Military Engineer Services Tender
... More
The MES has issued a formal invitation for competitive bids for the Military Engineer Services project, for Provn Of Roof Top Solar Plants Totaling 440 Kw At Certain Bldgs At Lalgarh Jattan Mil Stn Under Ge Lalgarh Jattan in Sri Ganganagar, Rajasthan, with an estimated contract value of Rs. 2,07,00,000. The bid opening date for this tender is 25-09-2026 and the last date for bid submission is 16-11-2026. Interested bidders for Military Engineer Services tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Military Engineer Services - MES Tender - Rajasthan Tender
Opening Date25 Sep 2026
Closing Date16 Nov 2026
Tender Amount₹ 2,07,00,000
Costs
EMD
₹ 2,82,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Provn Of Roof Top Solar Plants Totaling 440 Kw At Certain Bldgs At Lalgarh Jattan Mil Stn Under Ge Lalgarh Jattan
AI Insights
Unlock AI Insights for this Tender
Sign in to request AI-powered insights, eligibility criteria and automated analysis for this tender.
Contact
Tender Id
2026_MES_791236_1Tender No
84588 CA NO CE BTZ/LGJ/TOKEN-14 OF 2026-27Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Srl Item No 1 Continued......
(IV) The module frame or mounting array structure will be made of hot dip galvanised (Mild Steel) or Aluminium having angle of inclination to achieve the specified performance ratio, designed to withstand harsh climate conditions and wind speed not less than 150 Km / Hr or as per local conditions whichever is higher. The mounting structure shall be as per IS 2062 - 1992, galvanised material shall confirm to latest IS 4759. The fasteners used shall be made up of stainless steel and the minimum clearance of the structure from the roof level should be 300 mm, for RCC type roof. (V) The module shall be provided with a junction box with either provision of external screw terminal connection or sealed type and with arrangement for provision of by-pass diode. The box shall have hinged, weather proof lid with captive screws and cable gland entry points or may be of sealed type and IP65 rated and IEC 62208. (VI) BALANCE OF SYSTEM (BOS) ITEMS/ COMPONENTS: The BOS items/components of the SPV power plants/systems to be installed must conform to the latest edition of IEC or equivalent BIS Standards and Latest MNRE specifications as brought out here-in-after (VII) INVERTER/ PCU: Supply, Installation, Testing & commissioning Power Conditioning Unit (PCU) consisting of hybrid solar inverter electronic type, MPPT (Maximum Power Point Tracker) along with associated control and protective devices of suitable capacity for each Plant and having following specifications with remote monitoring system: (a) Ambient temp : 4°C to 60°C (b) Relative humidity : 0-95% non-condensing (c) Environmental condition: outdoor, Hot / wet location (d) Protection degree : IP-65 (e) Pollution degree : IV (f) Safety class: class I metal enclosure (g) Nominal output: 415 V, (h) Output Frequency: 50 Hz (i) Total Harmonic distortion shall be less than 3% (j) Power factor shall be more than 95% at any load /time.
-
-
-
... More
Srl Item No 1 Continued......
(k) Inverter Efficiency less than 93% (In case of 10 KW or above) and less than 90% (In case of less than 10 KW) (l) External communication: Built-in meter and data logger to monitor plant performance through external computer (m) Grid frequency Tolerance range +3 or more (n) No load losses less than 1% (o) Protection against DG set run & grid isolation (p) Protection features- Inverter should have following protections: (i) Islanding Protection (ii) Over voltage protection (iii) Over current protection (iv) Over temperature protection (v) Reverse polarity Protection (vi) Surge protection (vii) Short Circuit (viii) Frequency Note:- (a) Inverter/PCU shall be capable of synchronisation with grid supply and DG Set supply shall be capable of complete automatic operation including wake-up, synchronization & shutdown. The PCU/ Inverter shall be 3 Phase for plants of capacity 10 KW or more, and single Phase in case of capacity less than 10 KW. (b) The inverter shall be conforming to IEC 62109-1 Part 1 (Part 1: General requirements and Safety of power converters for use in photovoltaic power systems) and Part 2 (Part 2: Particular requirements for inverters. Safety compliance), IEC 60068-2 / IEC 62093 (Environmental Testing of PV System – Power Conditioners and Inverters) and other relevant IEC standards.
-
-
-
... More
Srl Item No 1 Continued......
(c) The combined wattage of all inverters should not be less than rated capacity of power plant under STC. (d) Maximum power point tracker shall be integrated in the PCU/inverter to maximize energy drawn from the array. (VIII) Data Acquisition system shall be shall be provided with each plant measure (a) Solar Irradiance an integrating sensor (Pyranometer) mounted in the plane of the array. (b) Wind Speed: An integrated wind speed measurement unit be provided (c) Temperature Sensor: Integrated temp sensors for measuring the module surface temp., inverter inside enclosure temperature and ambient temperature shall be provided. Note- SCADA system for monitoring of following data through web based application with cloud storage of minimum 6 months: (a) Solar irradiance (b) Wind speed, (c) Ambient temperature (d) Module surface temp (e) Generation data KWh (per inverter and cumulative) (f) Instantaneous generation in KW (Each invertor and cumulative) (g) Suitable HMI/Graphs depicting above data shall be readily available for a period through this application. Note: (i) Specification for Pyranometer, Surge arresting device and anemometer should be selected as per OEM recommendation. (IX) DC DISTRIBUTION BOARD: The DC DBs shall has MCBs/MCCBs for controlling DC Power output to the Inverter/ PCU with necessary Surge Protection Devices (SPDs). The Panel shall have IP 65 Degree of Protection and shall have Copper Busbars of suitable capacity.
-
-
-
... More
Srl Item No 1 Continued......
(X) AC DISTRIBUTION BOARD: The AC DBs shall has MCBs/MCCBs for controlling AC Power output from the Inverter/ PCU with necessary Surge Protection Devices (SPDs). The Panel shall have IP 65 Degree of Protection and shall have Copper Busbars of suitable capacity. (XI) Cables and wires (a) The cables and wires used for wiring shall be conforming to IEC-60227/ IS 694, IEC 60502-IS 1554 (b) For the DC cabling, XLPE insulated and sheathed, UV-stabilized single core flexible copper cables shall be used; Multi-core cables shall not be used. (c) For the AC cabling, XLPE insulated and PVC sheathed single or, multi-core flexible Aluminium cables shall be used; Outdoor AC cables shall have a UV-stabilized outer sheath. (d) The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0% (e)The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 1% (f)All DC and AC cables from the SPV module and Inverter shall run through a protective Rigid PVC conduit (g) Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors (MC4) and couplers. (h) All cable raceways shall be clamped to the rooftop, walls and ceilings with clamps at intervals not exceeding 50 cm (XII) Lightning protection- Each plant shall be provided with lightening arrestors conforming IEC 62305 standard for lightening and overvoltage protection due to lightening etc. along with necessary earthing.
-
-
-
... More
Srl Item No 1 Continued......
(XIII) EARTHING PROTECTION- Proper Earthing protection shall be provided for earthing each PV Array structure as IS 3043. Besides separate earthing shall be provided for Lightening Arrestors. Besides PCU, AC DBs and DC DBs shall also be properly earthed. Earth resistance of each earthing shall not be more 5 Ohms (XIV) METERING ARRANGEMENTS: A suitable Bi-directional electronic meters conforming to IS 16444 or as specified by the DISCOM shall be provided for net metering at each plant and recording parameters like KW, KWh, KVAR, voltage, current, PF etc. to determine efficiency and efficacy of the system. Besides a meter to record generation details of the solar plant shall also be provided with each plant.
-
-
-
... More
Operation including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1760 units (KWHr)/ day all as specified and directed for period of the first year of defects liability period. Note: - Spare parts including maintenance shall be included in the scope of this item during the first year of defect liability period and shall be done without any extra cost to the department. Scope of work: - (a) Operation shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant. (c) The scope of this item shall also include to train the MES personnel for operation and maintenance of Solar plant. (d) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (e) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (f) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants:- (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1747 units (KWHr)/ day all as specified and directed for period of the second year of defect liability period. Note: - Spare parts including maintenance shall be included in the scope of this item during the second year of defect liability period and shall be done without any extra cost to the department. Scope of work: - (a) Operation shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant. (c) The scope of this item shall also include to train the MES personnel for operation and maintenance of Solar plant. (d) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (e) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (f) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the third year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the fourth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the fifth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the sixth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the seventh year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the eighth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the ninth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-
... More
Operation and Comprehensive Maintenance including making good of all kind of defects by repair/replacement of required spare parts as the case may be, for the following solar plants: - (a) 440 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 1734 units (KWHr)/ day all as specified and directed for period of the tenth year after date of completion. Scope of work: (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly, replacement of spare parts, maintenance of plant including electrical equipment. (b) Checking Electrical Parameter of the installed power plant. (c) Minimum Performance ratio shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (d) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis. (e) The module cleaning must be done on fortnightly basis as per direction of the Engineer-in-Charge.
1
-
-

