Public Health Engineering Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 13,703Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHCJO_438083_1Tender No
03/1/2024-25Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedwater.rajasthan.gov.in/phed
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1.1.1.1 : 50/63/75mm
-
255
-
... More
1.1.1.2 : 80/90mm
-
262
-
... More
1.1.1.3 : 100/110mm
-
299
-
... More
1.1.1.4 : 125/140mm
-
364
-
... More
1.1.1.5 : 150/160/180mm
-
381
-
... More
1.1.1.6 : 200/225mm
-
640
-
... More
1.1.2 : For Bitumen Road
-
-
-
... More
1.1.2.1 : 50/63/75mm
-
268
-
... More
1.1.2.2 : 80/90mm
-
275
-
... More
1.1.2.3 : 100/110mm
-
314
-
... More
1.1.2.4 : 125/140mm
-
382
-
... More
1.1.2.5 : 150/160/180mm
-
400
-
... More
1.1.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.1.3.1 : 50/63/75mm
-
293
-
... More
1.1.3.2 : 80/90mm
-
301
-
... More
1.1.3.3 : 100/110mm
-
344
-
... More
1.1.3.4 : 125/140mm
-
419
-
... More
1.1.3.5 : 150/160/180mm
-
438
-
... More
1.2 : Repairing of leakage in existing Distribution/ Rising Main /Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated trench / ipt / road shall be done properly i.e. after a layer of 20 cm with proper watering and ramming in layers, for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (required material such as pipe piece, CID Joints shall be provided by Department free of cost)
-
-
-
... More
1.2.1 : In all type soil
-
-
-
... More
1.2.1.2 : 100mm
-
334
-
... More
1.2.1.4 : 150mm
-
432
-
... More
1.2.1.5 : 200mm
-
656
-
... More
1.2.1.6 : 250mm
-
1032
-
... More
1.2.2 : For Bitumen Road
-
-
-
... More
1.2.2.2 : 100mm
-
351
-
... More
1.2.2.4 : 150mm
-
454
-
... More
1.2.2.5 : 200mm
-
689
-
... More
1.2.2.6 : 250mm
-
1084
-
... More
1.2.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.2.3.2 : 100mm
-
384
-
... More
1.2.3.4 : 150mm
-
497
-
... More
1.2.3.5 : 200mm
-
754
-
... More
1.2.3.6 : 250mm
-
1187
-
... More
1.4 : Replacement of CI/ DI Double flange sluice valve, non return valves, butter fly valves etc. in existing Distribution/ Rising Main/ Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e. after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
-
-
-
... More
1.4.1 : In all type Soil
-
-
-
... More
1.4.1.1 : 80mm
-
534
-
... More
1.4.1.2 : 100mm
-
578
-
... More
1.4.1.3 : 125mm
-
650
-
... More
1.4.1.4 : 150mm
-
774
-
... More
1.4.1.5 : 200mm
-
901
-
... More
1.4.2 : For Bitumen Road
-
-
-
... More
1.4.2.1 : 80mm
-
561
-
... More
1.4.2.2 : 100mm
-
607
-
... More
1.4.2.3 : 125mm
-
683
-
... More
1.4.2.4 : 150mm
-
813
-
... More
1.4.2.5 : 200mm
-
946
-
... More
1.4.2.6 : 250mm
-
1324
-
... More
1.4.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.4.3.1 : 80mm
-
614
-
... More
1.4.3.2 : 100mm
-
665
-
... More
1.4.3.3 : 125mm
-
748
-
... More
1.5 : Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/ Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e. after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) as per satisfaction of EIC. Rater for per pit.
-
-
-
... More
1.5.1 : In all type Soil
-
-
-
... More
1.5.1.1 : 75mm
-
310
-
... More
1.5.1.2 : 90/80mm
-
317
-
... More
1.5.1.3 : 110/100mm
-
354
-
... More
1.5.1.4 : 140/125mm
-
419
-
... More
1.5.1.5 : 180/160/150mm
-
436
-
... More
1.5.2 : For Bitumen Road
-
-
-
... More
1.5.2.1 : 75mm
-
326
-
... More
1.5.2.2 : 90/80mm
-
333
-
... More
1.5.2.3 : 110/100mm
-
372
-
... More
1.5.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.5.3.1 : 75mm
-
357
-
... More
1.5.3.2 : 90/80mm
-
365
-
... More
1.5.3.3 : 110/100mm
-
407
-
... More
1.6 : Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/ Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e. after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) as per satisfaction of EIC. Rater for per pit.
-
-
-
... More
1.6.1 : In all type Soil
-
-
-
... More
1.6.1.1 : 80mm
-
334
-
... More
1.6.1.2 : 100mm
-
372
-
... More
1.6.1.3 : 125mm
-
436
-
... More
1.6.1.4 : 150mm
-
436
-
... More
1.6.1.5 : 225/200mm
-
969
-
... More
1.6.1.6 : 250mm
-
1042
-
... More
1.6.2 : For Bitumen Road
-
-
-
... More
1.6.2.1 : 80mm
-
351
-
... More
1.6.2.2 : 100mm
-
391
-
... More
1.6.2.3 : 125mm
-
458
-
... More
1.6.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.6.3.1 : 80mm
-
384
-
... More
1.6.3.2 : 100mm
-
428
-
... More
1.6.3.3 : 125mm
-
501
-
... More
1.6.3.4 : 150mm
-
501
-
... More
1.8 : Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properlty i.e. after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
-
-
-
... More
1.8.1 : In all type Soil
-
-
-
... More
1.8.1.1 : 80mm dia pipe to 100mm
-
327
-
... More
1.8.1.2 : 125mm dia pipe to 150mm
-
392
-
... More
1.8.1.3 : 200mm dia pipe to 250mm
-
632
-
... More
1.8.2 : For Bitumen Road
-
-
-
... More
1.8.2.1 : 80mm dia pipe to 100mm
-
343
-
... More
1.8.2.2 : 125mm dia pipe to 150mm
-
412
-
... More
1.8.2.3 : 200mm dia pipe to 250mm
-
664
-
... More
1.8.3 : For C.C. Road Pit in CC Road shall be cut in optimum size through CC cutter Machine only.
-
-
-
... More
1.8.3.1 : 80mm dia pipe to 100mm
-
376
-
... More
1.8.3.2 : 125mm dia pipe to 150mm
-
451
-
... More
1.8.3.3 : 200mm dia pipe to 250mm
-
727
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%