Rajasthan Rajya Vidyut Prasaran Nigam Limited Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 23,300Document Cost
₹ 1,180Tender Fee
₹ 590
Summary
Civil Work 132kv Gss Main Bus-ii With Bus Sectionalize At 220 Kv Gss Nagaur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RRVPN_416561_3Bid Award Id
ViewTender No
NIT-06/2024-25 SE (Civil) RRVPNL AjmerTender Authority
Rajasthan Rajya Vidyut Prasaran Nigam Limited ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. Upto plinth level.
176
27632
157
... More
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)
711
54747
77
... More
P&F rigid PVC Pipe (IS:4985 mark) class II/ (4 Kg. /Cm2.) approved quality /make including joining the pipe with solvent cement rubber ring and lubricant.110 mm dia
48
13536
282
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 (1 Cement :6 sand)
14
39732
2838
... More
Wall up to 30 Cm. and less thickness.
7
1302
186
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete:
165
13365
81
... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20 mm thick
160
30400
190
... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm thick nominal size aggregate.
22
6094
277
... More
Stone Aggregate Single size :40 mm nominal size Lead upto 20 KM Building Rubbish stone metal ( Grit and Ballast etc)
135
166050
1230
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). B-3.1.5
135
503685
3731
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements