If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 4,51,47,000 
Notes
Download

Costs

  • EMD

    ₹ 9,02,940
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for lead beyond 250 m and up to 750 m (for avarage 1/2 km )

38867.4

8

340089.75

... More
Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required for 4 Extra Lift (1.50 to 3.00 m)

142162.95

8

1208385.08

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.50 m including dressing of excavated area, dewatering wherever required complete in all respect. Hard soil/Dense soil Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.

11424

115

1313760

... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm

221.4

5615

1243161

... More
Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm (For mix design Cement content considered 400 kg/ cum of concrete)

2967.3

6288

18658382.4

... More
Add extra with the permission of Superintending Engineer, 2. Rs 175.00 per cum of concrete if computerised mobile transit mixer (i.e Fiori) is used.

3188.7

175

558022.5

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.

17153.4

220

3773748

... More
Supplying & fixing 6 mm thick rubber/ water seal of approved quality in construction/ contraction joints as per drawing complete in all respect. 305 MM wide

295.9

675

199732.5

... More
Supplying of M.S. reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS:1786-1985)

45113.31

89

4015084.59

... More
Extra labour charges for obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.

2967.3

200

593460

... More
Geological investigation (where directed) Checking of retrogression below spill arrangement, logging of bore log, rock strata classification, suitability of structure foundation and suggesting remedial measures for control of excessive seepage from foundation or body of the dam etc. by the Geological expert having experience more than 15 years and submission of final report.

10

5300

53000

... More
Add extra over item No. 1 to 7 Add Extra for RCC work for Retaining wall, wing wall, returns, divide wall, Pier,

2967.3

190

563787

... More
(f) Add extra labour charge if concrete is done on water retaining structures.

3188.7

200

637740

... More
Add extra over item No. 1 to 7 (a) For each subsequent height of 3.0 meter or part thereof above initial lift of 5.0 m from ground level. (upward and downward) for concrete work

1845

160

295200

... More
Add extra over item No. 1 c , 1d, 2 and 3 for centering and shutterring for each additional 1 m height or part thereof above initial height of 3.0m from base/floor level. For all 9 Extra Lift

18480

25

462000

... More
Dewatering by pumping all water to maintain desired water level. Pumping Sets of 16-30 HP (For Foundation Concrete)

138

525

72450

... More
Cost of diesel excluding contractor profit and GST input. Pumping sets above 16 to 30 HP. Provision for diesel per km/ or per hr. (in litres)

1766.4

94

166041.6

... More
Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete.Plastic bag

94286

16

1508576

... More
Labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including lead up to 3 km and lift up to 8 meter from NSL complete excluding cost of empty cement bags.

94286

26

2451436

... More
supplying of wire crates in required sizes made of hot dipped G.I. Wire conforming to IS 4826-1979 having mesh of 10cm x 10cm (surface area of crate will be measured )made of wire of 5mm diameter

6188.4

389

2407287.6

... More
Filling crates with stone, in position at site including hinging with hot dipped G.I. Wire 5 mm dia, excluding cost of wire crates , including cost of stones in position complete in all respects.

1423.2

1090

1551288

... More
SOIL PHYSICAL TEST permeability test in lab

18

2200

39600

... More
standard penetration test (only for N value and safe bearing capacity

18

7000

126000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.