If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Local Self Government Department - LSGD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 Aug 2024
Closing Date20 Aug 2024
Tender Amount₹ 50,00,000
Costs
EMD
₹ 1,00,000Document Cost
₹ 1,000Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DLB_412056_2Bid Award Id
ViewTender No
NIT 06/2024-25Tender Authority
Local Self Government Department ViewPurchaser Address
-Website
http://https://lsg.urban.rajasthan.gov.in/content/raj/udh/lsg-jaipur/en/home.html
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr.
1
384
384.5
... More
Sludge clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr.
1
411
411
... More
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth Rate for lead 5 km
1
254
254.76
... More
Scarifying existing granular road surface, including picking up scarified material and stacking of old serviceable material within a lead of 1000 meters complete as per clause 305.4.3 of MoRT&H specification including all labour, machinery, lighting, guarding and maintenance of diversion.
1
41
41.6
... More
Providing, laying, spreading and compacting of granular sub-base by providing close graded material (Table 400-1), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material
1
1157
1157
... More
Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion.
1
1775
1775
... More
Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
1
12
12
... More
Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
1
33
33.7
... More
Providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per Table 500-4, Grading-II for base/ binding course, loading of aggregate with F.E. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of MoRT&H specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat. With Bitumen VG-grade 30 @ 3.4% (percentage by weight of total mix)
1
2795
2795
... More
Providing and laying 30-45 mm compacted thickness Bituminous Concrete as per design mix (approved by Engineer) on prepared surface with specified grade stone aggregate as per Table - 500-18 with bitumen for wearing course including loading of aggregate with F.E. loader and hot mixing of stone aggregate and bitumen (including Cost of anti stripping compound Minimum 1% in Lime/Cement as per design wherever required) in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensing device (as per clause 504-3.5) to the required level and grade and compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa, to achieve the desired density complete as per clause 509 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding primer/tack coat. Grade-II with Bitumen VG-grade 30 @ 6% (percent by weight of total mix)
1
4360
4360
... More
Providing and laying marking of center line and stop line etc with hot thermoplastic compound 2.5 mm thick on road/ plain surface, including reflectorising glass beads @ 250 gms per sqm area with special applicator machine, as per IRC:35 including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control involved. The finished surface to be level, uniform and free from streaks and holes as per clause 803 of MoRT&H Specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
1
444
444
... More
Providing and fixing CAT’s eye made of aluminium alloy size 75x100x22mm having 21 biconvex lenses embedded in circular disk of AS plastic on each side on road surface complete including all material, labour, diversion.
1
178
178
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size)
1
4575
4575
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
1
5910
5910
... More
Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand)
1
294
294.5
... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 75mm thick
1
792
792
... More
Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge Average thickness 60 to 75 mm
1
906
906
... More
Neat cement punning
1
52
52.1
... More
Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand
1
4860
4860
... More
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
1
144
144.5
... More
Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . 50mm thick
1
445
445
... More
Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
1
5400
5400
... More
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Hot rolled deformed bars
1
83
83.3
... More
Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
1
236
236.5
... More
Providing, laying and jointing RCC NP4 jacking pipe (with steel pushing collar) with suitable leak proof joints (with using `12mm MDF sheets etc.) with compliance for maintaining slope as per design by trenchless method adopting Micro tunnelling method or any suitable mechanical technology below ground at all depth under running traffic condition including carrying out survey work at the job site for determining underground cable trenches like telephone, power cable, water & sanitary lines and resistivity tests for finding the soil strata using necessary equipment’s for completion of work, mobilizing of machineries and specialized crew at the job site, etc. complete in all respects, including excavation of drive pit and exit pit (upto 3 metre depth) with proper protection at the three sides, providing and casting of MS cutting edges for front shield and constructing thrust bed at designed level as directed by the Engineer, necessary de-watering and providing concrete foundations at the base of the Drive pit, crane for handling of pipes, and any other machinery, tool & tackles required, construction of temporary works as per requirement complete in all respect (all depths) with all lead and lifts, as per specification and the direction of the Engineer. Note- 1. Manual Pipe jacking is not permitted for workmen safety reasons. 2. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 300 mm dia RCC pipe
1
30600
30600
... More
450 mm dia RCC pipe
1
35400
35400
... More
600 mm dia RCC pipe
1
46300
46300
... More
900 mm dia RCC pipe
1
76700
76700
... More
Providing and fixing of reinforced Ferro-Cement drain covers designed for 'AA' class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc. Standard Size 600x800mm (75mm thick) for span 300 to 450mm
1
1486
1486
... More
Standard Size 1000x800mm (100mm thick) for span 451 to 700mm
1
2885
2885
... More
Standard Size 1500x600mm (125mm thick) for span 701 to 1200mm
1
3280
3280
... More
Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), rehandling of material/earth to complete th ask
1
1273
1273
... More
Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m
1
299
299
... More
Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. PCC/ RCC Grade M -20
1
6130
6130
... More
Construction of brick masonry cylindrical road side inspection chamber of 450mm dia (internal) with 230mm thick wall of brick masonry (75 class designation brick) in cement mortar 1:4 (1 cement : 4 coarse sand), wall 230mm thick, filling of Jhiri, 20mm thick inside and outside plastering with CM (1:3), inside plaster finished with neat coat of cement, with 100 mm thick PCC M10 in foundation, 75mm thick PCC M15 flooring, precast SFRC/RCC circular 450mm dia MD manhole frame and cover embedded in 200mm thick PCC M20 grade concrete, including providing and fixing 2 Nos 110mm OD, 0.5m long uPVC pipe pieces of stiffness class SN 8 as per IS 15328 and plugging the same etc complete as per approved drawing and/or directed by Engineer. Note: Excavation of earth work and road cutting will be measured and paid separately BM Road side inspection chamber of 900mm depth
1
7790
7790
... More
Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer.
1
999
999
... More
Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia
1
263
263.5
... More
160 mm Nominal Dia
1
548
548
... More
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Lime Concrete, cement concrete grade M-10 (1:5:10) and below
1
393
393.5
... More
Carriage of Materials by mechanical transport including loading, unloading and stacking : Stone, boulders, gravelly material rate lead for 2 km
1
148
148.43
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
1
5980
5980
... More
Constructing masonry Chamber 30x30x50 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) necessary excavation foundation concrete 1:5:10 ( 1 cement : 5 fine sand:10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick finished with a floating coat of neat cement complete as per standard design : With bricks
1
1341
1341
... More
Providing and fixing on wall face Unplasticised Rigid PVC Single socketed pipes rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. 110 mm diameter
1
312
312
... More
Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion Coupler 110 mm
1
175
175
... More
Single tee with door 110x110x110 mm
1
363
363.5
... More
Bend 87.5° 110 mm bend
1
158
158
... More
125 X 110 mm dia U-PVC Reducer (class III, 6kg/sqcm) confirming to IS:7834
1
269
269
... More
110 mm dia U-PVC double/ single socketed 90° bend (class III, 6kg/sqcm) confirming to IS:7834
1
337
337
... More
Providing and Fixing Unplasticized Poly Vinyl Chloride (UPVC) SWR Pipes fittings type B for soil and waste discharge system (IS:13592 : 1992 Marked) of approved quality /make. Gully Trap 160 mm 100mm dia
1
685
685
... More
Supplying and fixing C.I. cover 300x300 mm without frame for gully trap (standard pattern) the weight of cover to be not less than 4.5kg.
1
443
443
... More
Total S.No 01 to 53 Amount 261247.39 Say 50.00 Lacs
1
4738752
4738752.61