Public Health Engineering Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date5 Mar 2025
Closing Date17 Mar 2025
Tender Amount₹ 10,00,000 
Notes
Download

Costs

  • EMD

    ₹ 20,000
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Summary

Pipe Line Leakage And Inter Connection Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80/90mm

-

283

283

... More
100/110mm

-

328

328

... More
125/140mm

-

396

396

... More
150/160/180mm

-

413

413

... More
200/225mm

-

672

672

... More
250/280mm

-

899

899

... More
300/315mm

-

899

899

-

1186

1186

... More
400 mm

-

1241

1241

... More
Add on above item no. 2 for B.T. Road

-

-

-

... More
Add on above item no. 2 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above no. 2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add on above no. 2 item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

-

317

317

... More
100 mm

-

363

363

... More
125 mm

-

392

392

... More
150 mm

-

464

464

... More
200 mm

-

688

688

... More
250 mm

-

1080

1080

... More
300 mm

-

1080

1080

... More
350 mm

-

1341

1341

... More
400 mm

-

1506

1506

... More
450 mm

-

2606

2606

... More
500 mm

-

3397

3397

... More
600 mm

-

3645

3645

... More
1000 mm

-

5741

5741

... More
Add on above item no. 8 for B.T. Road

-

-

-

... More
Add on above item no.8 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above no. 8 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add on above no. 8 item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
50/63/75mm

-

194

194

... More
80/90mm

-

200

200

... More
100/110mm

-

248

248

... More
125/140mm

-

276

276

... More
150/160/180mm

-

276

276

... More
200/225mm

-

367

367

... More
250/280mm

-

644

644

... More
300/315mm

-

782

782

-

886

886

-

1003

1003

... More
450 mm

-

1223

1223

... More
500 mm

-

1313

1313

... More
600 mm

-

1368

1368

... More
Add on above item no.14 for B.T. Road

-

-

-

... More
Add on above item no. 14 for C.C. Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above no. 14 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add on above no. 14 item if depth of pipeline is above 3.0 mtr.

-

-

-

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

-

577

577

... More
100 mm

-

621

621

... More
125 mm

-

693

693

... More
150 mm

-

822

822

... More
200 mm

-

949

949

... More
250 mm

-

1326

1326

... More
300 mm

-

1624

1624

... More
350 mm

-

2054

2054

... More
400 mm

-

2434

2434

... More
450 mm

-

2576

2576

... More
500 mm

-

3023

3023

... More
600 mm

-

3374

3374

... More
Add on above item no. 1.4.1 for B.T. Road

-

-

-

... More
Add on above item no. 1.4.1 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr

-

-

-

... More
Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

-

329

329

... More
90/80 mm

-

338

338

... More
110/100 mm

-

383

383

... More
140/125 mm

-

451

451

... More
180/160/150 mm

-

468

468

... More
225/200 mm

-

947

947

... More
250 mm

-

1037

1037

... More
300 mm

-

1092

1092

... More
Add on above item no. 26 for B.T. Road

-

-

-

... More
Add on above item no.26 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no. 26 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

-

-

-

... More
Add on above item no. 26 if depth of pipe line is above 3.0 mtr.

-

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

-

355

355

... More
100 mm

-

400

400

... More
125 mm

-

468

468

... More
150 mm

-

468

468

... More
225/200 mm

-

1001

1001

... More
250 mm

-

1090

1090

... More
300 mm

-

1145

1145

... More
Add on above item no.32 for B.T. Road

-

-

-

... More
Add on above item no. 32 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no. 32 if depth of pipe line is above 1.5 mtr up to 3.0 mtr.

-

-

-

... More
Add on above item no.32 if depth of pipe line is above 3.0 mtr

-

-

-

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour.

-

320

320

... More
Add on above item no. 37 for B.T. Road

-

-

-

... More
Add on above item no. 37 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no. 37 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 110 mm

-

1472

1472

... More
125 mm to 165 mm

-

1954

1954

... More
200 mm to 300 mm

-

2545

2545

... More
Add on above item no. 42 for B.T. Road

-

-

-

... More
Add on above item no. 42 for CC Road.Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no.42 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 100 mm

-

1671

1671.4

... More
125 mm to 150 mm

-

2053

2053.34

... More
200 mm to 300 mm

-

2706

2706.85

... More
350 mm to 450 mm

-

2916

2916.54

... More
Add on above item no.47 for B.T. Road

-

-

-

... More
Add on above item no.47 for CC Road. Pit in CC Road shall be cut in optimum size through CC cutter Machine only.

-

-

-

... More
Add on above item no.47 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

-

-

-

... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. (minimum200mm depth)

-

681

681

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

-

1066

1066

... More
Providing and laying in position cement concrete M10 grade nominal mix 1:3:6 (1 Cement : 3coarse sand : 6 graded stone aggregate 40 mm nominal size) in base course complete including all material, labour, machinery, lighting, guarding for road restoration work in trenches of pipe line and chamber work. Measurement for CC work to be made as per standard trench width specified in tender document and no extra payment shall be made be made for trench width more than specified, complete work as per technical specification and scope of work.

-

4797

4797



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.