Public Health Engineering Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date28 Mar 2025
Closing Soon7 Apr 2025
Tender Amount₹ 10,00,000 
Notes
Download

Costs

  • EMD

    ₹ 20,000
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Summary

Nit No 97/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80/90mm

1

262

262

... More
100/110mm

1

299

299

... More
125/140mm

1

364

364

... More
150/160/180mm

1

381

381

... More
200/225mm

1

640

640

... More
Add 5% EXTRA on above item no. 1 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

1

296

296

... More
100mm

1

334

334

... More
125mm

1

360

360

... More
150mm

1

432

432

... More
200mm

1

656

656

... More
Add 5% EXTRA on above item no. 2 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.2 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
50/63/75mm

1

181

181

... More
80/90mm

1

186

186

... More
100/110mm

1

221

221

... More
125/140mm

1

249

249

... More
150/160/180mm

1

249

249

... More
200/225mm

1

334

334

... More
Add 5% EXTRA on above item no. 3 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.3 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above no.3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

1

534

534

... More
100 mm

1

578

578

... More
125 mm

1

650

650

... More
150 mm

1

774

774

... More
200 mm

1

901

901

... More
Add 5% EXTRA on above item no. 4 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.4 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr

-

-

-

... More
Deduct 20% on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

1

310

310

... More
90/80 mm

1

317

317

... More
110/100 mm

1

354

354

... More
140/125 mm

1

419

419

... More
180/160/150 mm

1

436

436

... More
225/200 mm

1

915

915

... More
Add 5% EXTRA on above item no. 1.5 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.1.5 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 1.5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

1

334

334

... More
100 mm

1

372

372

... More
125 mm

1

436

436

... More
150 mm

1

436

436

... More
225/200 mm

1

969

969

... More
Add 5% EXTRA on above item no. 6 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.6 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr.

-

-

-

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.

1

254

254

... More
Add 5% EXTRA on above item no. 7 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm dia pipe to 100mm

1

327

327

... More
125 mm dia pipe to 150mm

1

392

392.5

... More
200 mm dia pipe to 250mm

1

632

632

... More
Add 5% EXTRA on above item no. 8 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.8 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 110 mm

1

1383

1383

... More
125 mm to 165 mm

1

1821

1821

... More
200 mm to 300 mm

1

2368

2368

... More
Add 5% EXTRA on above item no. 9 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.9 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 100 mm

1

1582

1582.63

... More
125 mm to 150 mm

1

1920

1920.19

... More
200 mm to 300 mm

1

2529

2529.31

... More
Add 5% EXTRA on above item no.10 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.10 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Labour charges for removal of complaint of polluted water supply to the consumers

-

-

-

... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours

1

715

715

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
50 to 75 mm

1

420

420

... More
80-110 mm

1

445

445

... More
125 to 165 mm

1

529

529

... More
200 to 300 mm

1

909

909

... More
Add 5% EXTRA on above item no.12 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.12 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no. 12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
80-100 mm

1

463

463

... More
125 to 150 mm

1

546

546

... More
200 to 300 mm

1

963

963

... More
Add 5% EXTRA on above item 13 for B.T. Road

-

-

-

... More
Add 15% EXTRA on above item no.13 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only

-

-

-

... More
Add 20% EXTRA on above item no.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

680

680.63

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

1065

1065.63

... More
Providing, lowering, laying and jointing in trenches,  standard lengths HDPE ISI marked Pipes as per IS-4984: 1995 (amended up to date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work) . Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. Supply may be in coil or straight length in 6 M/12 M.

-

-

-

... More
HDPE PE-80 PN-6

-

-

-

... More
75 mm dia

1

217

217

... More
90 mm dia

1

306

306

... More
110 mm dia

1

463

463

... More
125 mm dia

1

664

664

... More
140 mm dia

1

827

827

... More
160 mm dia

1

1041

1041

... More
180 mm dia

1

1308

1308

... More
200 mm dia

1

1567

1567

... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil

1

200

200

... More
Ordinary rock

1

366

366

... More
Hard rock(blasting prohibited)

1

930

930

... More
Providing, Fabrication of Mild Steel Plane Ended/ Flanged Specials like Tees, Bends, Reducers, Enlargers, Plugs, Tail Pieces and Blank Flange made from MS pipes, MS sheet strip and MS Sheet of required sizes by welding, cutting and treading as per site conditions and as directed by the Engineer- In- Charge complete in all respect.

1

110

110



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.