Public Health Engineering Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 17,100Document Cost
₹ 500Tender Fee
₹ 500
Summary
Mjsy 2 Openwell In Village Ganeshpura
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHCJA_433399_1Bid Award Id
ViewTender No
NIT NO 36-39/2024-25Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard rocks
244.92
976
239041.92
... More
Add extra over no 2.39.1 for every additional lift of 1.50 mtr or part thereof: in all kind of soil
-
-
-
... More
1.50 to 3.00 mtr
24.92
47
1171.24
... More
Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock.
-
-
-
... More
3.00 to 4.50 mtr
24.92
134
3338.74
... More
4.50 to 5.50 mtr
16.61
201
3338.81
... More
5.50 to 6.00 mtr
6.28
268
1683.04
... More
6.00 to 7.50 mtr
18.84
268
5049.12
... More
7.50 to 9.00 mtr
18.84
335
6311.4
... More
9.00 to 10.50mtr
18.84
402
7573.68
... More
10.50 to 12.00 mtr
18.84
469
8835.96
... More
12.00 to 13.50 mtr
18.84
536
10098.24
... More
13.50 to 15.00 mtr
18.84
603
11360.52
... More
15.00 to 16.50 mtr
18.84
670
12622.8
... More
16.50 to 18.00 mtr
18.84
737
13885.08
... More
18.00 to 19.50 mtr
18.84
804
15147.36
... More
19.50 to 21.00 mtr
18.84
871
16409.64
... More
21.00 to 22.50 mtr
18.84
938
17671.92
... More
22.50 to 24.00 mtr
18.84
1005
18934.2
... More
24.00 to 25.00 mtr
12.56
1072
13464.32
... More
Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering.
238.64
195
46582.53
... More
Labour charges for horizontal boring 100 mm dia in open well in rocky strata with all types of rock cutting & drilling tools etc. including all T&P required for job including dewatering arrangement.
150
626
93900
... More
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:
19.84
4934
97890.56
... More
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.
260.62
157
40917.34
... More
Add 20% extra for shuttering in circular work (in respective centering and shuttering items)
260.62
31
8183.47
... More
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)
-
-
-
... More
Cold twisted deformed bars (IS : 1786).
1000
77
77000
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete:
500
81
40500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements