If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Rajasthan State Sports Council - RSSC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 May 2022
Closing Date16 May 2022
Tender Amount₹ 6,44,082 
Notes
Download

Costs

  • EMD

    ₹ 12,882
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth, Sand, Lime, Morrum manure or sludge Lead 10 Km

200.93

-

124

... More
Providing, laying, spreading and compacting stone aggregate for Wet Mix Macadam (as per table 400-10 and 400-11) specification including premixing the material with water to OMC in wet mix plant as per approved design mix, carriage of mixed material by Tipper to site, laying in uniform layers with motor grader/Front end Loader/paver finisher, in sub base/ base course on a well prepared under base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc. (MoRTH specification : Clause 406) by mechanical means with lead up to 30 Km.

100.47

-

1571

... More
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed within a lead of 50 meter. All kinds of soil.

30.88

-

162

... More
Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level. 1:4:8 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size

4.12

-

3002

... More
Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks Cement mortar 1 : 6 (1 cement : 6 coarse sand)

22.65

-

3875

... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm thick nominal size aggregate.

30.2

-

252

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick.

54.9

-

158

... More
The base bricks act as a stabilizing agent for the tennis courts. Typically base bricks are comprised of small bricks pieces sizes. The base bricks should a thickness of 3”-4". The base bricks function is to keep the court from moving or sinking over its normal life. Because of this, the brick should be compactable in nature and stable in its ability to lock up within itself.

66.98

-

1186

... More
The bricks screening perform a very important function. They provide the surface material with a water reservoir for the purposes of keeping the surface material moist. The screening layer also provides the contractor a means to achieve an almost perfectly graded and level base. It is important that the screening material holds moisture and that it also maintains compaction. For clay courts beach sand or crushed shell are not recommended. Morrum is perfect screening material, but there are other materials will also work. The screening layer should be no less than 2”to3”.

50.23

-

1850

... More
The Clay (Fast Dry) material is the finished product and needs to be placed with the utmost care and professionalism. This material provides a smooth and comfortable playing surface for tennis players. It is very important that this material be placed a very consistent depth in its installation and that the material is kept dry during storage and installation.

33.49

-

2253

... More
Proviiding and Fixing of socket type adjustableTennis Poles and Net as per ITF games standard

1

-

34000

... More
Court marking as per standred practice and approved by Engineer in charge .

651.48

-

5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.