Public Health Engineering Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Public Health Engineering Department - PHED Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date14 May 2022
Closing Date25 May 2022
Tender Amount₹ 2,50,000
Costs
EMD
₹ 5,000Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PHCJA_274510_7Bid Award Id
ViewTender No
EE/PHED/SGNR/06/2022-23Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedwater.rajasthan.gov.in/phed
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
80/90mm
-
-
262
100/110mm
-
-
299
125/140mm
-
-
364
150/160/180mm
-
-
381
200/225mm
-
-
640
Add on above item for B.T. Road
-
-
0.05
Add on above item for C.C. Road
-
-
0.1
Add on above item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
-
-
0.2
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth and more than 1.20 Mtr. in Length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) In all type Soil
-
-
-
80mm
-
-
296
100mm
-
-
334
125mm
-
-
360
150mm
-
-
432
200mm
-
-
656
250mm
-
-
1032
Add on above item for B.T. Road
-
-
0.05
Add on above item for C.C. Road
-
-
0.1
Add on above item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
-
-
0.2
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth and upto 1.2 Mtr. in length of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) In all type Soil
-
-
-
50/63/75mm
-
-
181
80/90mm
-
-
186
100/110mm
-
-
221
125/140mm
-
-
249
150/160/180mm
-
-
249
200/225mm
-
-
334
Add on above item for B.T. Road
-
-
0.05
Add on above item for C.C. Road
-
-
0.1
Add on above item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.
-
-
0.2
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
-
-
-
75 mm
-
-
310
90/80 mm
-
-
317
110/100 mm
-
-
354
140/125 mm
-
-
419
180/160/150 mm
-
-
436
225/200 mm
-
-
915
Add on above item for B.T. Road
-
-
0.05
Add on above item for CC Road
-
-
0.1
Add on above item if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.
-
-
0.2
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
-
-
254
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size In all type Soil
-
-
-
50 to 75 mm
-
-
420
80-110 mm
-
-
445
125 to 165 mm
-
-
529
200 to 300 mm
-
-
909
Add on above item for B.T. Road
-
-
0.05
Add on above item for CC Road
-
-
0.1
Add on above item if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.
-
-
0.2
Evaluation Notes How It Works ?
Potential Partner