Water Resources Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Nov 2022
Closing Date15 Dec 2022
Tender Amount₹ 6,01,45,000 
Notes
Download

Costs

  • EMD

    ₹ 12,02,900
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. a Soft / Disintegrated rock

4041.56

-

155

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock not requiring blasting

1761.67

-

229

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Phylite and other hard rock requiring nominal blasting

65

-

321

... More
Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal and dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : (a) Phylite and other hard rock requiring nominal blasting

1955.78

-

517

... More
xcavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal and dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including dewatering, disposal of excavated material in the designated spoil bank/ embankment and dressing of excavated material with all leads and lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure and royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate.

1722.7

-

620

... More
Extra lead over item no 5.1 to 5.8 of excavated material. a. Beyond initial lead of 50 m and upto 250m

9909

-

9.5

... More
Extra lead over item no 1 to 8 of excavated material. b. Add extra over item 10 (a) for lead beyond 250m and upto 750m (for average 1/2Km).

5907

-

8.75

... More
Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect Mixed strata muck

4922

-

108

... More
Drilling holes of 35 mm diameter for anchor rods. i) Upto 1.50 m. depth

1008

-

130

... More
Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete

396

-

219

... More
Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete

4874.8

-

78

... More
Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour

2615

-

23

... More
Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of dewatering wherever required. In cement mortar

75

-

487.6

... More
Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 320 kg/ cum of concrete) 40 mm

1849

-

5637

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. (non - suspended horizontally laid mass concrete)

4168

-

160

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.

1754

-

220

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Curved edges or sides of special shapes like baffle or chute blocks, end sills, Basin Block, projected copings, extended sills, curved surfaces arches, circular ducts etc.

554

-

340

... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using Tor or ribbed bars (IS :1786-1985)

62983

-

95

... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)

536

-

140

... More
Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; - 20 mm

1194

-

6437

... More
Add extra over item No. 1 to 7 Add Extra for RCC work for Retaining wall, wing wall, returns, divide wall, Pier,

292.14

-

190

... More
Add extra over item No. 1 to 7 Add Extra for RCC work for tunneling, chute block, basin block, end sill, dented end sill etc

131.64

-

260

... More
Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; - 40 mm

536

-

6237

... More
Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;- 20 mm

1100

-

6701

... More
Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface. PCC Nominal Mix 1:2:4 with plum, Max size of Aggregate 40 mm,

2882.4

-

5110

... More
Supply and fixing 6 mm thick PVC water seal of approved quality in construction/contraction joint as per drawing complete in all respect 305 mm wide

128

-

800

... More
Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type Dam Shutter gates interchangeable consisting of sealing frame (embedded parts), skin plate of shutters, stiffeners, horizontal and vertical girders, guide, stainless steel flat, lifting hooks, clits fasteners etc., with all accessories including frame and gate complete set for Barrage/ Stop dam/ waste weir / spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, tools and tackles, seal fixing, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, including primer coating, should not be less than 350 microns., etc. complete as per specifications and approved drawings, including packing and forwarding, transportation charges for structural steel components and other materials

6.72

-

174810

... More
Add extra over item No. 5.1 to 5.8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required

89941

-

8.5

... More
Add extra over item No.10. 1 c ,10. 1d,10. 2 and 10.3 for centering and shutterring for each additional 1 m height or part thereof above initial height of 3.0m from base/floor level.

554

-

25

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. a Soft / Disintegrated rock 5.12 Add extra over item No. 5.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.

1010.44

-

193.75

... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock not requiring blasting 5.12 Add extra over item No. 5.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.

764.33

-

286.25

... More
Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal and dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : (a) Phylite and other hard rock requiring nominal blasting 5.12 Add extra over item No. 5.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.

505.22

-

646.25

... More
xcavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal and dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including dewatering, disposal of excavated material in the designated spoil bank/ embankment and dressing of excavated material with all leads and lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure and royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. 5.12 Add extra over item No. 5.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered.

738.3

-

775



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.