If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Jodhpur Vidyut Vitran Nigam Limited - JVVNL Tender

Works
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Oct 2024
Closing Date23 Oct 2024
Tender Amount₹ 13,04,769 
Notes
Download

Costs

  • EMD

    ₹ 26,095
  • Document Cost

    ₹ 2,950
  • Tender Fee

    ₹ 1,180

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
ERECTION OF 19.22 KM 11 KV LINE ALONGWITH SUS STATION FOR RELEASE OF PHED CONNECTION UNDER AEN O N M CHITALWANA
Erection of 19.22 km 11 kv line for release of phed connection under AEn O N M jdvvnl, Chitalwana
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. `11 kC Hoen Gap (6.17.4)

3

2699

899.68

... More
Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessoriee completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue 11 kV GO Switch (6.16.2)

3

3007

1002.51

... More
Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filIing oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. 11 kV VCB (Out door) (11.1.4)

3

15643

5214.38

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. (In Rural Area) PCC Poles 9 Mtr. Long 200 Kg (5.2.8)

12

4728

394.08

... More
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) (8.1)

6

2091

348.63

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed, using bolted type hardware including binding on pin Insulators, jumpering on section points with binding wire / P.G. clamps. Aluminium Jointing sleeves will be used for the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.(In Rural Area) ACSRE RABBIT (7.1.10)

0.15

344

2294.16

... More
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing. OTHER STEEL ITEMS (14.2)

4604.99

6907

1.5

... More
Sypply of NUTS & BOLTS

60

5145

85.75

... More
PART B- Transportation

-

-

-

... More
Safe carriage of PCC poles including loading/un-loading c) 9 Mtr/ 11 Mtr.long 400 Kg. PCC pole Within 10 Kms. (3.1.7)

12

2426

202.24

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.1.8)

12

1185

98.8

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site (3.2) Within 10 Kms. (3.2.1)

3

1015

338.66

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.2.2)

3

287

95.8

... More
above 30 km & up to 70 kms (next 10KM) (3.2.3)

3

89

29.7

... More
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Within 10 Kms.(3.3.1)

0.25

101

405.89

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.3.2)

0.25

28

115.6

... More
above 30 km & up to 70 kms (next 10KM)(3.3.3)

0.25

9

36.6

... More
PART C- 11 KV Line

-

-

-

... More
Conducting route survey as per approved route map and pegging of route with section point/double pole location (1.1)

19.22

3915

203.7

... More
Trimming of tree branches and plants and preparing route aprochasses for proposed line.(1.4)

380

11616

30.57

... More
Excavation of hard soil. (A) height of poles /Rs Joints /Ms rail size of pit. 9 mtr/ Rs. Joist / Ms Rails 1.2mX0.6mX1.5m deep

288

27849

96.7

... More
(B) Lattice Tower /Size of pit 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep(2.1.4)

61

19358

317.35

... More
( C) Stay set/ depth of pit 6'X5/8" - 0.75X0.5X1.35m(2.1.7)

250

16600

66.4

... More
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. (Weight Approx 508 Kg P.Tower) (5.1) Lattice Structure (5.1.3)

30.5

155060

5083.95

... More
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base ( Tower Foundation) (5.6)

131.76

386948

2936.77

... More
Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide) (12.1) On new surface (12.1.1)

1525

51499

33.77

... More
Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint) (12.2) On new surface (12.2.2)

1525

77241

50.65

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. (5.2) PCC Poles 9 Mtr. Long (200Kg) (5.2.8)

234

92214

394.08

... More
Erection & assembly of 2 pole structure of pcc pole in exacavated pit in alignment after cheching the same with pilum line (5.3) PCC Poles 9 Mtr. Long (200Kg) (5.3.3)

27

31027

1149.17

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire I P.G.clamps.Alumlnlum jointing sleeves will be .used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. (7.1) ACSR RABBIT (7.1.10)

57.9

132831

2294.16

... More
Erection & fixing of G.I. Stay sets with anchor plates in ecavated pit in required postion and back filling with soil with proper ramming . The worj includes fixing of stay clamps. Stay insulator with stay wire at both end with proper tension Size of stay set/ stay wire (5.4) 8'X3/4" with 7/8 SWG stay wire (5.4.2)

250

62740

250.96

... More
Fixing of 11 kv pin insulator with pins.

825

8514

10.32

... More
Fixing of 11 Kv B&S/T&C type disc insulator of 11 kv lines (each unit consiting of 1 nos. disc.& 1 set of H/W) on terminal point including fixing ofhardware and strips.

246

5709

23.21

... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates, 11 KV line (6.8.2)

33

2037

61.74

... More
Supply if Nut Bolts (SUPPLY PART) (25.3)

216

18522

85.75

... More
PART D- Transportation

-

-

-

... More
Safe carriage of PCC poles including loading/un-loading c) 9 Mtr/ 11 Mtr.long 400 Kg. PCC pole Within 10 Kms. (3.1.7)

288

58245

202.24

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.1.8)

288

28454

98.8

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Within 10 Kms. (3.2.1)

30

10159

338.66

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.2.2)

30

2874

95.8

... More
above 30 km & up to 70 kms (next 10KM )(3.2.3)

30

891

29.7

... More
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. (3.3) Within 10 Kms.(3.3.1)

15

6088

405.89

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.3.2)

15

1734

115.6

... More
above 30 km & up to 70 kms (next 10KM) (3.3.3)

15

549

36.6

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. Including loading /unloading and stacking in the Nigam. Stores / at work site. (3.4) Within 10 Kms.(3.4.1)

65

32089

493.68

... More
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.4.2)

65

6227

95.8

... More
above 30 km & up to 70 kms (next 10KM) (3.4.3)

65

2379

36.6

... More
PART E- Metering Part

-

-

-

... More
Safe Loading of new/old 11 KV CT PT sets (all sizes) Set (24.1)

3

360

120.25

... More
Safe unloading of new /oId 11 KV CT PT set (all sizes ) Set (24.2)

3

161

53.71

... More
Installation , testing as per Nigams norms & commissioning of new 11KV CT PTset (all sizes) on erected supports including jumpering,crimping of lugs/ clamping Set earth connection of body &conducting pre commissioning test before energization and satisfactory operation in all respect (24.3

3

2108

702.84



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.