Water Resources Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 86,679Document Cost
₹ 1,000Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRDAS_436059_3Bid Award Id
ViewTender No
NIT No 12/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://water.rajasthan.gov.in/wrd
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
5397.2
25
134930
... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km.
5397.2
12
68004.72
... More
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts.23 cm thickness (± 5 % thickness tolerance)
373.48
1644
614001.12
... More
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface.
196.02
1187
232675.74
... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts.
108.9
753
82001.7
... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 40MM
43.54
5340
232503.6
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
26.57
160
4251.2
... More
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(a) Ordinary
4655
1
6749.75
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Soft soil
280.26
92
25783.92
... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.
6333.25
109
690324.25
... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)
6333.25
25
158331.25
... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km.
6333.25
12
79798.95
... More
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts.23 cm thickness (± 5 % thickness tolerance)
503.9
1644
828411.6
... More
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface.
280.26
1187
332668.62
... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts.
155.7
753
117242.1
... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 40MM
21.1
5340
112674
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
12.95
160
2072