Nuclear Power Corporation Of India Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Nuclear Power Corporation Of India Limited - NPCIL Tender

Machinery and Tools
GEM
Opening Date26 Nov 2024
Closing Date17 Dec 2024
Tender Amount₹ 67,62,504 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Major Preventive Maintenance PM 1 Water Purifier Cum Water CoolersIncluding Spares And Consumables Total Quantity 1 Is Equal To 50 For Two Years;Service P.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Major Preventive Maintenance PM 1 Refrigerators By Deep Freezer By BottleCoolers Including Spares And Consumables Total Quantity 1 Is Equal To 32 For Each ..( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Major Preventive Maintenance PM 1 Desert Cooler Total Quantity 1 Is EqualTo 400 For Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Major Preventive Maintenance PM 1 3 Phase Desert Cooler Including SparesAnd Consumables Total Quantity 1 Is Equal To 20 For Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Of Air Conditioner Window Type 1 Point5 TR By 2 Point 0 TR Including Spares And Consumables Total Quantity 1 Is Equal To..( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Split Air Conditioner 1 Point 5 TR By 2Point 0 TR Including Spares And Consumables Total Quantity 1 Is Equal To 420 For.. (1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Package AC Including Spares AndConsumables Total Quantity 1 Is Equal To 48 For Of Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Water Purifier Cum Water CoolersIncluding Spares And Consumables Total Quantity 1 Is Equal To 550 For Two Years;Service .. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Refrigerators By Deep Freezer By BottleCoolers Including Spares And Consumables Total Quantity 1 Is Equal To 96 For TwoYe.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 Desert Coolers Including Spares AndConsumables Total Quantity 1 Is Equal To 400 For Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Minor Preventive Maintenance PM 2 3 Phase Desert Cooler Including SparesAnd Consumables Total Quantity 1 Is Equal To 60 For Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Installation By Removal And Shifting Of AC Window Type Water CoolerRefrigerator Deep Freezer Desert Cooler Etc To New Location Total Quantity 1 Is Equal.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Installation By Removal And Shifting Of AC Split Type To New Location TotalQuantity 1 Is Equal To 30 For Two Years; Service Provider ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Supply And Replacement Of Compressors For 1 Point 5 Ton By 2 Ton WindowAc Or Split Ac Or Refrigerators As Per Requirement Total Quantity 1 Is Equal To 40Fo.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Supply And Charging Of Refrigerant Gas R 22 By R 32 By R 134A By R 407CFor Charging In Window By Split Ac Water Cooler Refrigerators As Per RequirementEtc.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Supply And Replacement Of Condenser Fan Motor By Blower Motor ByFreezer Motor By Desert Cooler Fan Motor By Split Ac Indoor Motors Etc As PerRequirement T.. ( 1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; Supply And Replacement Thermal Insulation By Copper Tube 5 By 8 Inch 3 By8 Inch By 1 By 2 Inch By 1 By 4 Inch On Split Ac Cooling Tubes As Per Requirement .. (1 )

1

-

-

... More
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - RRSite 12; To Carryout Miscellaneous Nature Of Work Within Normal Working 8 Hrs IeScrap Material Loading Unloading Shifting Housekeeping Of Shop New EquipmentDrawl Fr.. ( 1 )

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.