If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date12 Mar 2024
Closing Date14 Mar 2024
Tender Amount₹ 5,00,000 
Notes
Download

Costs

  • EMD

    ₹ 10,000
  • Document Cost

    ₹ 200
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.5.1.3 110/100 mm

1

354

354

... More
1.5.1.4 140/125 mm

1

419

419

... More
1.5.1.5 180/160/150 mm

1

436

436

... More
1.5.1.6 225/200 mm

1

915

915

... More
1.5.1.7 250 mm

1

989

989

... More
1.5.1.8 300 mm

1

1044

1044

... More
1.5.2 Add on above item no. 5 for B.T. Road

1

-

0.05

... More
1.5.3 Add on above item no. 5 for CC Road

1

-

0.1

... More
1.5.4 Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
1.5.5 Add on above item no. 5 if depth of pipe line is above 3.0 mtr.

1

-

0.3

... More
PHED BSR O & M 2021_1.6 Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution /Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. 1.6.1 In all type Soil

1

1

1

... More
1.6.1.1 80 mm

1

334

334

... More
1.6.1.2 100 mm

1

372

372

... More
1.6.1.3 125 mm

1

436

436

... More
1.6.1.4 150 mm

1

436

436

... More
1.6.1.5 225/200 mm

1

969

969

... More
250 mm

1

1042

1042

... More
300 mm

1

1097

1097

... More
Add on above item no. 6 for B.T. Road

1

-

0.05

... More
Add on above item no. 6 for CC Road

1

-

0.1

... More
Add on above item no. 6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr.

1

-

0.2

... More
Add on above item no. 6 if depth of pipe line is above 3.0 mtr

1

-

0.3

... More
PHED BSR O & M 2021_1.7 Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.

1

254

254

... More
Add on above item no. 7 for B.T. Road

1

-

0.05

... More
Add on above item no. 7 for CC Road

1

-

0.1

... More
Add on above item no. 7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
PHED O&M BSR 2021 1.10 Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil

1

1

1

... More
80 mm to 100 mm

1

1583

1583

... More
125 mm to 150 mm

1

1920

1920

... More
200 mm to 300 mm

1

2529

2529

... More
350 mm to 450 mm

1

2739

2739

... More
500 mm to 600 mm

1

3389

3389

... More
Add on above item no.10 for B.T. Road

1

-

0.05

... More
Add on above item no.10 for CC Road

1

-

0.1

... More
Add on above item no.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
PHED BSR 2021 O & M 1.9 Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

1

1

1

... More
80 mm to 110 mm

1

1383

1383

... More
125 mm to 165 mm

1

1821

1821

... More
200 mm to 300 mm

1

2368

2368

... More
Add on above item no. 9 for B.T. Road

1

-

0.05

... More
Add on above item no. 9 for CC Road

1

-

0.1

... More
Add on above item no.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
PHED BSR 2022 4.1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.: All kinds of soil Add extra for trenches for every additional lift over item no 4.1

1

1

1

... More
Above 1.5 mtr and up to 3.0 mtr.

1

20

20

... More
Above 3.0 mtr and up to 4.5 mtr.

1

41

41

... More
PHED BSR 2022 4.5 Dismantling of cement concrete pavement for pipe line line and chambers by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks as per technical specification and scope of work.

1

756

756

... More
PHED BSR 2022 4.6 Dismantling of flexible pavement for pipe line line and chambers by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters. Measurement for dismantled trench to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, re-handling of material/earth to complete the tasks per technical specification and scope of work.

1

1

1

... More
Bituminous courses

1

416

416

... More
Granular courses

1

296

296

... More
PHED BSR 2022 4.7 Providing and laying in position cement concrete M10 grade nominal mix 1:3:6 (1 Cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size) in base course complete including all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, complete work as per technical specification and scope of work.

1

4797

4797

... More
PHED BSR 2022 4.8 Providing and laying in position cement concrete in specified grade over prepared base course complete including finishing, curing, all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, complete work as per technical specification and scope of work.

1

1

1

... More
M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).

1

6507

6507

... More
Plain cement concrete pavement of M-30 Grade

1

6874

6874

... More
PHED BSR 2022 4.9 Removing & Re-fixing of Precast concrete interlocking blocks for laying of pipe line by manual method, stacking of serviceable & non serviceable material separately, disposal of dismantled material lead up to 50 mtr. The C.C. interlocking paving blocks be laid on average 25 mm thick bed of coarse sand and the joints to be filled with fine sand. Laying procedure on compacted sub base as defined. Complete job is to be executed as per the directions of Engineer in charge. The rates to be inclusive of fixing of minimum 70 percent reusable precast concrete interlocking block and cost of required new precast concrete interlocking block against damaged, including all lead and lift as per Technical specifications. (Interlocking block manufactured by fully computerized automatic stationery hydraulic vibro pressed machine & full computerized automatic batching plant of class A-1 as per BS:6717-2001. Tensile splitting strength and breaking load as per BS: 6717-2001 Colour: Grey cement natural colour. Variation in Dimension : Less than 1.6 mm Variation in thickness: Less than 3.2 mm)

1

1

1

... More
60 mm thick.

1

283

283

... More
80 mm thick.

1

308

308

... More
100 mm thick

1

343

343

... More
PHED BSR 2022 1.11 Providing and fixing of flanged/ plain ended MS Specials made from MS sheet strips of relevant IS specification of approved thickness by welding, lowering, laying, aligning, fixing in position at all level/depths in trenches complete including all taxes, material, labour, inside lining, outside coating, testing and commissioning along with pipe line as per technical specifications and direction of Engineer in-charge.

1

1

1

... More
MS pipe specials up to 600mm dia (with minimum 5mm thickness sheet)

1

129

129

... More
PHED O & M BSR 2021 1.4 Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) 1.4.1 In all type Soil

1

1

1

... More
1.4.1.1 80 mm

1

534

534

... More
1.4.1.2 100 mm

1

578

578

... More
1.4.1.3 125 mm

1

650

650

... More
1.4.1.4 150 mm

1

774

774

... More
1.4.1.5 200 mm

1

901

901

... More
1.4.1.6 250 mm

1

1261

1261

... More
1.4.1.7 300 mm

1

1559

1559

... More
1.4.1.8 350 mm

1

1989

1989

... More
1.4.1.9 400 mm

1

2356

2356

... More
1.4.2 Add on above item no. 4 for B.T. Road

1

-

0.05

... More
1.4.3Add on above item no. 4 for CC Road

1

-

0.1

... More
1.4.4 Add on above item no. 4 if depth of pipe line is above 1.5 mtr to 3.0 mtr

1

-

0.2

... More
1.4.5 Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required

1

-

0.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.