Rajasthan State Hotels Corporation Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Rajasthan State Hotels Corporation Limited Tender

Goods
Eprocure
Opening Date4 May 2018
Closing Date18 May 2018
Tender Amount₹ 6,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
From 3.0 to 4.50M

15.26

7111

466

... More
From 4.5 to 6.0M

15.26

7706

505

... More
From 6.0 to 7.5M

15.26

8286

543

... More
From 7.5 to 9.0M

15.26

8881

582

... More
From 9.0 to 10.5M

15.26

9461

620

... More
From 10.5 to 12.0M

15.26

10056

659

... More
From 12.0 to 13.5M

15.26

10636

697

... More
From 13.5to 15.0 M

15.26

11231

736

... More
From 15.0 to 16.5M

15.26

11811

774

... More
From 16.5 to 18m

15.26

12406

813

... More
From 18.0to 19.5M

15.26

12986

851

... More
From 19.5 to 21.0 m

15.26

13581

890

... More
From 21.0 to 22.5 m

15.26

14161

928

... More
From 22.5 to 24.0 m

15.26

14756

967

... More
From 24.0 to 25.0 m

11.1

11155

1005

... More
B-3/1.11 Add Extra over item for excavation in saturated soil where pumping or bailing out of water is required, including shorting strutting where required and dewatering

87.96

6860

78

... More
B-18/4.2.3 Reinforced cement concrete work in Wall (any thickness) including attached pilasters, Buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc up to floor three level Including curing compaction finishing with rendering in cement sand mortar 1-3 ( 1 Cement : 3 course sand) and making good the joints excluding cost of centering and shuttering and reinforcement, M-15 grade mix 1:2:4 ( 1cemnt : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)

29.69

109199

3678

... More
B-20/4.12.1 Centering & shuttering with plywood or steel sheets including strutting propping, bracing, both way with wooden member and removal of form work for superstructure up to 4.5m height above plinth level for walls (any thickness) including attached pilasters,Buttresses, plinth and string course.

440

93720

213

... More
Centering & shuttering with plywood or steel sheets including strutting propping, bracing, both way with wooden member and removal of form work for superstructure up to 4.5m height above plinth for add extra over time no 8.10 for centering & shuttering for constt. of valve of open well in circular work.

440

13200

30

... More
B-22/4.13.2 Providing & fabrication, steel reinforcement for RCC work including cutting, bending, placing in position ans binding complete including cost of binding wire in foundation raft footing step beam base of column etc. up to plinth level. Cold twisted deformed (IS: 1786) bars.

900

62100

69

... More
B-18/4.2.3 Structural Steel work welded in built up sections, trusses and frame work including cutting, hoisting, fixing in position and applying a priming cost of approved steel primer up to 4.5 mtr. Height above level, in tees, angles, flats and channels.

500

34000

68

... More
Construction of bore well by DTH drilling by combination drilling machine up to upto 300 meter and above above in all types of rocks for tapping water aquifer in hard formation (Non collapsible) to accommodate casing pipe of 250/ 200 mm for encasing over burden to eliminate the risk of "caving in" including cinserting of casing pipes 0.5 to 1.0 meter deep in hard rock beyond over burden as specified in code of practice for construction and testing of tubewells (IS:2800 Part 1): 1991 and (IS:2800 Part II): 1979 (both amended upto date). The work will not include cost of casing pipe and shall be deemed completed only after obtaining sand free water during pumping. The bore well should have a throughout bore size beyond casing pipe 200mmØ

100

105000

1050

... More
Providing and fixing ERW MS Black casing pipe for following dia. Nominal bore hole ISI Marked (IS: 2470- 2001 amemended up to date), medium class at site of work 200mmØ

6

10800

1800

... More
Drilling the horizontal bore holes in the various open well below water table in all type of strata / rock the bore size will be minimum of 65mm dia. This including where over necessary & bailing out of water dragging & pumping, dirty water disposal of silt up to top of well inspection of total depth of dia of well complete in all repeat size 65mm dia

60

23760

396



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.