Public Works Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Works Department - PWD Tender

Works
Eprocure
Opening Date7 Jun 2023
Closing Date13 Jun 2023
Tender Amount₹ 3,84,21,000 
Notes
Download

Costs

  • EMD

    ₹ 7,68,420
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). By chieseling/wedging out rock where blasting is prohibited in hard rock

-

-

-

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

30

27300

910

... More
Recovery of Stone recevied from Hard rock Cutting stone for Masonary Work 30 % of Hard Rock Cutting

-

-

-

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

9

-9000

1000

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 with lead upto - 50mtr --------------- do ------------with lead 50 mtr to 500 mtr

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

3480.97

274996

79

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 _____do_______ with lead 500-1000mtr

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

3774

373626

99

... More
Renewal of NH-11B to Kota Chhabar Road.

8010

792990

99

... More
Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Dismantling stone masonry Dry rubble masonry

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

270

40230

149

... More
Renewal of NH-11B to Kota Chhabar Road.

235.39

35072

149

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

396

59004

149

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 _____do_______ with lead upto - 50mtr

-

-

-

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

11118.75

522581

47

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

738.72

34719

47

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

5490

258030

47

... More
Construction of Missing Link Road Gawadiyapura

1597.5

75082

47

... More
Scarifying, including picking up scarified material and stacking of old serviceable material with in a lead of 100 metres [MoRTH specification: Clause 501]. Top bituminous surface of surface dressing or premix carpet with all lift and lead upto 1000m for reusable materials.

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

843.75

13500

16

... More
Renewal of NH-11B to Kota Chhabar Road.

2362.5

37800

16

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

3375

54000

16

... More
Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Cement concerte plain 1:2:4 mix and precast cement concerte blocks.

-

-

-

... More
Renewal of NH-11B to Kota Chhabar Road.

195

166530

854

... More
Dismantling Brick/Tile work In cement mortar

-

-

-

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

120

61440

512

... More
Construction of Missing Link Road Gawadiyapura

180

92160

512

... More
Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured).Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 30.To achieve 95% Proctor density

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1521

594711

391

... More
Renewal of NH-11B to Kota Chhabar Road.

2328.75

910541

391

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

1162.5

454537

391

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

346.5

135481

391

... More
Construction of Missing Link Main Road to Chhend ka pura.

554.4

216770

391

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

1120.2

437998

391

... More
Construction of Missing Link Road Gawadiyapura

544.5

212899

391

... More
Providing, laying, spreading and compacting stone aggregate of specific size as per table 400-6 & 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Stone screening to fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edegs, lighting, guarding, barricading and maintenance of diversion etc. [MoRTH specification : Clause 404] (by manual means) with all leads (compacted thickness as specified to be measured) Grading no.2 (63-45mm) crusher broken

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

225

268425

1193

... More
Renewal of NH-11B to Kota Chhabar Road.

140.63

167765

1193

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

42.19

50329

1193

... More
Construction of Missing Link Main Road to Chhend ka pura.

112.5

134212

1193

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

337.5

402637

1193

... More
Construction of Missing Link Road Gawadiyapura

168.75

201318

1193

... More
Providing, laying, spreading and compacting stone aggregate of specific size as per table 400-6 & 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Stone screening to fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edegs, lighting, guarding, barricading and maintenance of diversion etc. [MoRTH specification : Clause 404] (by manual means) with all leads (compacted thickness as specified to be measured) Grading no.3 (53-22.4 mm) crusher broken

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

140.63

176203

1253

... More
Renewal of NH-11B to Kota Chhabar Road.

393.75

493368

1253

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

562.5

704812

1253

... More
Providing and applying primer coat over prepared surface or granular base with bitumen emulsion as per IS: 8887 & manufacturer’s specifications @ 8.5 kg /10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures including cleaning of road surface as per MoRTH specification CIause- 502,112

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1912.5

46282

24.2

... More
Renewal of NH-11B to Kota Chhabar Road.

5355

129591

24.2

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

7650

185130

24.2

... More
Providing and applying tack coat with bitumen emulsion on the prepared surface including cleaning as per IS : 8887 & manufacturer’s specifications @ 2.75 kg /10sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures as per MoRTH specification CI.503,112

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1912.5

17977

9.4

... More
Renewal of NH-11B to Kota Chhabar Road.

9180

86292

9.4

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

7650

71910

9.4

... More
Providing and laying open graded premix carpet 20 mm thick (compacted) on prepared surface in a single course as wearing course, aggregates as per Table 500-23, heating bituminous binder @ 14.6 Kg/10 Sqm. and aggregates in Hot Mix Plant (including cost of antistripping compound, wherever required), transporting the mixed material with tipper and laying with paver finisher to the required level and grade, rolling with power roller 8 - 10 tonne but excluding cost of tack and seal coat with lead for mix of material 1 km. (MoRTH Specification : Clause 511,112) with all lead. In Hot Mix Plant 40-60 TPH, including loading of aggregates with F.E loader. with bitumen grade VG-30

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1912.5

197752

103.4

... More
Renewal of NH-11B to Kota Chhabar Road.

9180

949212

103.4

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

7650

791010

103.4

... More
Providing and applying premixed seal coat type "B" comprising of thin application of fine aggregate (0.06 Cum. per 10 Sqm) premix with 6.8 Kg. per 10 sqm bitumen binder (including cost of antistripping compound, wherever required) in mini hot mix plant 6-10 TPH and laying and rolling with power roller 8-10 tonne including all lead of mix material [MORTH Specification : Clause 513] with all lead. with bitumen grade VG-30

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1912.5

67320

35.2

... More
Renewal of NH-11B to Kota Chhabar Road.

9180

323136

35.2

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

7650

269280

35.2

... More
Construction of dry lean cement concrete sub- base over a prepared sub - grade with coarse and fine aggregate conforming to IS : 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15 : 1, aggregate gradation after blending to be as per Table 600 -1, cement content not to be less than 150 Kg/Cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant as per mix design, transported to site, laid with a hydrostatic paver with electronic sensor, compacting with 8 -10 tonne vibratory roller, finishing and curing complete as per MoRTH specification clause 601.

-

-

-

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

236.67

625755

2644

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

151.87

401533

2644

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound and water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1012.5

5766187

5695

... More
Renewal of NH-11B to Kota Chhabar Road.

576.56

3283523

5695

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

562.5

3203437

5695

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

262.5

1494937

5695

... More
Construction of Missing Link Main Road to Chhend ka pura.

450

2562750

5695

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

675

3844125

5695

... More
Construction of Missing Link Road Gawadiyapura

337.5

1922062

5695

... More
P& F Mukhya Mantri Sadak Yojana logo for roads funded by State road fund having M.S. Definition plate of 1.6mm thickness frame to steel hollow dsection of 75mm x 75mm, 2.5m long stove enamelled paint with hold fast including paint logo as per approved design and colours. The logo shall be made out of 1.6mm thick circular plate fix on 1200mm x 150mm rectangular steel base plate 1.6mm thick, the base of circular shall be plain at the junction of base plate. The size of definition plate shall be 1500x600mm and embedding the posts by M-15 mix C.C. block 300x300x600 mm including lettering / writing and painting etc. complete in all respect.

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1

11942

11942

... More
Renewal of NH-11B to Kota Chhabar Road.

1

11942

11942

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

1

11942

11942

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

1

11942

11942

... More
Construction of Missing Link Main Road to Chhend ka pura.

1

11942

11942

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

1

11942

11942

... More
Construction of Missing Link Road Gawadiyapura

1

11942

11942

... More
Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700 P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size.

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

4.67

15931

3415.2

... More
Renewal of NH-11B to Kota Chhabar Road.

4.67

15931

3415.2

... More
Providing, laying & fixing in position RCC spun or hume pipes ISI marked with proper jointing in required slope packed in the gasket of hume or spun yarn and neatly finished with rich grout of cement moratar 1:3 or having flexible rubber ring joint made with prefectly air and water tight including testing of joints as per MoRTH Specfication : Clause : 1000 & 2900 NP -3 (Single Row) 300 mm dia

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

37.5

17077

455.4

... More
Renewal of NH-11B to Kota Chhabar Road.

37.5

17077

455.4

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

37.5

17077

455.4

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

15

6831

455.4

... More
Supply of direction and place identification sign boards made out of 2mm thick sheet framed to angle iron 40 x 40 x 5 mm and two vertical posts of angle size 65 x 65 x 6 mm, 3 m long with hold fasts, stove enamelled paint and reflective letters,numerals,symbols etc. complete of size : 900 x 750 mm

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1

3107

3107

... More
Renewal of NH-11B to Kota Chhabar Road.

1

3107

3107

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

1

3107

3107

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

1

3107

3107

... More
Construction of Missing Link Main Road to Chhend ka pura.

1

3107

3107

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

1

3107

3107

... More
Construction of Missing Link Road Gawadiyapura

1

3107

3107

... More
S & F in position precast R.C.C. stone (M-15 mix) of standard IRC design including finishing in cement sand mortar 1:3, painting with enamel paint, printing letters and numerals etc. complete (MoRTH specifications clause : 800)

-

-

-

... More
Ordinary km stone for NH

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

1

1247

1247

... More
Renewal of NH-11B to Kota Chhabar Road.

4

4988

1247

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

4

4988

1247

... More
Renewal work of Masalpur-Kheda Road to Arjunpura (Chamrupura).

1

1247

1247

... More
Construction of Missing Link Main Road to Chhend ka pura.

1

1247

1247

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

2

2494

1247

... More
Construction of Missing Link Road Gawadiyapura

2

2494

1247

... More
200 m stone

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

4

1424

356

... More
Renewal of NH-11B to Kota Chhabar Road.

15

5340

356

... More
Renewal Work of NH-11B to Jatav Basti Chainpur.

12

4272

356

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

5

1780

356

... More
Construction of Missing Link Road Gawadiyapura

4

1424

356

... More
PART-'B' (Syphon)

-

-

-

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil 3m. Clear from the edge of excavation and subsequent filling around hume pipes/masonry in 15cm layers with compaction including disposal of all surplus soil as directed within a lead of 1000 metres.[MoRTH Specification : Clause 301,304]. Ordinary Soil

-

-

-

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

15.78

1956

124

... More
Construction of Missing Link Road Gawadiyapura

11.84

1467

124

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil 3m. Clear from the edge of excavation and subsequent filling around hume pipes/masonry in 15cm layers with compaction including disposal of all surplus soil as directed within a lead of 1000 metres.[MoRTH Specification : Clause 301,304]. Hard soil with pick work

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

5.25

808

154

... More
Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700 P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size.

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

3.26

11116

3415.2

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

9.57

32666

3415.2

... More
Construction of Missing Link Road Gawadiyapura

7.17

24500

3415.2

... More
Providing, laying & fixing in position RCC spun or hume pipes ISI marked with proper jointing in required slope packed in the gasket of hume or spun yarn and neatly finished with rich grout of cement moratar 1:3 or having flexible rubber ring joint made with prefectly air and water tight including testing of joints as per MoRTH Specfication : Clause : 1000 & 2900 NP -3 (Single Row) 300 mm dia

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

30

13662

455.4

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

40

18216

455.4

... More
Construction of Missing Link Road Gawadiyapura

30

13662

455.4

... More
Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 in cement mortar 1:4

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

2.4

7791

3245

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

4.8

15585

3245

... More
Construction of Missing Link Road Gawadiyapura

3.6

11688

3245

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 50 mm thick

-

-

-

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

4

1116

279

... More
Construction of Missing Link Road Gawadiyapura

3

837

279

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 75 mm thick

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

2

838

419

... More
Raised and cut pointing on stone work in CM 1:2 (1 cement : 2 sand)

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

5.19

593

114.4

... More
Construction of Missing Link Road from Kati Nadi to Darulapura.

10.38

1187

114.4

... More
Construction of Missing Link Road Gawadiyapura

7.79

890

114.4

... More
PART-'C' Protection Wall

-

-

-

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil 3m. Clear from the edge of excavation and subsequent filling around hume pipes/masonry in 15cm layers with compaction including disposal of all surplus soil as directed within a lead of 1000 metres.[MoRTH Specification : Clause 301,304]. Ordinary Soil

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

200.84

24903

124

... More
Renewal of NH-11B to Kota Chhabar Road.

172.8

21427

124

... More
Construction of Missing Link Road Gawadiyapura

163.2

20236

124

... More
Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700P.C.C. 1:3:6 mix with stone aggragate 40 mm hand broken

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

25.11

81458

3244.7

... More
Renewal of NH-11B to Kota Chhabar Road.

21.6

70085

3244.7

... More
Construction of Missing Link Road Gawadiyapura

20.4

66191

3244.7

... More
Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 Random rubble masonry in cement mortar 1:4

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

324.27

1052252

3245

... More
Renewal of NH-11B to Kota Chhabar Road.

279

905355

3245

... More
Construction of Missing Link Road Gawadiyapura

234.62

761345

3245

... More
Raised and cut pointing on stone work in CM 1:2 (1 cement : 2 sand)

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

180

20592

114.4

... More
Renewal of NH-11B to Kota Chhabar Road.

155

17732

114.4

... More
Construction of Missing Link Road Gawadiyapura

170

19448

114.4

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 50 mm thick

-

-

-

... More
Construction of Missing Link Konder to Nahargarh.

52.3

14592

279

... More
Renewal of NH-11B to Kota Chhabar Road.

45

12555

279

... More
Construction of Missing Link Road Gawadiyapura

38.25

10671

279

... More
PART- 'D' Hume Pipe Culvert 2x600 mm Dia

-

-

-

... More
Earthwork in excavation in foundation trenches etc. not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil 3m. Clear from the edge of excavation and subsequent filling around hume pipes/masonry in 15cm layers with compaction including disposal of all surplus soil as directed within a lead of 1000 metres.[MoRTH Specification : Clause 301,304]. Hard soil with pick work

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

33.75

5197

154

... More
Providing and laying mechanically mixed and vibrated Cement Concrete in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level as per MoRTH Specification : Clause 1000 & 1700 P.C.C. 1:3:6 mix with crushed stone aggregate 20 mm nominal size.

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

18.32

62563

3415.2

... More
Providing and laying stone masonry work in cement mortar with mechanical mixer for foundation (any level) complete including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 in cement mortar 1:4

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

34.3

111290

3245

... More
Providing, laying & fixing in position RCC spun or hume pipes ISI marked with proper jointing in required slope packed in the gasket of hume or spun yarn and neatly finished with rich grout of cement moratar 1:3 or having flexible rubber ring joint made with prefectly air and water tight including testing of joints as per MoRTH Specfication : Clause : 1000 & 2900 NP - 3 (Double Row) 600 mm dia

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

7.5

23973

3196.5

... More
Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

12

2772

231

... More
Providing Cement plaster 12mm thick in cement mortar 1:3 at all levels as per MoRTH Specfication: Clause:1000 & 1300

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

25

3575

143

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 75 mm thick

-

-

-

... More
Construction of Missing Link Main Road to Chhend ka pura.

10

4190

419



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.