If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 2,79,610Document Cost
₹ 5,900Tender Fee
₹ 2,360
Summary
Construction Of Lilo Of 132 Kv S/c Maniya-marena Line Upto 132 Kv Gss, Ambika
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RRVPN_363120_1Bid Award Id
ViewTender No
SE/TNC/HINDAUN/14/2023-24Tender Authority
Rajasthan Rajya Vidyut Prasaran Nigam Limited ViewPurchaser Address
-Website
http://https://energy.rajasthan.gov.in/rvpnl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Rechecking of the line route as per approved profile, tower centre marking, pit marking, bisection of angle tower as per required at site.
10
32550
3255
... More
Excavation
-
-
-
... More
Excavation, excluding back filling, including shoring, shutering, dewatering etc. upto the required depth as per foundation speciafication / drawings. i) Any soil, soft rock other than hard rock
3100
1215200
392
... More
Excavation, excluding back filling, including shoring, shutering, dewatering etc. upto the required depth as per foundation speciafication / drawings. i) Hard rock (with blasting subject topermission or without blasting)
200
253800
1269
... More
SETTING OF TEMPLATE & STUB / ANCHOR BOLT:-
-
-
-
... More
Setting of template & stub/ anchor bolt & removal after concreting, excluding cost of excavation and concreting but including back filling with excavated/ borrowed earth (with lead & lift) in layers with ramming andwatering as per specification. i) Towers including extensionupto 9 mtrs.
12
207924
17327
... More
Concreting
-
-
-
... More
Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. i) 1:1.5:3 Mix
290
3107350
10715
... More
Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. i) 1:2:4 Mix
75
658800
8784
... More
Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size, water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. i) 1:3:6 Mix
70
596750
8525
... More
Steel reinforcement
-
-
-
... More
Cutting ,Bending , Welding of joint if required , fixing and placing of steel reinforcement as per specification and drawing s including material.
32
1967872
61496
... More
Earthing
-
-
-
... More
Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats & connectors, but including coke / charcoal, etc., excavation, augering and backfilling in all types of soil.
35
54880
1568
... More
Erection of Tower
-
-
-
... More
Erection of super structures including D-shakles, ACD, Hangers, U Bolts, Step bolts, danger plates, phase plate, number plate etc. Also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of Zinc Rinch Paint. i) Erection of towers (with extensions upto 9 meters
190
926440
4876
... More
Conductor Stringing
-
-
-
... More
Stringing of ACSR Panther including hoisting of insulator string, laying, jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route KM of the line. i) Single conductor
60
577440
9624
... More
RIVETMENT OF TOWERS:-
-
-
-
... More
Providing & laying cement concrete including curing compaction etc. complete using stone aggregate 40 mm nominal size (Crusher broken) in foundation plinth using 1 cement : 5 sand : 10 Aggregate mix
60
135780
2263
... More
Random rubble stone massonary for rivetment in 1:5 cement sand mortat including providing and fixing 100 mm dia PCC drain pipe and raised and cut pointing on stone masonary in 1:3 cement sand mortar excluding excavation but including Back filling inside rivetment using excavated/ borrowed earth (with all lead & lift) in layers not exceeding 20cm in depth & consolidating each depositing layer by ramming and watering.
400
866800
2167
... More
Random rubble dry stone pitching including preparing surface etc. complete with raised & cut pointing in cement sand mortar 1:3 curing etc.
165
128700
780
... More
Cement concrete coping grade 1:2:4 (1 Cement:2 Coarse sand:4 Graded stone aggregate) rounding off edges etc. but excluding the cost of nosing of step etc. complete for 75mm thik with 20mm thik nominal sige aggregate
108
37584
348
... More
Installation of OPGW work
-
-
-
... More
INSTALLATION OF 48F OPGW FIBRE OPTIC CABLE
10
614410
61441
... More
INSTALLATION OF HARDWARE SET FOR 48F OPGW FIBER OPTIC CABLE
10
12290
1229
... More
INSTALLATION OF JOINT BOX (48 F)
8
117968
14746
... More
RE-INSTALLATION OF 24 FIBER OPGW FIBRE OPTIC CABLE
2
122882
61441
... More
RE-INSTALLATION OF HARDWARE SET FOR 24 FIBER OPTIC CABLE
2
2458
1229
... More
RE-INSTALLATION OF JOINT BOX (24 FIBER)
2
29492
14746
... More
DISMANTLING OF 24 FIBER OPGW FIBRE OPTIC CABLE
2
73729
36864.6
... More
DISMANTLING OF HARDWARE SET FOR 24 FIBER OPTIC CABLE
2
1474
737.4
... More
DISMANTLING OF JOINT BOX (24 FIBER)
2
17695
8847.6