If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Rajasthan Rajya Vidyut Prasaran Nigam Limited - RVPN Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date12 Sep 2024
Closing Date29 Oct 2024
Tender Amount₹ 2,97,35,278 
Notes
Download

Costs

  • EMD

    ₹ 5,94,710
  • Document Cost

    ₹ 5,900
  • Tender Fee

    ₹ 2,360

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation, excluding back filling, including shoring, shuttering, dewatering, etc. upto the required depth as per foundation specification/drawings. (ii) Hard rock (with blasting)

1000

1269000

1269

... More
Setting of template & stub/ anchor bolt & removal after concreting, excluding cost of excavation and concreting but including back filling with excavated/ borrowed earth (with lead & lift) in layers with ramming andwatering as per specification. (i) Towers including extension upto 9 Meters .

20

346540

17327

... More
CONCRETING: Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. (ii) 1:3:6 Mix

150

1278750

8525

... More
CONCRETING: Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. (iv) 1:1.5:3 Mix

650

6964750

10715

... More
Steel Reinforcement Cutting, bending, welding of joints if required, fixing and placing of steel reinforcement as per specification and drawings including material.

50

3074800

61496

... More
(A) Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats &connectors, but including coke/charcoal etc., excavation,augering and backfilling in all types of soil.

36

56448

1568

... More
(B) Earthing of towers legs with counterpoise type earthings excluding supply of materials but including excavation and backfilling in all types of soil. (i)each set by laying 4 wires each 15m long at a depth of 600mm

70

137200

1960

... More
ERECTION OF TOWERS: Erection of super structures including D-shackles,ACD, Hangers, U-Bolts, step bolts, danger plate, phase plate, number plate etc. Also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of Zinc Rich paint i) Erection of towers(with extensions up to 9 Meters)

300

1462800

4876

... More
CONDUCTOR STRINGING (A) Stringing of ACSR Panther including hoisting of insulator string, laying, jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route KM of the line (i) Single conductor

135

1299240

9624

... More
EARTHWIRE STRINGING (A) Stringing of galvanised steel stranded wire including laying, jointing & tensioning, clamping,clipping and fixing vibration damper and earth bond etc (i) One No. 7/3.15mm galvanised wire

45

302085

6713

... More
DISMANTLING OF TOWERS: Dismantling of super structures alongwith extensions, having tack welded Bolts & Nuts, including removing ofD shackles, hangers, U-Bolts, step bolts, ACD, Danger plate, number plate, Phase plate of tower including transportation from site to our store and stacking of all material (A) 132 KV and 220KV S/C & D/C Towers (all types)

400

2338400

5846

... More
DE STRINGING OF CONDUCTOR! EARTH WIRE. (A) Destringing upto ACSR panther conductor: Dismantling of vibration dampers and armour rods, removal of conductor from clamps and fitting in rollers, detensioning, dehoisting of insulator string as required and collecting the material & depositing the same in our store and stacking i) single conductor

135

1429650

10590

... More
DE STRINGING OF CONDUCTOR! EARTH WIRE. (C) Destringing of Earth wire: Dismantling of earth bonds, vibration dampers, declipping & fitting in rollers, detensioning and collecting the material & depositing the same in our store and stacking (i) One No. 7/3.15mm galvanised wire

45

331830

7374

... More
RIVETMENT OF TOWERS (A) Providing and laying cement concrete including curing, compaction etc. complete using stone aggregate 40 mm nominal size (crusher broken) in foundation plinth, using 1Cement: 5 Sand:. 10 aggregate mix.

100

226300

2263

... More
RIVETMENT OF TOWERS (B ) Random rubble stone masonary for rivetment in 1:5 cement sand mortar including providing and fixing 100mmdia PCC drain pipe & raised and cut-pointing on stone masonary in 1:3 cement sand mortar excluding excavation but including Back filling inside rivetment using excavated/ borrowed earth (with all lead & lift) in layers not exceeding 20cm in depth & consolidating each deposited layer by ramming and watering

900

1950300

2167

... More
RIVETMENT OF TOWERS (D)Cement concrete coping grade 1:2:4(1cement:2coarse sand :4 graded, stone aggregate) rounding off edges etc. but excluding the cost of nosing of steps etc. complete for 75mm thick with 20mm thick nominal size aggregate

100

34800

348



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.