Public Health Engineering Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Eprocure
Opening Date4 Oct 2024
Closing Date11 Oct 2024
Tender Amount₹ 4,50,000 
Notes
Download

Costs

  • EMD

    ₹ 9,000
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Summary

Nit 03/2024-25 (work Of Repairing Of Leakage In Different Size Pipe Line And Removing Of Illegal Connection At Uwss Scheme In Section Mahwa Under Sub Div. Mahwa )

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80/90mm

1

262

262

... More
100/110mm

1

299

299

... More
125/140mm

1

364

364

... More
150/160/180mm

1

381

381

... More
200/225mm

1

640

640

... More
250/280mm

1

640

640

... More
300/315mm

1

851

851

... More
350mm

1

1123

1123

... More
500mm

1

1178

1178

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80mm

1

296

296

... More
100mm

1

334

334

... More
125mm

1

360

360

... More
150mm

1

432

432

... More
200mm

1

432

432

... More
250mm

1

432

432

... More
300mm

1

1032

1032

... More
350mm

1

1277

1277

... More
400mm

1

1442

1442

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
50/63/75mm

1

181

181

... More
80/90mm

1

186

186

... More
100/110mm

1

221

221

... More
125/140mm

1

249

249

... More
150/160/180mm

1

249

249

... More
200/225mm

1

334

334

... More
250/280mm

1

611

611

... More
300/315mm

1

729

729

... More
350mm

1

833

833

... More
400mm

1

950

950

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm

1

534

534

... More
100 mm

1

578

578

... More
125 mm

1

650

650

... More
150 mm

1

774

774

... More
200 mm

1

774

774

... More
250 mm

1

774

774

... More
300 mm

1

1559

1559

... More
350 mm

1

1989

1989

... More
400 mm

1

2356

2356

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC.

-

-

-

... More
In all type Soil

-

-

-

... More
75 mm

1

310

310

... More
90/80 mm

1

317

317

... More
110/100 mm

1

354

354

... More
140/125 mm

1

419

419

... More
180/160/150 mm

1

436

436

... More
225/200 mm

1

915

915

... More
250 mm

1

989

989

... More
300 mm

1

1044

1044

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC.

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm

1

334

334

... More
100 mm

1

372

372

... More
125 mm

1

436

436

... More
150 mm

1

436

436

... More
225/200 mm

1

969

969

... More
250 mm

1

1042

1042

... More
300 mm

1

1097

1097

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add 30% on above no. item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.

1

254

254

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm dia pipe to 100mm

1

327

327

... More
125 mm dia pipe to 150mm

1

393

393

... More
200 mm dia pipe to 250mm

1

632

632

... More
300 mm dia pipe to 350mm

1

1155

1155

... More
400 mm

1

1628

1628

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 110 mm

1

1383

1383

... More
125 mm to 165 mm

1

1821

1821

... More
200 mm to 300 mm

1

2368

2368

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 100 mm

1

1583

1583

... More
125 mm to 150 mm

1

1920

1920

... More
200 mm to 300 mm

1

2529

2529

... More
350 mm to 450 mm

1

2739

2739

... More
500 mm to 600 mm

1

3389

3389

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Labour charges for removal of complaint of polluted water supply to the consumers

-

-

-

... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours

1

715

715

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
50 to 75 mm

1

420

420

... More
80-110 mm

1

445

445

... More
125 to 165 mm

1

529

529

... More
200 to 300 mm

1

909

909

... More
350 to 450 mm

1

1260

1260

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
80-100 mm

1

463

463

... More
125 to 150 mm

1

546

546

... More
200 to 300 mm

1

963

963

... More
350 to 450 mm

1

1298

1298

... More
Add 5% on above item no. for B.T. Road

-

-

-

... More
Add 10% on above item no. for C.C. Road

-

-

-

... More
Add 20% on above no. item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

681

681

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

1066

1066



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.