Water Resources Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Dec 2024
Closing Date16 Jan 2025
Tender Amount₹ 3,88,70,759 
Notes
Download

Costs

  • EMD

    ₹ 7,77,415
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum

10494.24

118

1238320.32

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : (d) Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc.

5263.36

340

1789542.4

... More
Add extra over item No. 1 c , 1d, 2 and 3 for centering and shutterring for each additional 1 m height or part there of above initial height of 5.0 m from base/floor level.

2031.04

25

50776

... More
Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786)

34020.33

89

3027809.37

... More
Providing and Laying in position of Cement concrete Design mix M15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cementsand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement.Well graded crusher broken stone aggregate of maximum size upto;(For mix design Cement content considered 320 kg/ cum of concrete) (C)40 mm

528.24

5420

2863060.8

... More
Providing and Laying in position of Cement concrete Design mix M- 15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 320 kg/ cum of concrete) (d) 20 mm

4534.72

5470

24804918.4

... More
Add extra over item No. 1 to 7 (a) For each subsequent height of 3.0 meter or part thereof above initial lift of 5.0 m from ground level. (upward and downward)

1674.62

160

267939.2

... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement (a) In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)

4534.72

140

634860.8

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and unloading wherever required with cost of dewatering wherever required.

7701.75

91

700859.25

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un loading wherever required with cost of dewatering wherever required. Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required

5069.25

99

504390.38

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un loading wherever required with cost of dewatering wherever required. Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required

2436.75

108

263169

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un loading wherever required with cost of dewatering wherever required. Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required

195.07

116

22725.66

... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (c) With lead beyond 750 m and up to 1250 m (for average lead 1 Km) Deduct in item no 16 (a) to (d) above if Standard Proctor's density to be achived is at least 90%

495

127

62988.75

... More
Compaction of earth or highly weathered strata (a) By manually or plain roller. (density 90% of Proctor)

495

25

12375

... More
Watering of earth including cost of carriage of water when source of water (a) up to 1 km

495

12

6237

... More
Supplying, Laying & consolidation of quarry rubbish / Murrum / Murda to required grade & camber in layers not exceeding 15 cm. thickness (loose) by road roller as per specifications including dressing etc. complete

67.46

584

39396.64

... More
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts (a) 23 cm thickness (± 5 % thickness tolerance)

42.38

1644

69672.72

... More
Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates, including cost of stones in position complete in all respects.

540

1090

588600

... More
Supply of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826 -1979 having mesh of 10 cm x 10 cm (surface area of crate will be measured) made of wire of 5 mm diameter.

2457

389

955773



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.