Public Health Engineering Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 16,000Document Cost
₹ 1,000Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PHCJA_460433_1Bid Award Id
ViewTender No
EE PHED DIVISION TONK WORKS NIT NO 29/2025-26Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Add on above item no. 8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20 %
-
-
-
... More
Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20%
-
-
-
... More
200 mm dia pipe to 250mm
1
632
632
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
-
-
-
... More
225/200 mm
1
915
915
... More
200mm
1
656
656
... More
150/160/180mm
1
381
381
... More
Add on above no. 3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20%
-
-
-
... More
Add on above item no.10 for B.T. Road 5%
-
-
-
... More
Add on above item no. 4 for CC Road 10%
-
-
-
... More
90/80 mm
1
317
317
... More
100 mm
1
578
578
... More
Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20 %
-
-
-
... More
Add on above item no. 5 if depth of pipe line is above 3.0 mtr.30%
-
-
-
... More
125/140mm
1
249
249
... More
180/160/150 mm
1
436
436
... More
In all type Soil AC/PVC/HDPE pipe
-
-
-
... More
80 mm to 110 mm
1
1383
1383
... More
80 mm
1
334
334
... More
100/110mm
1
221
221
... More
125 mm
1
650
650
... More
Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20%
-
-
-
... More
150 mm
1
774
774
... More
50 to 75 mm
1
420
420
... More
In all type Soil
-
-
-
... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
1
1065
1065.63
... More
140/125 mm
1
419
419
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)
-
-
-
... More
Add on above no. 1 item if depth of pipeline is above 3.0 mtr 30%.
-
-
-
... More
Add on above item no. 3 for B.T. Road 5%
-
-
-
... More
In all type Soil
-
-
-
... More
80/90mm
1
262
262
... More
80 mm to 100 mm
1
1582
1582.63
... More
150mm
1
432
432
... More
Add on above item no. 3 for C.C. Road 10%
-
-
-
... More
Add on above item 1.13 for B.T. Road 5%
-
-
-
... More
Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 20%
-
-
-
... More
In all type Soil
-
-
-
... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)
-
-
-
... More
Add on above item no. 8 for B.T. Road 5%
-
-
-
... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
-
-
-
... More
Add on above item no.10 for CC Road 10%
-
-
-
... More
Add on above item no.1.5 for CC Road 10%
-
-
-
... More
80 mm dia pipe to 100mm
1
327
327
... More
50/63/75mm
1
181
181
... More
Add on above item no. 1.6 for CC Road 10%
-
-
-
... More
Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20 %
-
-
-
... More
225/200 mm
1
969
969
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
1
254
254
... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
-
-
-
... More
80 mm
1
534
534
... More
125 to 150 mm
1
546
546
... More
Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20 %
-
-
-
... More
Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required 30 %
-
-
-
... More
125 to 165 mm
1
529
529
... More
200/225mm
1
640
640
... More
110/100 mm
1
354
354
... More
Add on above item no. 1 for B.T. Road 5%
-
-
-
... More
200 mm
1
901
901
... More
100mm
1
334
334
... More
Add on above item no. 1.13 for CC Road 10%
-
-
-
... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)
-
-
-
... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
-
-
-
... More
In all type Soil
-
-
-
... More
200 mm to 300 mm
1
2368
2368
... More
Add on above item no. 9 for CC Road 10%
-
-
-
... More
100/110mm
1
299
299
... More
125/140mm
1
364
364
... More
In all type Soil
-
-
-
... More
Labour charges for removal of complaint of polluted water supply to the consumers
-
-
-
... More
Add on above item no. 7 for B.T. Road 5%
-
-
-
... More
50/63/75mm
1
255
255
... More
150 mm
1
436
436
... More
In all type Soil
-
-
-
... More
In all type Soil
-
-
-
... More
Add on above item no. 1.4 if depth of pipe line is above 1.5 mtr to 3.0 mtr 20%
-
-
-
... More
100 mm
1
372
372
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
-
-
-
... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.
1
680
680.63
... More
In all type Soil
-
-
-
... More
Add on above item no. 1 for C.C. Road 10%
-
-
-
... More
125 mm dia pipe to 150mm
1
392
392.5
... More
200/225mm
1
334
334
... More
Annual Rate Contract Pipe line Leakage and Maintenance work in RWSS Dooni, RWSS Anwa, and RWSS Nagarfort Under UWSS Deoli District Tonk
-
-
-
... More
80-110 mm
1
445
445
... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.
1
254
254
... More
80/90mm
1
186
186
... More
Add on above no. 3 item if depth of pipeline is above 3.0 mtr. 30%
-
-
-
... More
125mm
1
360
360
... More
125 mm
1
436
436
... More
Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20 %
-
-
-
... More
Add on above item no. 8 for CC Road 10 %
-
-
-
... More
In all type Soil
-
-
-
... More
Add on above item no. 7 for B.T. Road 5%
-
-
-
... More
150/160/180mm
1
249
249
... More
200 to 300 mm
1
963
963
... More
Add on above item 1.13 for B.T. Road 5%
-
-
-
... More
Add on above item no. 2 for B.T. Road 5%
-
-
-
... More
Add on above item no. 2 for C.C. Road 10%
-
-
-
... More
200 to 300 mm
1
909
909
... More
Add on above item no. 1.13 for CC Road 10 %
-
-
-
... More
Add on above item no. 6 for B.T. Road 5%
-
-
-
... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
-
-
-
... More
Add on above item no. 7 for CC Road 10%
-
-
-
... More
Add on above no. 2 item if depth of pipeline is above 3.0 mtr. 30%
-
-
-
... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)
-
-
-
... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size
-
-
-
... More
Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20%
-
-
-
... More
80-100 mm
1
463
463
... More
In all tupe soil
-
-
-
... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours
1
715
715
... More
Add on above item no. 9 for B.T. Road 5 %
-
-
-
... More
125 mm to 150 mm
1
1920
1920.19
... More
Add on above item no. 5 for B.T. Road 5%
-
-
-
... More
Add on above item no. 7 for CC Road 10%
-
-
-
... More
75 mm
1
310
310
... More
Add on above item no. 6 if depth of pipe line is above 3.0 mtr 30%
-
-
-
... More
Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20 %
-
-
-
... More
80mm
1
296
296
... More
Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20%
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements