Water Resources Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Eprocure
Opening Date23 Apr 2021
Closing Date3 May 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hard soils mixed with kankar/Boulder/Morum

32.6

-

73

... More
Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area, dewaterting wherever required complete in all respect.

-

-

-

... More
Soft/ Disintegrated Rock

65.2

-

100

... More
Hard Rock not required blasting

65.2

-

147

... More
Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate.

163

-

281

... More
Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.

-

-

-

... More
In cement mortar

20.12

-

105.7

... More
Preparation of foundation of structure including removal of all loose, stones, silt and final washing. By manual labour

122

-

20

... More
Cement concrete (1:3:6) M-10 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded broken stone aggregate of maximum size upto 40mm.

18

-

3265

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5

177

-

2741

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for Superstructure including curing all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5

440

-

2865

... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of 75 mm

16

-

291

... More
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm.

443

-

206

... More
Supplying and laying quarry spalls properly graded but not more than 10 cm in size with spreading in required profile including all leads& lifts.

13

-

446

... More
Rip rap stone laying in requied profile properly hand packed using stone of specified size including all lead & lifts.

-

-

-

... More
23 cm thickness(+_5% thickness tolerance)

72

-

1009

... More
Earth work in rough (borrow Area) excavation for embankment in hard soil,morrum or highly weathered strata dry or moist,including laying in 20cm layers(before compation ) and breaking of clouds,sorting of grass pebbeles etc.and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for cornpaction and watering) including loading and unloading wherever required complete in all respect. Forming Embankment for casing Zone upto 5km lead

1440

-

115.2

... More
Compaction of earth or highly weathered strata. By manually or plain roller (density 90% of proctor's)

1440

-

19

... More
Watering of earth inciuding cost of carriage of water when sources of water is (b) upto 1 km

1440

-

7.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.