Public Health Engineering Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date10 Jul 2024
Closing Date15 Jul 2024
Tender Amount₹ 2,01,000 
Notes
Download

Costs

  • EMD

    ₹ 4,020
  • Document Cost

    ₹ 200
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.3 100/110mm

22

7876

358

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.4 125/140mm

8

3464

433

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.5 150/160/180mm

12

5460

455

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.6 200/225mm

2

1534

767

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.1 50/63/75mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

6

1902

317.1

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.2 80/90mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

18

5877

326.55

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.3 100/110mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

12

4510

375.9

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.4 125/140mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

4

1818

454.65

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.5 150/160/180mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

8

3822

477.75

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.6 200/225mm 1.1.2 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.2 Add on above item no. 1.1.1 for B.T. Road

1

805

805.35

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.1 50/63/75mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

4

1389

347.3

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.2 80/90mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

12

4291

357.65

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.3 100/110mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

6

2470

411.7

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.4 125/140mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

995

497.95

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.5 150/160/180mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

4

2093

523.25

... More
1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.1.6 200/225mm 1.1.3 1.1 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) 1.1.1 In all type Soil AC/PVC/HDPE pipe 1.1.3 Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

882

882.05

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.1 50/63/75mm

15

3240

216

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.2 80/90mm

44

9768

222

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.3 100/110mm

22

5808

264

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.4 125/140mm

8

2392

299

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.5 150/160/180mm

12

3588

299

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.6 200/225mm

2

808

404

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.1 50/63/75mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

8

1814

226.8

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.2 80/90mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

22

5128

233.1

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.3 100/110mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

12

3326

277.2

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.4 125/140mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

4

1255

313.95

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.5 150/160/180mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

8

2511

313.95

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.6 200/225mm 1.3.2 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.2 Add on above item no. 1.3.1 for B.T. Road

1

424

424.2

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.1 50/63/75mm 1.3.3 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.3 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

4

993

248.4

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.2 80/90mm 1.3.3 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.3 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

12

3063

255.3

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.3 100/110mm 1.3.3 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.3 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

6

1821

303.6

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.5 150/160/180mm 1.3.3 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.3 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

4

1375

343.85

... More
1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.1.6 200/225mm 1.3.3 1.3 Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) 1.3.1 In all type Soil 1.3.3 Add on above item no. 1.3.1 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

464

464.6

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.1 80 mm

4

2536

634

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.2 100 mm

6

4110

685

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.3 125 mm

2

1542

771

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.4 150 mm

4

3664

916

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.5 200 mm

1

1066

1066

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.1 80 mm 1.4.2 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.2 Add on above item no. 1.4.1 for B.T. Road

2

1331

665.7

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.2 100 mm 1.4.2 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.2 Add on above item no. 1.4.1 for B.T. Road

4

2877

719.25

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.3 125 mm 1.4.2 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.2 Add on above item no. 1.4.1 for B.T. Road

1

809

809.55

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.4 150 mm 1.4.2 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.2 Add on above item no. 1.4.1 for B.T. Road

2

1923

961.8

... More
1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.1.5 200 mm 1.4.2 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil 1.4.2 Add on above item no. 1.4.1 for B.T. Road

1

1119

1119.3

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.1 50/63/75mm

2

732

366

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.2 80/90mm

8

3000

375

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.3 100/110mm

6

2532

422

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.4 125/140mm

2

994

497

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.5 150/160/180mm

6

3114

519

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.1 50/63/75mm 1.5.2 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.2 Add on above item no. 1.5.1 for B.T. Road

1

384

384.3

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.2 80/90mm 1.5.2 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.2 Add on above item no. 1.5.1 for B.T. Road

4

1575

393.75

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.3 100/110mm 1.5.2 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.2 Add on above item no. 1.5.1 for B.T. Road

4

1772

443.1

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.4 125/140mm 1.5.2 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.2 Add on above item no. 1.5.1 for B.T. Road

1

521

521.85

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.5 150/160/180mm 1.5.2 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.2 Add on above item no. 1.5.1 for B.T. Road

2

1089

544.95

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.1 50/63/75mm 1.5.3 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.3 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

420

420.9

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.2 80/90mm 1.5.3 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.3 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

862

431.25

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.3 100/110mm 1.5.3 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.3 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

485

485.3

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.4 125/140mm 1.5.3 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.3 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

571

571.55

... More
1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.1.5 150/160/180mm 1.5.3 1.5 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.5.1 In all type Soil 1.5.3 Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

596

596.85

... More
1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour.

12

3672

306

... More
1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour. 1.7.1 1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour. 1.7.1 Add on above item no. 1.7 for B.T. Road

8

2570

321.3

... More
1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour. 1.7.2 1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T and P and labour. 1.7.2 Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

703

351.9

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.1 80 mm to 110 mm 1.9.2 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.2 Add on above item no. 1.9.1 for B.T. Road

2

3534

1767.15

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.2 125 mm to 165 mm 1.9.2 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.2 Add on above item no. 1.9.1 for B.T. Road

2

4647

2323.65

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.3 200 mm to 300 mm 1.9.2 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.2 Add on above item no. 1.9.1 for B.T. Road

2

6108

3054.45

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.1 80 mm to 110 mm 1.9.3 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.3 Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

3870

1935.45

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.2 125 mm to 165 mm 1.9.3 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.3 Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

5089

2544.95

... More
1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.1.3 200 mm to 300 mm 1.9.3 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T and P and labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). 1.9.1 In all type Soil 1.9.3 Add on above item no. 1.9.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

3345

3345.35

... More
1.11 Labour charges for removal of complaint of polluted water supply to the consumers 1.11.1 Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours

2

1728

864

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.1 50 to 75 mm

2

988

494

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.2 80-110 mm

1

526

526

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.3 125 to 165 mm

1

625

625

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.4 200 to 300 mm

1

1053

1053

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.1 50 to 75 mm 1.12.2 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.2 Add on above item no.1.12.1 for B.T. Road

2

1037

518.7

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.2 80-110 mm 1.12.2 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.2 Add on above item no.1.12.1 for B.T. Road

2

1104

552.3

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.3 125 to 165 mm 1.12.2 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.2 Add on above item no.1.12.1 for B.T. Road

1

656

656.25

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.4 200 to 300 mm 1.12.2 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.2 Add on above item no.1.12.1 for B.T. Road

1

1105

1105.65

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.1 50 to 75 mm 1.12.3 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.3 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

1136

568.1

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.2 80-110 mm 1.12.3 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.3 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

2

1209

604.9

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.3 125 to 165 mm 1.12.3 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.3 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

718

718.75

... More
1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.1.4 200 to 300 mm 1.12.3 1.12 Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. The rate includes all labour charges to complete the work for pipe size 1.12.1 In all type Soil 1.12.3 Add on above item no.1.12.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

1

1210

1210.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.