Water Resources Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date19 Jun 2019
Closing Date17 Jul 2019
Tender Amount₹ 19,87,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brass Chak nut for lifting

4

-

50

... More
Shaft with thread cutting complete

50

-

86

... More
Operation and controlling including watch and ward of head /cross regulator /gate for feeder main canal / distributory. Per day three shift (24 hour )(i) where ever there is head cum cross regulator no separate staff will be takaen

90

-

567

... More
Munshi survey amin /Density observer/ Record keeper / time keeper/Gate keeper /core observer /laboratory assistant / Gauge reader/ Telephon Assistant Grade II

240

-

275

... More
Supply of well stiched earth filled bagof capacity weight not less than 40 kg per bag at site etc complete plastic bag .

2000

-

11

... More
Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect Above 30 thick

390

-

65

... More
Removal of shaft bend

4

-

300

... More
Covering plates, pin for shaft & gate, key for opening and closing of gate

20

-

86

... More
Add extra over labour charges as in item no 22(a) for replacement if necessary for following components of gate.

-

-

-

... More
cost of diesel

24

-

58.42

... More
Hydraulic excavator/ loader likeJCB/Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity

30

-

900

... More
Watch and ward office building after office hours

365

-

378

... More
Shaft with thread cutting complete

4

-

500

... More
Post for lifting arrangements

4

-

500

... More
Brass Chak nut for lifting

20

-

450

... More
Painting stanadard type gauge at site with black read and white un washable paint including cost of labour and material

100

-

145

... More
Plaster in cement sand mortar :14 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20 mm

200

-

206

... More
Cutting and clearance of jungle, bushes, shrubs, Ankra / Ipomoea, Julicflora typna etc. on canal and bunds in dry /moist /slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting . ordinary

21000

-

0.6

... More
Pumping Set 5 to 10 HP

15

-

300

... More
Tractor up to 40 HP

15

-

515

... More
Light vehicle Driver for Jeep/car/ station wagon/ etc (Liscence holder )Grdaer I

180

-

325

... More
Cement concrete nominal mix (1:1.5:3) M-20 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size up to20 mm.

180.6

-

4416

... More
Making standard type cement gauge including engraving letters and painting including scaffolding etc

100

-

380

... More
Covering plates, pin for shaft & gate, key for opening and closing of gate

4

-

200

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.in cement sand mortar (1:6)

100

-

2613

... More
Computor operator having knowledge of MS office/ Excel? Power point without computor

90

-

325

... More
Fixing Bracket for shaft

50

-

86

... More
Cost of diesel

96

-

58.42

... More
cost of diesel

217.5

-

58.42

... More
Labour charges and necessary material & machine required for repair of gates of, canal escape, canal regulator, sluice well etc at site including oiling and greasing with material etc. complete.

4

-

7000

... More
Empty bag of 50 kg capacity in good condition . Plastic/polyethen

10000

-

5

... More
Add extra for repair of following components of gate

-

-

-

... More
Removal of shaft bend

50

-

86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.