Water Resources Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 4,81,000Document Cost
₹ 2,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WRDAS_308844_2Bid Award Id
ViewTender No
05/2022-23 PHLC ITender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Soft / disintegrated rock
7100
-
118
... More
Hard rock not requiring blasting.
4057
-
176
... More
Phylite & other hard rock requiring nominal blasting
2029
-
259
... More
Preparation of foundation of structure including removal of all loose stones, silt and final washing.
-
-
-
... More
By manual labour
718
-
23
... More
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm.
228
-
4425
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :
-
-
-
... More
Retaining wall, counterfort, abutment, wing walls up stream or downstream slope facings of dams and open faces of construction joints etc.
400
-
173
... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm.
532
-
4790
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for Superstructure including curing with all leads of all construction materials including curing etc. complete.
-
-
-
... More
In cement sand mortar 1:4
1093
-
3590
... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of:75mm
103
-
420
... More
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness:20mm
-
-
-
... More
20 mm.
965
-
254
... More
Earth work in rough (borrow area) excavation for embankments in hard soil,morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.
-
-
-
... More
With lead of 7 km
42047
-
199.7
... More
Compaction of earth or higly weathered strata.
By mechanical equipment such as sheep foot roller/ pneumatic tyredroller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 98% of Standard Proctor's density
42047
-
34
... More
Watering of earth including cost of carriage of water when source of water is
-
-
-
... More
up to 1 Km Compaction of earth or higly weathered strata.
42047
-
9.1
... More
Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and all complete in all respect.
3526
-
24
... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts.
1134
-
659
... More
Rip-rap stone laying in required profile properly hand packed using stone of specified size including all lead & lifts 23 cm. thickness (+ 5% thickness tolerance)
922
-
1334
... More
Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface.
216
-
886
... More
Supplying and laying aggregate in layers and profile as specified including all lead & lift (River gravel 20 -40 mm)
319
-
770
... More
Supplying and laying sand in layers and profile including all leads & lift.
500
-
1260
... More
Threading / turfing of grass on slopes of bunds etc. in rows 15 cm centre to centre in each direction including Ploughing, levelling, breaking of clods, and removal of stones etc. if required including maintenance for 30 days or more till the grass develops fully with all leads and lifts complete.
2325
-
69
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements