North Western Railway Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

North Western Railway - NWR Tender

Works
Civil And Construction
Excavation
Ireps
Opening Date9 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 13,78,779.37 
Notes
Download

Costs

Summary

Ajmer Division-provision Of Ofc Communication Between Sdh And Mkra Ssp.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Placing of DWC HDPE/RCC/GI pipes along with collars in trenches at places near track and road, crossings, platform cuttings etc. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(Unit is RM running meter.)

-

-

4

... More
Horizontal Drilling by using manual pushing method at minimum depth of 1.5 meter 5 below the formation level of earth as per decision of Engineer in charge .Pipe Supply is not covered under this item Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution

50

122

6137

... More
Supply of galvanized cable markers as per Drg.No.CSTE/NWR/SOR/15. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply.

60

241

14476.8

... More
Transportation at site and Fixing of galvanized cable markers as per Drg.No.CSTE/NWR/SOR/15. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution

60

60

3619.2

... More
S u p p l y of earth electrode as per standard practice and as per Drg No.CSTE/NWR/SOR/14A & 14B. It includes supply o f GI pipe of 3m length. Inspection: Consignee Inspection Charges:None Payment Terms: 100% after Supply.

2

2232

4465.62

... More
Installation of earth electrode as per standard practice and connecting it to the equipments which are required to be earthed including digging of earth pit 3 mtr deep and fixing earth electrode pipe, casting of cement concrete enclosure with cover as per Drg 9 No.CSTE/NWR/SOR/14A & 14B. It includes installation of 7 strand GI wires as earth lead wires and soldering one end of earth lead wire to earth electrode and other end to block equipments, power equipments, cable sheath, signals etc. as per site requirement and as per instructions given by engineer incharge. Inspection: Consignee Inspection Charges:None Payment Terms: 100% after execution and testing.

2

558

1116.4

... More
Supply, preparation, splicing and installation of straight joint for 24 fibers along with 10 enclosures with heat shrinkable splice protection sleeve as per TEC Specn.G/OJC-02/01 March- 99 or latest. Splice losses in no case should be more than 0.1 dB. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution

2

12752

25504.4

... More
Supply of Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. RDSO/SPN/TC/45/2013 Rev. 2.0 or latest. The item also includes supply of all the accessories of HDPE 11 duct like end caps, collars, bends, couplers etc. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply

6

48313

289879.56

... More
Laying of Pre-lubricated HDPE duct, 40 mm OD, 33 ID as per RDSO specification No. 12 RDSO/SPN/TC/45/2013 Rev. 2.0 or latest. The item also includes installation of all the accessories of HDPE duct like end caps, collars, bends, couplers etc. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution.

6

12078

72469.86

... More
Blowing/drawing of OFC cables in the HDPE duct along with all the protective work as per instructions of engineer incharge at site. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution.

6

10804

64828.62

... More
Construction of brick chamber of optical fibre cable straight through joint as per Drg. 14 No. CSTE/NWR/ SOR/23. It also includes supply and provision of all the material required for this item like bricks, sand, cement etc. The cement and sand should be in ratio 1:6. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution.

3

5263

15791.61

... More
Supply of OFC single mode 6 fibre unarmoured cable. Make Molex/ AMP/Finolex or similar. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after supply.

7000

28

197750

... More
Supply of 8 port Gigabit Lite Managed PoE Layer 2 Switch supports 8 nos 16 10/100/1000BASE-T ports, along with 2 Gigabit SFP ports, green-saving technologies, make model DG-GS1510HPL DIGISOL / CISCO/JUNIPER or superior. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply.

2

27241

54483.2

... More
Supply, installation and complete wiring of optical fibre cable termination box for 6fibres complete with base housing, base mountings with fixing arrangement etc. & splicing of fibre with low loss of pigtail cables. Splice losses in no case should be more than 0.1 dB. Necessary 0dB connectors should be provided in OFC termination box. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution.

2

3347

6694.28

... More
Supply of SC/APC -LC/PC patch cord (5 meter) (3M, TE connectivity, R&M make or superior) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Supply.

10

146

1466.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.