Public Health Engineering Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date7 Jan 2025
Closing Soon20 Jan 2025
Tender Amount₹ 9,50,000 
Notes
Download

Costs

  • EMD

    ₹ 19,000
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80/90mm

1

262

262

... More
100/110mm

1

299

299

... More
125/140mm

1

364

364

... More
150/160/180mm

1

381

381

... More
200/225mm

1

640

640

... More
250/280mm

1

851

851

... More
300/315mm

1

851

851

... More
350mm

1

1123

1123

... More
400mm

1

1178

1178

... More
450mm

1

1325

1325

1

1472

1472

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.1)

1

12

12.75

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.2)

1

13

13.1

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.3)

1

14

14.95

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.4)

1

18

18.2

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.5)

1

19

19.05

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.6)

1

32

32

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.7)

1

42

42.55

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.8)

1

42

42.55

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.9)

1

56

56.15

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.10)

1

58

58.9

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.11)

1

66

66.25

... More
Add on above item no. 1.1.1 for B.T. Road 5% (1.1.1.12)

1

73

73.6

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.1)

1

38

38.25

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.2)

1

39

39.3

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.3)

1

44

44.85

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.4)

1

54

54.6

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.5)

1

57

57.15

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.6)

1

96

96

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.7)

1

127

127.65

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.8)

1

127

127.65

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.9)

1

168

168.45

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.10)

1

176

176.7

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.11)

1

198

198.75

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.1.1.12)

1

220

220.8

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.1)

1

51

51

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.2)

1

52

52.4

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.3)

1

59

59.8

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.4)

1

72

72.8

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.5)

1

76

76.2

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.6)

1

128

128

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.7)

1

170

170.2

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.8)

1

170

170.2

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.9)

1

224

224.6

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.10)

1

235

235.6

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.11)

1

265

265

... More
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.1.1.12)

1

294

294.4

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.1)

1

76

76.5

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.2)

1

78

78.6

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.3)

1

89

89.7

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.4)

1

109

109.2

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.5)

1

114

114.3

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.6)

1

192

192

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.7)

1

255

255.3

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.8)

1

255

255.3

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.9)

1

336

336.9

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.10)

1

353

353.4

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.11)

1

397

397.5

... More
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. 30% (1.1.1.12)

1

441

441.6

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

1

296

296

... More
100mm

1

334

334

... More
125mm

1

360

360

... More
150mm

1

432

432

... More
200mm

1

656

656

... More
250mm

1

1032

1032

1

1032

1032

... More
350mm

1

1277

1277

... More
400mm

1

1442

1442

... More
450 mm

1

2509

2509

... More
500 mm

1

3284

3284

... More
600mm

1

3524

3524

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.1)

1

14

14.8

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.2)

1

16

16.7

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.3)

1

18

18

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.4)

1

21

21.6

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.5)

1

32

32.8

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.6)

1

51

51.6

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.7)

1

51

51.6

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.8)

1

63

63.85

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.9)

1

72

72.1

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.10)

1

125

125.45

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.11)

1

164

164.2

... More
Add on above item no. 1.2.1 for B.T. Road 5% (1.2.1.12)

1

176

176.2

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.1)

1

44

44.4

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.2)

1

50

50.1

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.3)

1

54

54

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.4)

1

64

64.8

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.5)

1

98

98.4

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.6)

1

154

154.8

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.7)

1

154

154.8

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.8)

1

191

191.55

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.9)

1

216

216.3

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.10)

1

376

376.35

... More
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.11)

1

492

492.6

... More
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.2.1.12)

1

528

528.6

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.1)

1

59

59.2

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.2)

1

66

66.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.3)

1

72

72

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.4)

1

86

86.4

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.5)

1

131

131.2

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.6)

1

206

206.4

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.7)

1

206

206.4

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.8)

1

255

255.4

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.9)

1

288

288.4

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.10)

1

501

501.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.11)

1

656

656.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.2.1.12)

1

704

704.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.1)

1

88

88.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.2)

1

100

100.2

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.3)

1

108

108

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.4)

1

129

129.6

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.5)

1

196

196.8

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.6)

1

309

309.6

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.7)

1

309

309.6

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.8)

1

383

383.1

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.9)

1

432

432.6

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.10)

1

752

752.7

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.11)

1

985

985.2

... More
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. 30% (1.2.1.12)

1

1057

1057.2

... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
50/63/75mm

1

181

181

... More
80/90mm

1

186

186

... More
100/110mm

1

221

221

... More
125/140mm

1

249

249

... More
150/160/180mm

1

249

249

... More
200/225mm

1

334

334

... More
250/280mm

1

611

611

... More
300/315mm

1

729

729

1

833

833

1

950

950

... More
450 mm

1

1126

1126

... More
500 mm

1

1199

1199

... More
600 mm

1

1247

1247

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.1)

1

9

9.05

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.2)

1

9

9.3

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.3)

1

11

11.05

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.4)

1

12

12.45

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.5)

1

12

12.45

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.6)

1

16

16.7

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.7)

1

30

30.55

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.8)

1

36

36.45

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.9)

1

41

41.65

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.10)

1

47

47.5

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.11)

1

56

56.3

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.12)

1

59

59.95

... More
Add on above item no. 1.3.1 for B.T. Road 5% (1.3.1.12)

1

62

62.35

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.1)

1

27

27.15

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.2)

1

27

27.9

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.3)

1

33

33.15

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.4)

1

37

37.35

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.5)

1

37

37.35

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.6)

1

50

50.1

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.7)

1

91

91.65

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.8)

1

109

109.35

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.9)

1

124

124.95

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.10)

1

142

142.5

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.11)

1

168

168.9

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.12)

1

179

179.85

... More
Add on above item no. 1.3.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.3.1.13)

1

187

187.05

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.1)

1

36

36.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.2)

1

37

37.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.3)

1

44

44.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.4)

1

49

49.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.5)

1

49

49.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.6)

1

66

66.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.7)

1

122

122.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.8)

1

145

145.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.9)

1

166

166.6

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.10)

1

190

190

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.11)

1

225

225.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.12)

1

239

239.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.3.1.13)

1

249

249.4

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.1)

1

54

54.3

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.2)

1

55

55.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.3)

1

66

66.3

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.4)

1

74

74.7

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.5)

1

74

74.7

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.6)

1

100

100.2

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.7)

1

183

183.3

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.8)

1

218

218.7

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.9)

1

249

249.9

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.10)

1

285

285

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.11)

1

337

337.8

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.12)

1

359

359.7

... More
Add on above no. 1.3.1 item if depth of pipeline is above 3.0 mtr. 30% (1.3.1.13)

1

374

374.1

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

1

534

534

... More
100 mm

1

578

578

... More
125 mm

1

650

650

... More
150 mm

1

774

774

... More
200 mm

1

901

901

... More
250 mm

1

1261

1261

... More
300 mm

1

1559

1559

... More
350 mm

1

1989

1989

... More
400 mm

1

2356

2356

... More
450 mm

1

2468

2468

... More
500 mm

1

2887

2887

... More
600 mm

1

3204

3204

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.1)

1

26

26.7

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.2)

1

28

28.9

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.3)

1

32

32.5

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.4)

1

38

38.7

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.5)

1

45

45.05

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.6)

1

63

63.05

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.7)

1

77

77.95

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.8)

1

99

99.45

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.9)

1

117

117.8

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.10)

1

123

123.4

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.11)

1

144

144.35

... More
Add on above item no. 1.4.1 for B.T. Road 5% (1.4.1.12)

1

160

160.2

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.1)

1

80

80.1

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.2)

1

86

86.7

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.3)

1

97

97.5

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.4)

1

116

116.1

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.5)

1

135

135.15

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.6)

1

189

189.15

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.7)

1

233

233.85

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.8)

1

298

298.35

... More
Add on above item no.1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.9)

1

353

353.4

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.10)

1

370

370.2

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.11)

1

433

433.05

... More
Add on above item no. 1.4.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.4.1.12)

1

480

480.6

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.1)

1

106

106.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.2)

1

115

115.6

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.3)

1

130

130

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.4)

1

154

154.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.5)

1

180

180.2

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.6)

1

252

252.2

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.7)

1

311

311.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.8)

1

397

397.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.9)

1

471

471.2

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.10)

1

493

493.6

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.11)

1

577

577.4

... More
Add on above no. 1.4.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.4.1.12)

1

640

640.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.1)

1

160

160.2

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.2)

1

173

173.4

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.3)

1

195

195

... More
Add on above no.1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.4)

1

232

232.2

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.5)

1

270

270.3

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.6)

1

378

378.3

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.7)

1

467

467.7

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.8)

1

596

596.7

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.9)

1

706

706.8

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.10)

1

740

740.4

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.11)

1

866

866.1

... More
Add on above no. 1.4.1 item if depth of pipeline is above 3.0 mtr. 30% (1.4.1.12)

1

961

961.2

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

1

310

310

... More
90/80 mm

1

317

317

... More
110/100 mm

1

354

354

... More
140/125 mm

1

419

419

... More
180/160/150 mm

1

436

436

... More
225/200 mm

1

915

915

... More
250 mm

1

989

989

... More
300 mm

1

1044

1044

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.1)

1

15

15.5

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.2)

1

15

15.85

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.3)

1

17

17.7

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.4)

1

20

20.95

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.5)

1

21

21.8

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.6)

1

45

45.75

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.7)

1

49

49.45

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.8)

1

52

52.2

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.1)

1

46

46.5

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.2)

1

47

47.55

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.3)

1

53

53.1

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.4)

1

62

62.85

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.5)

1

65

65.4

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.6)

1

137

137.25

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.7)

1

148

148.35

... More
Add on above item no. 1.5.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.5.1.8)

1

156

156.6

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.1)

1

62

62

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.2)

1

63

63.4

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.3)

1

70

70.8

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.4)

1

83

83.8

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.5)

1

87

87.2

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.6)

1

183

183

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.7)

1

197

197.8

... More
Add on above no. 1.5.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.5.1.8)

1

208

208.8

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.1)

1

93

93

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.2)

1

95

95.1

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.3)

1

106

106.2

... More
Add on above no.1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.4)

1

125

125.7

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.5)

1

130

130.8

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.6)

1

274

274.5

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.7)

1

296

296.7

... More
Add on above no. 1.5.1 item if depth of pipeline is above 3.0 mtr. 30% (1.5.1.8)

1

313

313.2

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

1

334

334

... More
100 mm

1

372

372

... More
125 mm

1

436

436

... More
150 mm

1

436

436

... More
225/200 mm

1

969

969

... More
250 mm

1

1042

1042

... More
300 mm

1

1097

1097

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.1)

1

16

16.7

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.2)

1

18

18.6

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.3)

1

21

21.8

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.4)

1

21

21.8

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.5)

1

48

48.45

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.6)

1

52

52.1

... More
Add on above item no. 1.6.1 for B.T. Road 5% (1.6.1.7)

1

54

54.85

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.1)

1

50

50.1

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.2)

1

55

55.8

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.3)

1

65

65.4

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.4)

1

65

65.4

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.5)

1

145

145.35

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.6)

1

156

156.3

... More
Add on above item no. 1.6.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.6.1.7)

1

164

164.55

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.1)

1

66

66.8

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.2)

1

74

74.4

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.3)

1

87

87.2

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.4)

1

87

87.2

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.5)

1

193

193.8

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.6)

1

208

208.4

... More
Add on above no. 1.6.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.6.1.7)

1

219

219.4

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.1)

1

100

100.2

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.2)

1

111

111.6

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.3)

1

130

130.8

... More
Add on above no.1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.4)

1

130

130.8

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.5)

1

290

290.7

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.6)

1

312

312.6

... More
Add on above no. 1.6.1 item if depth of pipeline is above 3.0 mtr. 30% (1.6.1.7)

1

329

329.1

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour.

1

254

254

... More
Add on above item no. 1.7 for B.T. Road 5%

1

12

12.7

... More
Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15%

1

38

38.1

... More
Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20%

1

50

50.8

... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm dia pipe to 100mm

1

327

327

... More
125 mm dia pipe to 150mm

1

392

392

... More
200 mm dia pipe to 250mm

1

632

632

... More
300 mm dia pipe to 350mm

1

1155

1155

... More
400 mm dia pipe

1

1628

1628

... More
450 mm dia pipe

1

1767

1767

... More
500 mm dia pipe

1

1960

1960

... More
600 mm dia pipe

1

2387

2387

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.1)

1

16

16.35

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.2)

1

19

19.6

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.3)

1

31

31.6

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.4)

1

57

57.75

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.5)

1

81

81.4

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.6)

1

88

88.35

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.7)

1

98

98

... More
Add on above item no. 1.5.1 for B.T. Road 5% (1.5.1.8)

1

119

119.35

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.1)

1

49

49.05

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.2)

1

58

58.8

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.3)

1

94

94.8

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.4)

1

173

173.25

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.5)

1

244

244.2

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.6)

1

265

265.05

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.7)

1

294

294

... More
Add on above item no. 1.8.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.8.1.8)

1

358

358.05

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.1)

1

65

65.4

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.2)

1

78

78.4

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.3)

1

126

126.4

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.4)

1

231

231

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.5)

1

325

325.6

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.6)

1

353

353.4

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.7)

1

392

392

... More
Add on above no. 1.8.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.8.1.8)

1

477

477.4

... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 110 mm

1

1383

1383

... More
125 mm to 165 mm

1

1821

1821

... More
200 mm to 300 mm

1

2368

2368

... More
Add on above item no. 1.9.1 for B.T. Road 5% (1.9.1.1)

1

69

69.15

... More
Add on above item no. 1.9.1 for B.T. Road 5% (1.9.1.2)

1

91

91.05

... More
Add on above item no. 1.9.1 for B.T. Road 5% (1.9.1.3)

1

118

118.4

... More
Add on above item no. 1.9.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.9.1.1)

1

207

207.45

... More
Add on above item no. 1.9.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.9.1.2)

1

273

273.15

... More
Add on above item no. 1.9.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.9.1.3)

1

355

355.2

... More
Add on above no. 1.9.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.9.1.1)

1

276

276.6

... More
Add on above no. 1.9.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.9.1.2)

1

364

364.2

... More
Add on above no. 1.9.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.9.1.3)

1

473

473.6

... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 100 mm

1

1583

1583

... More
125 mm to 150 mm

1

1920

1920

... More
200 mm to 300 mm

1

2529

2529

... More
350 mm to 450 mm

1

2739

2739

... More
500 mm to 600 mm

1

3389

3389

... More
Add on above item no. 1.10.1 for B.T. Road 5% (1.10.1.1)

1

79

79.15

... More
Add on above item no. 1.10.1 for B.T. Road 5% (1.10.1.2)

1

96

96

... More
Add on above item no. 1.10.1 for B.T. Road 5% (1.10.1.3)

1

126

126.45

... More
Add on above item no. 1.10.1 for B.T. Road 5% (1.10.1.4)

1

136

136.95

... More
Add on above item no. 1.10.1 for B.T. Road 5% (1.10.1.5)

1

169

169.45

... More
Add on above item no. 1.10.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.10.1.1)

1

237

237.45

... More
Add on above item no. 1.10.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.10.1.2)

1

288

288

... More
Add on above item no. 1.10.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.10.1.3)

1

379

379.35

... More
Add on above item no. 1.10.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.10.1.4)

1

410

410.85

... More
Add on above item no. 1.10.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.10.1.5)

1

508

508.35

... More
Add on above no. 1.10.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.10.1.1)

1

316

316.6

... More
Add on above no. 1.10.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.10.1.2)

1

384

384

... More
Add on above no. 1.10.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.10.1.3)

1

505

505.8

... More
Add on above no. 1.10.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.10.1.4)

1

547

547.8

... More
Add on above no. 1.10.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.10.1.5)

1

677

677.8

... More
Labour charges for removal of complaint of polluted water supply to the consumers

-

-

-

... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours

1

715

715

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
50 to 75 mm

1

420

420

... More
80-110 mm

1

445

445

... More
125 to 165 mm

1

529

529

... More
200 to 300 mm

1

909

909

... More
350 to 400 mm

1

1260

1260

... More
Add on above item no. 1.12.1 for B.T. Road 5% (1.12.1.1)

1

21

21

... More
Add on above item no. 1.12.1 for B.T. Road 5% (1.12.1.2)

1

22

22.25

... More
Add on above item no. 1.12.1 for B.T. Road 5% (1.12.1.3)

1

26

26.45

... More
Add on above item no. 1.12.1 for B.T. Road 5% (1.12.1.4)

1

45

45.45

... More
Add on above item no. 1.12.1 for B.T. Road 5% (1.12.1.5)

1

63

63

... More
Add on above item no. 1.12.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.12.1.1)

1

63

63

... More
Add on above item no. 1.12.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.12.1.2)

1

66

66.75

... More
Add on above item no. 1.12.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.12.1.3)

1

79

79.35

... More
Add on above item no. 1.12.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.12.1.4)

1

136

136.35

... More
Add on above item no. 1.12.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.12.1.5)

1

189

189

... More
Add on above no. 1.12.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.12.1.1)

1

84

84

... More
Add on above no. 1.12.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.12.1.2)

1

89

89

... More
Add on above no. 1.12.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.12.1.3)

1

105

105.8

... More
Add on above no. 1.12.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.12.1.4)

1

181

181.8

... More
Add on above no. 1.12.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.12.1.5)

1

252

252

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
80-100 mm

1

463

463

... More
125 to 150 mm

1

546

546

... More
200 to 300 mm

1

963

963

... More
350 to 450 mm

1

1298

1298

... More
Add on above item no. 1.13.1 for B.T. Road 5% (1.13.1.1)

1

23

23.15

... More
Add on above item no. 1.13.1 for B.T. Road 5% (1.13.1.2)

1

27

27.3

... More
Add on above item no. 1.13.1 for B.T. Road 5% (1.13.1.3)

1

48

48.15

... More
Add on above item no. 1.13.1 for B.T. Road 5% (1.13.1.4)

1

64

64.9

... More
Add on above item no. 1.13.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.13.1.1)

1

69

69.45

... More
Add on above item no. 1.13.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.13.1.2)

1

81

81.9

... More
Add on above item no. 1.13.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.13.1.3)

1

144

144.45

... More
Add on above item no. 1.13.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only. 15% (1.13.1.4)

1

194

194.7

... More
Add on above no. 1.13.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.13.1.1)

1

92

92.6

... More
Add on above no. 1.13.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.13.1.2)

1

109

109.2

... More
Add on above no. 1.13.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.13.1.3)

1

192

192.6

... More
Add on above no. 1.13.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% (1.13.1.4)

1

259

259.6

... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

681

681

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

1066

1066



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.