Water Resources Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 8,32,466Document Cost
₹ 7,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WRDAS_342118_1Bid Award Id
ViewTender No
SE 01/2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://water.rajasthan.gov.in/wrd
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard / dense soil
300.67
27962
93
... More
Hard soil mixed with Kankar / boulders, Morrum
8276.68
951818
115
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
-
-
-
... More
Soft / Disintegrated rock
2203.11
341482
155
... More
Harf rock not requiring Blasting
1655
378995
229
... More
Phylite and other hard rock requiring nominal blasting
1241.5
398521
321
... More
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted to obtain dry density of at least 98% of Standard Proctor's density with initial lead of 250 m and lift up to 1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.
-
-
-
... More
with initial lead of 250 mtrs
1605.83
199122
124
... More
With lead beyound 250m and upto 750m (for average ½ km)
802.91
107188
133.5
... More
Preparation of foundation of structure including removal of all loose stones, silt and final washing.
-
-
-
... More
By manual labour
6150
141450
23
... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
-
-
-
... More
upto 40 mm
569
2732338
4802
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.In cement sand mortar 1:6
64.5
307665
4770
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.In cement sand mortar 1:6
169.25
639257
3777
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.In cement sand mortar 1:6
831
3296577
3967
... More
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction
materials of thickness: 20mm
1380
420900
305
... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm
990
475200
480
... More
Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 420 kg/ cum of concrete)
219.35
1388704
6331
... More
Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (For mix design Cement content considered 400 kg/ cum of concrete) 20 mm
1858
11272486
6067
... More
Centering and shuttering for slabes, beams, lintles,coloumns, trough with or without caps and base including propping and remove.
17806.77
4006523
225
... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
-
-
-
... More
Tor or ribbed bars (IS :1786-1985)
138484
13155980
95
... More
Providing, laying and fixing in postion RCC. Spun or hume pipe with collers (IS:458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with which grout of cement mortar 1:3 perfectly air tight including testing of joints.
-
-
-
... More
150 mm dia NP-3
22.5
10462
465
... More
300 mm dia NP-3
7.5
7942
1059
... More
600mm dia NP-3
7.5
23235
3098
... More
1000 mm dia NP-3
50
360850
7217
... More
Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type gate with frame consisting of skin plate, sealing frame, stiffeners, horizontal and vertical girders, guide, stainless steel flat/Brass flat, rivets, wedges, lifting rods etc., with all accessories as per relevant IS code including frame & gate complete set for Canal Cross, Escape, Head regulator /Tank head regulator including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, seal fixing, tools and tackles etc., applying two coat of zinc rich epoxy primer to give dry film thickness of 70±5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150±5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.
2.5
437200
174880
... More
Filling of construction joints with Bitumen based sealing compound lining in the grove as per IS made by cutter upto the 1/3 depth of concrete lining as per specification provided in IS: 3384-1986 and all leads of all construction materials including cost of sealing compound, complete in all respect.
3157.5
268387
85
... More
Providing bitumen joints filter sheet conforming to IS: 1838-1983 20 mm
6.9
5382
780
... More
Providing & fixing unplast sized polyvinyal chloride (UPVC) SWR pippe type B forsciland based discharge system (IS:13592 ,1992 Marked ) of approved quality / make Coupler (i) 75 mm dia. (upto 1 m length)
40
2880
72
... More
Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required.
470.7
35773
76
... More
Watering of earth including cost of carriage of water when source of water is up to 1 km
1605.83
17824
11.1
... More
Compaction of earth or highly weathered strata a) By manually or plain roller. (density 90% of Proctor)
1605.83
38539
24