If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date3 Sep 2024
Closing Date14 Sep 2024
Tender Amount₹ 22,32,000 
Notes
Download

Costs

  • EMD

    ₹ 44,640
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm

39.79

202650

5093

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) including curing all leads of all construction materials including curing etc. complete in 1:5 cement mortar For Foundation

94.35

412969

4377

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.1:5 For Superstructure

112.86

517914

4589

... More
Plaster in cement sand mortar 1: 4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials complete ; of thickness 20 mm.

170.75

53615

314

... More
Providing and Laying Cement concrete coping in (1 : 2 : 4) with maximum size of crusher broken aggregate up to :20mm inluding shuttering etc. with all leads of materials complete in all respect of thickness of 75 mm .

26.15

12552

480

... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm

123.7

753456

6091

... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)

123.7

17318

140

... More
Drilling holes of 35 mm diameter for anchor rods. i) Upto 1.50 m. depth

33.75

4353

129

... More
Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete

75

18375

245

... More
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete.

106.52

7669

72

... More
Side shuttering etc complete Including propping Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.

256.26

56377

220

... More
Supply of M.S. Reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars(IS:1786-1985)

1128.68

100452

89

... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. Earth / Soil

241.08

21938

91



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.