Water Resources Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 18,240Document Cost
₹ 1,000Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRDAS_445225_5Tender No
NIT 07/2024-25_MJSATender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://water.rajasthan.gov.in/wrd
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard / dense soil
45.69
93
4249.17
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect. Soft / Disintegrated rock
8
155
1240
... More
Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required.
44
8
374
... More
Extra lead over item no 1 to 8 of excavated material.Beyond initial lead of 50 m & upto 250m.
58.6
9
556.7
... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. Deduct in item no 16 (a) to (d) above if Standard Procter's density to be achieved is at lesast 95%
691.8
114
78865.2
... More
Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 95% of Standard Proctor's density.
691.8
38
26288.4
... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km for per cum
691.8
11
7678.98
... More
Extra charges for disposal of excavated/re-handled material in required profile laid in uniform layers and given side slopes well dressed having layer thickness
including loading and un-loading wherever required with cost of dewatering
wherever required complete in all respect.Not exceeding 15cm.
56
9
532
... More
Providing and laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction, and finishing with rendering in cement sand morter 1:3 (1 cement: 3 coarse sand) -and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(d) 20 mm
13.18
4925
64911.5
... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm
45.72
6020
275234.4
... More
Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20 mm (For mix design Cement content considered 420 kg/ cum of concrete)
13.5
6445
87007.5
... More
Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of dewatering wherever required.
141.9
20
2838
... More
Plaster in cement sand morter 1:4 including racking of joints ,smoothfinishing &curing etc. complete including all leads of all construction material of thickness 20mm
199.5
285
56857.5
... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate up to 20mm including shuttering etc. with all leads of material complete in all respect in thickness of 50mm
20.25
320
6480
... More
Drilling holes of 35 mm diameter for anchor rods. Up to 1.50 mtr. Depth
28
130
3640
... More
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete..
118.37
78
9232.86
... More
Side shuttering including propping etc. complete(to achieve finish F2 for: Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontaly laid mass concrere)
3.83
160
612.8
... More
Side shuttering including propping etc. complete(to achieve finish F2 for: Retaining wall, counterfort, abutment, wing walls up stream or down- stream
slope facings of dams and open faces of construction joints etc.
138
220
30360
... More
Labour charges including watering for puddle work to obtain minimum dry density as 90% of MDD
56
96
5376
... More
Random rubble stone masonary (using R.R. stone where 75% stones to be not less then 15cm in size in any direction and weighting not less then 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.. In cement sand mortar 1:6
22.14
3918
86744.52
... More
Random rubble stone masonary (using R.R. stone where 75% stones to be not less then 15cm in size in any direction and weighting not less then 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.. In cement sand mortar 1:6 Add extra over item no. 1 to 7 for Masonry work in superstructure
37.37
4108
153515.96