Sri Karan Narendra Agriculture University Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 1,50,000Document Cost
₹ 1,000Tender Fee
₹ 1,000
Summary
E-tender For Supply And Installation Of Network Equipment At Sknau Campus, Jobner (rajasthan).
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SKNAU_302186_1Bid Award Id
ViewTender No
ETENDER/NAHEP/SKNAU/2022-23/16Tender Authority
Sri Karan Narendra Agriculture University ViewPurchaser Address
-Website
http://http://sknau.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Network Access Gateway
1
-
-
Digital subscriber line access multiplexer
1
-
-
Access Points indoor
10
-
-
Access Points
25
-
-
Access Points Outdoor
2
-
-
SFP Trans receiver
74
-
-
LIU 48 port (Loaded)
1
-
-
LIU 24 port (Loaded)
1
-
-
LIU 12 port (Loaded)
35
-
-
SC LC Patch Cords
74
-
-
CAT 6 cable
6100
-
-
I/o points
250
-
-
Wall Network Rack 12U
35
-
-
OFC cable 48 core armoured
2500
-
-
OFC cable 12 core armoured
3500
-
-
Fiber cable Laying campus wide
6000
-
-
Consumables items,& Electrical Work etc
• Supply and installation of 1 MM ISI marked Wire.
• Supply and Installation of 3 Socket 6 AMP electricity Board.
• Electrical Panel Integration with electricity board.
• Testing of electricity circuit up to each component at rack location.
• Testing of Volt leakage and power leakage at each rack location.
• Integration of existing power backup with Electrical panal power supply. • Integration of power backup with Electrical panal power supply.
• Electrical Earthing testing.
1
-
-
Cabling Work 1. Floor & Wall Furnishing After cabling with cement And Suitable Material (Under finishing works) like The Cabling must include 1 inch PVC pipe, with PVC clamps and PVC flexible pipe
2. Supply and installations of required RJ45 connectors. With all required terminations at site.
3. IT includes all testing of terminated cables.
4. Installation of SC connectors and SM pigtails and Fixing of all LIUs into racks.
5. Splicing and terminations of required OFC segments cores into LIUs by identifying each core and respective connectivity. Management of OFC cables near Racks. 6. Mounting Racks at proper height, it includes all consumables required to install and run the rack.
7. Tagging of CAT6 and OFC by identifying each segment.
8. Mounting switches into racks and installation for each location.
9. Ground survey for Digging at site.
10. Depth and terrain analysis of site.
11. Path marking for Cable Laying at site.
12. Digging/ Drilling the Pilot bore.
13. Installation of HDPE Duct pipe..
14. Cementing of open heads at peer locations.
15. Clamping the pipes in open area with wall/surrounding structure. 16. Drilling and filling holes in walls and civil structures.
17. Complete Project documentation after completion of Project.
1
-
-
HDPE Duct
4000
-
-
Inverter UPS
15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements