Public Works Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 31,140Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEPWD_467605_1Bid Award Id
ViewTender No
NIT NO 04 of 2025-26 EE PWD E-I JaipurTender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwd.rajasthan.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
All in all comprehensive maintenance of various type airconditioners After Defect Laibility Period of Equipment including repair / replacement of compressor, condensing/ cooling coil , refrigerant piping , fan motor , remote , charging of refrigerant when ever required and periodical servicing as per OEM's recommendations to meet out the efficient performance of the equipment. 1.5/1.8/2.0 Tr Split type air conditioner
196
3800
744800
... More
NOTE 1:- Add @ 15 % in above rates for AMC of Split A.C.'s with Invertor Technology/ Hot & cold technology . 1.5/2.0/3.0/4.0 Tr Cassette type Split type air conditioner
14
7590
106260
... More
NOTE 1:- Add @ 15 % in above for AMC of Split A.C.'s with Invertor Technology / Hot & cold technology. 2.2/3.0/3.6/4.2 Tr Floor Standing Tower Type Split A.C.
8
10630
85040
... More
All in all General servicing and cleaning of various type of Water cooler During Defect Laibility Period of Equipment including compressor, condensing/ cooling coil ,water tank with inner piping including charging of refrigerants when ever required , cleaning , servicing etc as per OEM's recommendations to meet out the efficient performance of the equipment. Up to 60/120 Ltr capacity
10
1520
15200
... More
All in all comprehensive maintenance of Water cooler after Defect Laibility Period of Equipment including compressor, condensing/ cooling coil ,water tank with inner piping including repair / replacement of components , charging of refrigerants when ever required , cleaning , servicing etc as per OEM's recommendations to meet out the efficient performance of the equipment. Up to 60/120 Ltr capacity
15
3040
45600
... More
All in all comprehensive maintenance of Water cooler after Defect Laibility Period of Equipment including compressor, condensing/ cooling coil ,water tank with inner piping including repair / replacement of components , charging of refrigerants when ever required , cleaning , servicing etc as per OEM's recommendations to meet out the efficient performance of the equipment. 150/150 Ltr capacity
10
4175
41750
... More
All in all comprehensive maintenance of Reverse Osmosis water purification system including repair / replacement of components ,consumables , cleaning , servicing etc as per OEM's Guide lines to meet out the TDS level of Water as per client requirement / standard norms after defect laibility period of the equipment. 12-15 Ltr/hr capacity
10
6070
60700
... More
All in all comprehensive maintenance of Reverse Osmosis water purification system including repair / replacement of components ,consumables , cleaning , servicing etc as per OEM's Guide lines to meet out the TDS level of Water as per client requirement / standard norms after defect laibility period of the equipment. 25 Ltr/hr capacity
3
10250
30750
... More
All in all comprehensive maintenance of Reverse Osmosis water purification system including repair / replacement of components ,consumables , cleaning , servicing etc as per OEM's Guide lines to meet out the TDS level of Water as per client requirement / standard norms after defect laibility period of the equipment. 50 Ltr/hr capacity
12
18220
218640
... More
Providing experienced and Highly skilled/skilled/ semi-skilled/Un Skilled labour for electric repair/ maintenance / operation of Air conditioning/Air cooling/Fire fighting/Lift/DG set/CCTV/EPABX or any other electromechanical systems as per requirement (one shift of 8 Hrs per day for 26 Working Days in a month)
-
-
-
... More
skilled Labour
6
9596
57576
... More
Add for extra working on Holidays.
-
-
-
... More
skilled Labour
30
369
11070
... More
Providing & Fixing of IS : 4985 - 2000 Class -4 (10 Kgf / Sqcm) UPVC drain water piping with fittings (IS:7834 & 10Kgf/sqcm) like elbow, socket, Tee, solvent cement jointing, support with MS hanger on ceiling or recessed in wall with chasing & plastering with 6 mm thick closed cell elastomeric nitrile rubber insulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
-
-
-
... More
20 mm
40
189
7560
... More
SITC of Interconnecting refrigerant copper pipe for split/Ductable/ Casseette AC of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including class 'O' Nitrile rubber sleeves, chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
30
1987
59610
... More
Supply & fixing MS powder coated stand suitable for 1.0/1.5/ 2.0 Tr outdoor type of Split AC. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .
5
580
2900
... More
Supply and laying PVC Insulated and PVC Round Sheathed Multi Core copper conductor (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from 99.90 % purity copper, stranding in acc. to IS:8130/IEC 60228 for lower watt loss , oxygen free for less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, in existing pipe / open trench / Cable tray / on surface including making connection etc. as required. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR
-
-
-
... More
2.5 sq.mm x 3 core
40
148
5920
... More
4.0 sq.mm x 3 core
60
222
13320
... More
Making hole in stone masonary/ RCC wall/ RCC slab with core cutter for accomodating refrigerant pipe/ drain pipe/ MS pipe/ cables etc of following dia
-
-
-
... More
100 mm dia per running inch length
80
160
12800
... More
Dismentling of split air conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc. including shifting of dismentaled material to store complete as required
10
936
9360
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements