkbZVe ua- 1 lh ist ua- 11½ As per BSR WRD 2022 S.no -1(c,) Hard Soil / Hard Murram 100% of total Quantity

58.05

6008

103.5

... More
P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2 .) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant.

215

31605

147

... More
supply of Fittings (tee, bend, joiner valve, nipple, hose pipe) etc LS

1

8000

8000

... More
Plantation Work A .Pit digging (size 0.45mx0.45mx0.45m) As per BSR WRD 2022 S.no -1(c,) Stony / Murram soil (100%)

28.78

2978

103.5

... More
Cost of saplings with 10 % mortality (Forestry plant as per market rate)

275

13750

50

... More
Plantation work BSR- 2023 S.no. 158, (a) (b) Stony / Murram soil(100%)

250

1700

6.8

... More
Transportation Cost of saplings from 50 km distance Including loding unloding.Lumsum

275

1925

7

... More
Rehandling of plants by Head in plantation Area up to 1km BSR Forest 2020 S. No. C2.1v

250

2010

8.04

... More
Thawala making of New plants.Minimum 0.15 cm Halfdia.BSR 2023 S. No. 162(a)

250

1135

4.54

... More
3 times Nirai gudai up to depth of 15 cm and 45 cm diameter BSR 2023 S. No. 161

750

1702

2.27

... More
Watch & Ward with watering

365

93075

255

... More
Construction of Main Gate Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect(A) Hard soil mix with kankar/ boulders, morrum

3.11

321

103.5

... More
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्‍थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित।

0.52

2008

3854.01

... More
नींव तथा कुर्सी में पत्‍थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्‍द करना तथा तराई आदि सहित।सीमेंट बजरी 1:6 in foundation and plinth

4.74

15164

3199.23

... More
सीमेंट कंक्रीट (coping)1 सीमेंट : 2 बजरी : 4 पत्‍थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित ।   

0.49

2323

4741.68

... More
ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि।

250

26402

105.61

... More
सीमेंट प्‍लास्‍टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। 20MM      item no. 77b bsr ps bhainsrodgarh 2023

15.12

2594

171.59

... More
इनामिल पेन्‍ट का लेप करना 3 तह में ताकि इकसार आभा हो जाये (To give even shade) नये कार्य/पुराने कार्य पर सम सरफेस बनाना।

15.12

1984

131.26

... More
2nd Year A .Pit digging (size 0.45mx0.45mx0.45m) As per BSR WRD 2022 S.no -1(b,) Hard Soil (100%)

4.56

381

83.7

... More
Cost of saplings with 10 % mortality (Forestry plant as per market rate)

55

2750

50

... More
Plantation work BSR- 2023 S.no. 158, (a) (b) Ordinary Soil (100%)

50

277

5.54

... More
Transportation Cost of saplings from 50 km distance Including loding unloding.Lumsum

55

385

7

... More
Rehandling of plants by Head in plantation Area up to 1km BSR Forest 2020 S. No. C2.1v

55

442

8.04

... More
Thawala making of New plants.Minimum 0.15 cm Halfdia.BSR 2023 S. No. 162(a)

50

227

4.54

... More
3 times Nirai gudai up to depth of 15 cm and 45 cm diameter BSR 2023 S. No. 161

750

1702

2.27

... More
Watch & Ward with watering

365

93075

255



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.