If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date3 Jun 2023
Closing Date12 Jun 2023
Tender Amount₹ 1,73,00,000 
Notes
Download

Costs

  • EMD

    ₹ 3,46,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BSR 2022, ch no. 17, Item no. 9b page 90

-

-

-

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing,ompaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm

303.66

1486719

4896

... More
BSR 2022, ch. no. 9, Item no. 8c,page- 28

-

-

-

... More
Random rubble stone masonry (using R. R. stones where 75 % stonesto be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete In Cement sand mortar 1:6

2188.68

8581814

3921

... More
BSR 2022, ch. no. 7, Item no. 1d,page-21

-

-

-

... More
Add extra over Masonry work in superstructure

2188.68

415849

190

... More
Page 21&22 Chapter no - VII tem no.8(a)

-

-

-

... More
Providing and laying cement concrete coping in (1:2:4) with max size of crusher broken aggregate upto 20 mm. including shutterring etc. with all leads of material complets in all respect in thickness of 50 mm.

2436.3

1169424

480

... More
BSR 2022, ch. no. 18, Item no. 17 a page-92

-

-

-

... More
Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm

4190.61

1211086

289

... More
BSR 2022, ch. no. 8, Item no. 2a page-24

-

-

-

... More
Cement concrete lining of mix (1:3:6) M-10 with upto 20 mm size well graded crusher broken stone aggregate laid as per specifications including all leads of all construction materials including rendering and curing etc. complete for canal bed of thickness 7.5 cm.

1506.4

686918

456

... More
BSR 2022, ch. no. 9, Item no. 16b page-30

-

-

-

... More
Add Extra Over Items Of Cement plaster/ Cement concrete/ CC lining/CC Flooring Or RCC For Providing and Mixing Polypropylene Fibres as per IS 16448:2016 or Latest Revision , 6/12 mm Long @ 0.25 % (125 gram per 50 kg of Cement) or In Ratio Of as Specified

632

37920

60

... More
Page 92 Chapter no - 18 Item no. 20

-

-

-

... More
Providing Casting machining and assembling of Head stocks assembly with handle complete for operating Tank, canal, barrage, stop dam gates, as per drawing with testing, including cost of all materials as head stock body, GM Nut, Warm wheel, Gear, Bush, Pin, operating handle etc. with machinery, labour, cutting, aligning, welding, finishing, cleaning, painting etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding transportation charges for structural steel components and other materials. (C) Head Stock screw jack type 50mm dia. threaded Nut (Model M-75), 0.750 tonne capacity, approx-45 kg wei

138.44

27826

201

... More
Rate as per BSR 2022 CH-XII item 22©

-

-

-

... More
Providing, fabrication, threading (Square and V threading as required), machining, straightening of MS Round bar complete as per drawing with testing, including cost of all materials, with machinery, labour, cutting, aligning, welding, finishing, cleaning etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding transportation charges for structural steel components and other materials. (d)Rate for double start square threading for 56mm dia. round bar with materials

354.44

59191

167

... More
Rate as per BSR 2022 CH-XII item 24 €

-

-

-

... More
Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.(a)Rate of work without materials

369.2

46519

126

... More
Rate as per BSR 2022 CH-XII item 25(A)

-

-

-

... More
supplying of M.S reinforcement including labourcharges for bending and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using (II )Tor ot ribbed bars (is 432-1982)

-

-

-

... More
Rate as per BSR 2022 CH-X item 9(b)ii

2440.11

231810

95

... More
Providing and Laying in position of cement concrete Nominal mix (1:2:4)including leads of all construction material s,curing,compaction and finishing with rendering in cement sand mortar 1:3 (1 cement :3 course sand )and making good the joints excluding the cost of centering ,shuttering and reinforcement ,well graded crusher broken stone aggregate of maximum size up to 20 mm

-

-

-

... More
Rate as per BSR 2022 CH-IX item 7(d)

12

66936

5578

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b)Hard / dense soil

-

-

-

... More
Rate as per BSR 2022 Ch.V item No.1b

121.85

11332

93

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm

-

-

-

... More
Rate as per BSR 2022 Ch.IX item 8(d)

15.22

75765

4978

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.(c)In cement sand mortar 1:5

-

-

-

... More
Rate as per BSR 2022 ChVII item 1c

92.52

377204

4077

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for Superstructure including curing with all leads of all construction materials including curing etc. complete.(c)In cement sand mortar 1:5

-

-

-

... More
Rate as per BSR 2022 ChVII item 1c,8a

84.67

361286

4267

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :(b)Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc.

-

-

-

... More
Rate as per BSR 2022 ChX item 1b

47.6

8806

185

... More
Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove

-

-

-

... More
Rate as per BSR 2022 ChX item 2

46.5

10462

225

... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;

-

-

-

... More
Rate as per BSR 2022 Ch IX item 6d

49.46

299925

6064

... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.(b)Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.

-

-

-

... More
Rate as per BSR 2022 ChX item 10b

49.46

9892

200

... More
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including dewatering, laying in layers of 20cm (before compaction ) and breaking of clods, sorting of grass, pebbles etc and dressing when compacted by vibro compactor, vibro sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (excluding charges for compaction) including loading and un-loading wherever required complete in all respect.(b) With lead beyond 750m (1/2km) and upto 1km

-

-

-

... More
Rate as per BSR 2022 CH-V item 16 (b)

6384.38

791663

124

... More
Supplying stone and Laying of Rip-rap in required profile properly hand packed using stone of specified size including all lead and lifts. 30 cm thickness (+ 5% thickness tolerance)

-

-

-

... More
Rate as per BSR 2022 CH-V item 35 (B)

502.5

820582

1633

... More
Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads and lifts

-

-

-

... More
Rate as per BSR 2022 CH-V item 33

167.5

126797

757

... More
Compaction of earth or hilly weathered strata. (b)ii By mechanical equipment such as sheep foot roller/pneumatic tyred roller/ vibro compactor required as per site condition to obtain dry density of at least 98% of Standard Proctor's density.

-

-

-

... More
Rate as per BSR 2022 CH-V item 18 (b) (ii)

6384.38

261759

41

... More
Watering of earth including cost of carriage of water when source of water is upto 1km.

-

-

-

... More
Rate as per BSR 2022 CH-V item 28 (a)

6384.38

70866

11.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.