Public Health Engineering Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date13 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 6,00,000 
Notes
Download

Costs

  • EMD

    ₹ 12,000
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
80/90mm

1

309

309

... More
100/110mm

1

359

359

... More
125/140mm

1

441

441

... More
150/160/180mm

1

467

467

... More
200/225mm

1

749

749

... More
250/280mm

1

987

987

... More
300/315mm

1

1009

1009

... More
350mm

1

1301

1301

... More
400mm

1

1356

1356

... More
Add on above item no. 1.1 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.1 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above no. 1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Add on above no. 1.1 item if depth of pipeline is above 3.0 mtr.

1

-

0.3

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80mm

1

356

356

... More
100mm

1

406

406

... More
125mm

1

447

447

... More
150mm

1

528

528

... More
200mm

1

731

731

... More
250mm

1

1143

1143

... More
300mm

1

1178

1178

... More
350mm

1

1439

1439

... More
400mm

1

1692

1692

... More
Add on above item no. 1.2 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.2 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above no. 1.2 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Add on above no. 1.2 item if depth of pipeline is above 3.0 mtr.

1

-

0.3

... More
Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
50/63/75mm

1

214

214

... More
80/90mm

1

221

221

... More
100/110mm

1

290

290

... More
125/140mm

1

318

318

... More
150/160/180mm

1

327

327

... More
200/225mm

1

423

423

... More
250/280mm

1

722

722

... More
300/315mm

1

873

873

... More
350mm

1

972

972

... More
400mm

1

1088

1088

... More
Add on above item no. 1.3 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.3 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above no. 1.3 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Add on above no. 1.3 item if depth of pipeline is above 3.0 mtr.

1

-

0.3

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm

1

617

617

... More
100 mm

1

661

661

... More
125 mm

1

738

738

... More
150 mm

1

870

870

... More
200 mm

1

1010

1010

... More
250 mm

1

1423

1423

... More
300 mm

1

1697

1697

... More
350 mm

1

2125

2125

... More
400 mm

1

2514

2514

... More
Add on above item no. 1.4 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.4 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.4 if depth of pipe line is above 1.5 mtr to 3.0 mtr

1

-

0.2

... More
Deduct on above item no. 1.4 if valve is fixed at plinth level / platform i.e. no excavation is required

1

-

0.2

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

... More
75 mm

1

353

353

... More
90/80 mm

1

364

364

... More
110/100 mm

1

427

427

... More
140/125 mm

1

496

496

... More
180/160/150 mm

1

549

549

... More
225/200 mm

1

1028

1028

... More
250 mm

1

1128

1128

... More
300 mm

1

1183

1183

... More
Add on above item no. 1.5 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.5 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Add on above item no. 1.5 if depth of pipe line is above 3.0 mtr.

1

-

0.3

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm

1

394

394

... More
100 mm

1

479

479

... More
125 mm

1

494

494

... More
150 mm

1

549

549

... More
225/200 mm

1

1062

1062

... More
250 mm

1

1235

1235

... More
300 mm

1

1290

1290

... More
Add on above item no. 1.6 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.6 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr.

1

-

0.2

... More
Add on above item no. 1.6 if depth of pipe line is above 3.0 mtr

1

-

0.3

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.

1

402

402

... More
Add on above item no. 1.7 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.7 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm dia pipe to 100mm

1

399

399

... More
125 mm dia pipe to 150mm

1

468

468.5

... More
200 mm dia pipe to 250mm

1

726

726.5

... More
300 mm dia pipe to 350mm

1

1264

1264

... More
400mm

1

1758

1758

... More
Add on above item no. 1.8 for B.T. Road

1

-

0.05

... More
Add on above item no.1. 8 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 110 mm

1

1532

1532

... More
125 mm to 165 mm

1

2043

2043

... More
200 mm to 300 mm

1

2665

2665

... More
Add on above item no. 1.9 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.9 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).

-

-

-

... More
In all type Soil

-

-

-

... More
80 mm to 100 mm

1

1731

1731

... More
125 mm to 150 mm

1

2143

2143

... More
200 mm to 300 mm

1

2826

2826

... More
350 mm to 450 mm

1

3036

3036

... More
500 mm to 600 mm

1

3603

3603

... More
Add on above item no. 1.10 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.10for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr

1

-

0.2

... More
Labour charges for removal of complaint of polluted water supply to the consumers

-

-

-

... More
Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours

1

715

715

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
50 to 75 mm

1

452

452

... More
80-110 mm

1

488

488

... More
125 to 165 mm

1

582

582

... More
200 to 300 mm

1

981

981

... More
350 to 400 mm

1

1367

1367

... More
Add on above item no.1.12 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.12 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no. 1.12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size

-

-

-

... More
In all type Soil

-

-

-

... More
80-100 mm

1

505

505

... More
125 to 150 mm

1

599

599

... More
200 to 300 mm

1

1034

1034

... More
350 to 400 mm

1

1405

1405

... More
Add on above item 1.13 for B.T. Road

1

-

0.05

... More
Add on above item no. 1.13 for C.C. Road . Pit in CC Road shall be cut in optimum size through CC cutter machine only.

1

-

0.15

... More
Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.

1

-

0.2

... More
Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal & tack coat as per site condition by using ready cold mix up to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

681

681

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

1066

1066

... More
Replacing pipes / pipe piece - removing leakages from CI Pipe Line with care by excavating trench to required length and depth with dewatering and filling of trenches with earth up to original level after testing the system. This includes the earth work in excavation in saturated soil up to a depth of 0.30 m ( 1 ft ) including pumping of water etc complete as per specifications. Also this includes the extra for earth work in excavation in saturated soil for every 25 cm depth of part thereof over 0.30 m depth including pumping or bailing out of water, labour charges for dewatering, carriage ( Loading / Unloading ) of pipe and other jointing materials etc from store of Junior Engineer concern to required site, cutting of pipes and making CI Det joints in all respect for ( Rates are inclusive of earth work and exclusive of WBM / Chap / Cement Concrete / Bituminous road cutting )

-

-

-

... More
CI Pressure Pipe Line ( 450 mm)

-

-

-

... More
For Length up to 1.0 m

1

1113

1113

... More
For Length up to 2.0 m

1

2226

2226

... More
For Length up to 3.0 m

1

3339

3339

... More
Providing and fixing of flanged/ plain ended MS Specials made from MS sheet strips of relevant IS specification of approved thickness by welding, lowering, laying, aligning, fixing in position at all level/depths in trenches complete including all taxes, material, labour, inside lining, outside coating testing and commissioning along with pipe line as per technical specifications and direction of Engineer in-charge.

-

-

-

... More
MS pipe specials up to 600mm dia (with minimum 5mm thickness sheet)

1

126

126

... More
Welding on M.S. / G.I. Pipes and other material by Electric Welding, this includes all the material like welding rods/ equipment like welding machine/ generator, if required for job.

-

-

-

... More
On Site

1

2

2

... More
G. Total

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.