Water Resources Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 2,22,740Document Cost
₹ 1,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WRDAS_295220_1Bid Award Id
ViewTender No
NIT04/2022-23_EE WRD Karauli_BATender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://water.rajasthan.gov.in/wrd
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
1274.2
-
220
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. (b) (ii)Tor or ribbed bars (IS :1786-1985)
17673
-
95
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (d) 20 mm.
270.82
-
5593
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (d) 20 mm.
543.3
-
6081
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface
283.5
-
1136
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm
31
-
480
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (b) 20 mm
82
-
310
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. (b) Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.
543.3
-
200
Extra lead over item no 1 to 8 of excavated material.Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km).
59823.4
-
8.75
(i) Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density.
8546.2
-
38
Watering of earth including cost of carriage of water when source of water is (a) up to 1 Km
8546.2
-
11.1
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
500.25
-
781
Drilling holes of 35 mm diameter for anchor rods.(i) Upto 1.50 m. depth
150
-
130
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts (a) 23 cm thickness ( 5 % thickness tolerance)
469.2
-
1604
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (b) In cement sand mortar 1:4
31
-
4378
Add extra over item no. 1 to 7 for (a) masonry work in superstructure
31
-
190
Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (a) Broken ballast 40 to 80 mm size
2.54
-
1029
Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (b) Broken ballast 20 to 40 mm size
2.54
-
1120
Supplying and laying sand of grade as per design requirement in required profile including all lead & lifts. This item is to be used only for laying filter / inverted filter
1.27
-
1668
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b) With lead beyond 250 m and up to 750 m (½ Km)
8546.2
-
133.5