Water Resources Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date3 Sep 2024
Closing Date14 Sep 2024
Tender Amount₹ 37,57,000 
Notes
Download

Costs

  • EMD

    ₹ 75,140
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Watering of earth including cost of carriage of water when source of water is (a) up to 1 Km.

1487.5

18742

12.6

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (c) Hard soil mixed with Kankar / boulders, Morrum

321.15

37895

118

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm.

13.86

70588

5093

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for Super Structure including curing with all leads of all construction materials including curing etc. complete.In cement sand mortar 1:6

25.95

115607

4455

... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm

254.87

1552413

6091

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : (c) Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.

564.8

124256

220

... More
(a) Drilling holes of 35 mm diameter for anchor rods. i) Upto 1.50 m. depth.

318

41022

129

... More
(b) Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete.

212

51940

245

... More
( c) Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete.

1224.3

88149

72

... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.(ii)Tor or ribbed bars (IS :1786-1985).

11760.91

1046720

89

... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: (b) 75mm.

74.4

35712

480

... More
Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness 20 mm.

500.8

157251

314

... More
Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. (b) In cement mortar Poor Construction (Ded. Rate 30% )

19.88

8024

403.76

... More
Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of dewatering wherever required and all applicable taxes and levies etc. complete in all respect. (a) Earth / Soil

321.15

28261

88

... More
Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required.

400.8

8016

20

... More
Construction of tubewell upto 100m depth and above to accommodate housing and assembly pipe in all types of alluvium strata by rotay drilling method with ''code of practice for construction and testing of tubewells (IS: 2800 (Part-II) : 1991 and IS:2800(Part-II): 1971 Both amended up to date) with supply of bail plug if necessary.The work will not include cost of housing pipe and strainer pipe assembly cost, gravel and development work. Work would be deemed completed only after obtaining sound free during pumping. 250mm nominal bore

30

47910

1597

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.(c) Hard / Dense soil

1.96

186

95

... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm.

0.16

903

5648

... More
Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (b) Broken ballast 20 to 40 mm size

0.66

774

1174

... More
Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (a) Broken ballast 40 to 80 mm size

0.66

691

1047

... More
Supplying and laying sand of grade as per design requirment in required profile including all lead and lifts. This item is to be used only for laying filter / inverted filter

0.33

593

1799

... More
Supplying and fixing Pre-cast RCC Rinngs at the mouth of recharge shaft of M20 mix with 40mm thickness Diameter 900mm

2.5

1915

766

... More
Supply of strainer pipes made of ERW M.S. Black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS 8110-1985 (a)250mm Nominal bore

30

93780

3126



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.