Water Resources Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 8,65,240Document Cost
₹ 5,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRDAS_340382_21Bid Award Id
ViewTender No
03/2023-24 PHLC I BanswaraTender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting
1968
450672
229
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite and other hard rock requiring nominal blasting
1733.65
556501
321
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads and lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure and royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate.
1793.15
796158
444
... More
Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour
1732
39836
23
... More
Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m. depth
122
15860
130
... More
Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete
81
17739
219
... More
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete.
1326
103428
78
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
2908
639760
220
... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)
18150
1724250
95
... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m ( Km)
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.2 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.Add extra over item code 5.10.1 for lead beyond 250m and upto 750m (for average 1/2Km).
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
5.10.4.1 Extra lead over item code 5.1.1 to 5.8.3 of excavated material.
Add extra for each subsequent lead of 1 km or part there of beyond 5 Km
27061
6203734
229.25
... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km
5.28.2.1 Watering of earth including cost of carriage of water when source of water is
Beyond 1 Km but up to 5 Km extra per Km
27061
430269
15.9
... More
(ii)Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. at least 98% of Standard Proctor s density
27061
1109501
41
... More
Dry boulder filling in required profile with filling of voids etc. complete including all lead and lifts, and well finished surface
257
277560
1080
... More
Supplying and laying aggregate in layers and profile as specified including all leads and lifts. This item is to be used only for laying filter / inverted filter River gravel 20 to 40 mm size
228
223440
980
... More
Supplying and laying sand of grade as per design requirement in required profile including all lead and lifts.
This item is to be used only for laying filter / inverted filter
228
393984
1728
... More
Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect
4376
122528
28
... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads and lifts
1221
938949
769
... More
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead and lifts 23 cm thickness ( 5 % thickness tolerance)
1558
2273122
1459
... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm
9.41.2 AS PER NOTE NO 18.2
Add extra with the permission of Superintending Engineer, Rs 175.00 per cum of concrete if computerised mobile transit mixer (i.e Fiori) is used.
3554
20044560
5640
... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm
9.41.2 AS PER NOTE NO 18.2
Add extra with the permission of Superintending Engineer, Rs 175.00 per cum of concrete if computerised mobile transit mixer (i.e Fiori) is used.
946
5899256
6236
... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.
946
189200
200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements