Rajasthan State Mines And Minerals Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Rajasthan State Mines And Minerals Limited - RSMML Tender

Works
Eprocure
Opening Date11 Dec 2020
Closing Date5 Jan 2021
Tender Amount₹ 13,95,265 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 16,260
  • Document Cost

    ₹ 1,180
  • Tender Fee

    ₹ 500

Summary

Roofwater Proffing Work At Corporate Office Building Of Rsmml Udaipur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centring and Shuttering with steel plates sheets including shuttering, proping, bracing both ways with wooden members and removal of form work upto floor three level for : Columns, pillars, posts and struts etc. ( B-17/ 4.7.3)

36

-

274

... More
Grading for roof water proofing treatment with cement concrete 1:2:4 ( 1 cement : 2 Coarse sand :4 graded stone aggregate 20 mm nominal size ) with water proofing compound as per manufacturers specification ( B-147/ 15.17.2 )

23

-

4022

... More
finishing with 25 mm thick cement plaster on roofs in cement sand mortar 1:4 mix including water proofing compound @ 2% of cement used, with neat cement finished curing etc completein all respect including making of 300mm X 300mm square ( B-93/ 10.21)

1500

-

212

... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground with in 50 mtrs. Lead ( B-143/ 14.54 + B-144/14.62.2) add extra for all type of dismantling work for each subsequent storey or height more than 4.5 mtr rate in sq m.

2200

-

9.6

... More
Plaster on new surface on walis in cement sand mortar 1:6 including racking of joints etc. complete fine finish : 25 mm thick ( B-119/ 12.9.1)

700

-

162

... More
Finishing with neat cement (punning ) ( B-119/12.15 )

700

-

28

... More
P & F plain fiber glass sheet ( FRP sheet fiber reinforcement product sheet confirming to IS: 12866-1989 having minimum thickness as below including fixing with nuts, bolts, hooks, and bitumen washer etc complete : 5 mm thick ( weight 8.4 Kg / Sq.M. ) ( B-98/ 10.50.4)

150

-

2089

... More
Providing and laying Damp proof course with cement concrete grade M-150 ( 1:2:4) mortar prepared with 1% solution of water proof compound , including 2 coats of hot blown bitumen ( 2 kg/sqm) complete as per specification with glass strip 3 mm thick at a distance of 1 metre interval : 50 mm thick (B-145/ 15.2.2±15.7±15.8)

20

-

208

... More
Providing and laying water proofing treatment of roofs of slabs by applying acrylic based polymer modified cementous slurry (i)after surface preparation first layer of slurry of cement @0.448 kg/sqm mixed with polymer @0.253 kg/sqm (ii) laying second layer of Fiber glass cloth when the first layer is steel green .Overlaps of joints of fiber cloth should not be less than 10cm. (iii) Third layer of 1.5 mm thickness consisting of slurry cement@ 1.289 kg/sqm mixed with polymer @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm . This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around. (iv) Fourth and final layer of brick tiling with cement mortar or any other approved protective course( which will be paid for seperately). For the purpose of measurement the entire treated surface will be measured.(B-157/15.55)

2060

-

290

... More
Miscellaneous work @4.5%

1

-

69269



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.