Kota University Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 16,000Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UOK_189560_1Bid Award Id
ViewTender No
NIT 01 / 2020-21Tender Authority
Kota University ViewPurchaser Address
-Website
http://https://www.uok.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
TUBE LIGHTS, Ceiling electric fixtures, requiring replacement shall be replaced preferably with energy saver LED lights to give same illumination as of original &no exrtra payment on this account will be made by the university.
-
-
-
... More
All repair/ Replacement work included in the item and no payment will be given by the University. All such expenses will be borne by the Contractor at his own cost.
-
-
-
... More
If internal cables either on surface or concealed of size more then 6.00 Sqm are damaged or requiring replacement shall be paid extra.
-
-
-
... More
If there is any requirment of new electric points, new fixtures, new Ceiling fans, exhaust fans, gysers, switches & 4 pole MCB, INDUSTRIAL socket other than originally fixed/existing in the building than it will be paid separately.
-
-
-
... More
Contractor shall arrange at his cost for redressal of complaints at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 24 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly even after office hrs i.e. during night if it is required.
-
-
-
... More
Contractor will have to employ trained and qualified electricians for the work as per direction of engineer in charge as &when required even after office hrs i.e. during night
-
-
-
... More
University shall not be responsible for any kind of accident during execution of work.
-
-
-
... More
Contractor will be responsible are arrangement of all material ,T&P required for the work and no payment will be made by the university on this account
-
-
-
... More
Qouted rates shall include all all taxes like GST, Income tax, labour cess ,any other tax imposed by the govt time to time.No payment shall be made by the university on this account.
-
-
-
... More
Entire internal electric system will be handed over to the contractor on as is where is basis (wether fixtures/system are in working condition or not) and contractor has to visit all buildings to assess existing condition of the system before qouting rates.
12
-
-
... More
All in all comprehensive annual repair & maintenance of external electric system for various buildings detailed at annexure -I including repair / replacement of all type MCB/MCCB up to 250 Amp, volt meter, Ampere meter, Selector switch, all type of isoletor, wiring of panels, bas bar chambers, all size of luges, all electric panels etc. except electric cables of all sizes & making cable joints, main switch front or side handle, changeover switches, transformers shall be paid separately.
-
-
-
... More
Electric system of campus shall be kept in functional condition through out the year.
-
-
-
... More
Replacement of material shall be of the same specification as originally fixed in the electric panels
-
-
-
... More
All repair/ Replacement work included in the item and no payment will be given by the University except mentioned in the item. All such expenses will be borne by the Contractor at his own cost.
-
-
-
... More
If external cables either on surface or concealed of size more then 6.00 Sqm are damaged or requiring replacement shall be paid extra.
-
-
-
... More
Contractor shall arrange at his cost for redressal of complaints at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 2 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularlyeven after office hrs i.e. during night if it is required to keep the system in functional condition.
-
-
-
... More
Contractor will have to employ trained and qualified electricians for the work as per direction of engineer in charge.
-
-
-
... More
University shall not be responsible for any kind of accident during execution of work.
-
-
-
... More
Contractor will be responsible are arrangement of all T&P required for the work.
-
-
-
... More
Qouted rates shall include all all taxes like GST, Income tax, labour cess ,any other tax imposed by the govt time to time.No payment shall be made by the university on this account.
-
-
-
... More
Entire external electric system will be handed over to the contractor on as is where is basis and contractor has to visit campus to assess existing condition of the system before qouting rates.
-
-
-
... More
Contractor will maintain cubical panel board and asscasories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on account of material.
12
-
-
... More
All in all comprehensive annual repair & maintenance of existing external street lighting system and external lighting system for various buildings having different type/wattes HPSV,IP-65,LED lights , flood lights, gate lights etc. of the entire university campus detailed at annexure -I including repair / replacement of all type MCB/MCCB 100AMP, TIMER, Contact, wiring of panels all size of luges, etc. except electric cables of all sizes & making cable joints, shall be paid separately.
-
-
-
... More
Existing external street lighting system and external lighting system for buildings shall be kept in functional condition through out the year.
-
-
-
... More
Replacement of material shall be of the same specification as originally fixed.
-
-
-
... More
All repair/ Replacement work included in the item and no payment will be given by the University except mentioned in the item. All such expenses will be borne by the Contractor at his own cost.
-
-
-
... More
Street light fixtures,lights over buildings, requiring replacement shall be replaced with energy saver LED lights to give required illumination by the contractor at his own cost
-
-
-
... More
At any moments minimum of 90% of total fixture must be in order. The defecctive fixture must be repaired within 2 days, failing which three times of the maintennance charges payable for each fixture for the month shall be panelised and recovered from be contractor.
-
-
-
... More
Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 12 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly even after office hrs i.e. during night if it is required to keep the system in functional condition.
-
-
-
... More
Contractor will have to employ trained and qualified electricians for the work.
-
-
-
... More
University shall not be responsible for any kind of accident during execution of work.
-
-
-
... More
Contractor will be responsible for safety and security of fixtures and all concemed materials
-
-
-
... More
Contractor will be responsible for arrangement of all T&P required for the work.
-
-
-
... More
Cost of all labour and material like tube, rod, starter, ballast, choke, bulb wire etc. will be born by conctractor. All material required for the work shall be equivalent to same standarde as provided at start of work .
-
-
-
... More
No Extra payment will be made for fixing/ removal of extra existing fixture in the University.
-
-
-
... More
Contractor will be responsible for any theft of electricity through poles and be will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.
-
-
-
... More
Contractor will maintain cubical panel board and asscasories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on account of material.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements