Jodhpur Vidyut Vitran Nigam Limited Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 26,095Document Cost
₹ 2,950Tender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_JdVVN_432190_1Tender No
ZCE/BMRZ/TNO.05/24-25/D1273 D21-11-2024Tender Authority
Jodhpur Vidyut Vitran Nigam Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
ERECTION OF 19.22 KM 11 KV LINE ALONGWITH SS FOR RELEASE OF PHED CONNECTIONS IN FAVOR OF XEN PHED PROJECT CHITALWANA UNDER AEN O AND M CHITALWANA
ERECTION OF 19.22 KM 11 KV LINE ALONGWITH SS FOR RELEASE OF PHED CONNECTIONS IN FAVOR OF XEN PHED PROJECT CHITALWANA UNDER AEN O AND M CHITALWANA
ERECTION OF 19.22 KM 11 KV LINE ALONGWITH SS FOR RELEASE OF PHED CONNECTIONS IN FAVOR OF XEN PHED PROJECT CHITALWANA UNDER AEN O AND M CHITALWANA
BOQ Items
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected
structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. `11 kC Hoen Gap (6.17.4)
3
899
2699.04
Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessoriee completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue 11 kV GO Switch (6.16.2)
3
1002
3007.53
Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filIing oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. 11 kV VCB (Out door) (11.1.4)
3
5214
15643.14
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. (In Rural Area) PCC Poles 9 Mtr. Long 200 Kg (5.2.8)
12
394
4728.96
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) (8.1)
6
348
2091.78
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed, using bolted type hardware including binding on pin Insulators, jumpering on section points with binding wire / P.G. clamps. Aluminium Jointing sleeves will be used for the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.(In Rural Area) ACSRE RABBIT (7.1.10)
0.15
2294
344.12
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing. OTHER STEEL ITEMS (14.2)
4604.99
1
6907.49
Sypply of NUTS & BOLTS
60
85
5145
PART B- Transportation
-
-
-
Safe carriage of PCC poles including loading/un-loading c) 9 Mtr/ 11 Mtr.long 400 Kg. PCC pole Within 10 Kms. (3.1.7)
12
202
2426.88
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.1.8)
12
98
1185.6
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site (3.2) Within 10 Kms. (3.2.1)
3
338
1015.98
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.2.2)
3
95
287.4
above 30 km & up to 70 kms (next 10KM) (3.2.3)
3
29
89.1
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. Within 10 Kms.(3.3.1)
0.25
405
101.47
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.3.2)
0.25
115
28.9
above 30 km & up to 70 kms (next 10KM)(3.3.3)
0.25
36
9.15
PART C- 11 KV Line
-
-
-
Conducting route survey as per approved route map and pegging of route with section point/double pole location (1.1)
19.22
203
3915.11
Trimming of tree branches and plants and preparing route aprochasses for proposed line.(1.4)
380
30
11616.6
Excavation of hard soil. (A) height of poles /Rs Joints /Ms rail size of pit. 9 mtr/ Rs. Joist / Ms Rails 1.2mX0.6mX1.5m deep
288
96
27849.6
(B) Lattice Tower /Size of pit 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep(2.1.4)
61
317
19358.35
( C) Stay set/ depth of pit 6'X5/8" - 0.75X0.5X1.35m(2.1.7)
250
66
16600
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. (Weight Approx 508 Kg P.Tower) (5.1) Lattice Structure (5.1.3)
30.5
5083
155060.48
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base ( Tower Foundation) (5.6)
131.76
2936
386948.82
Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide) (12.1) On new surface (12.1.1)
1525
33
51499.25
Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint) (12.2) On new surface (12.2.2)
1525
50
77241.25
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. (5.2) PCC Poles 9 Mtr. Long (200Kg) (5.2.8)
234
394
92214.72
Erection & assembly of 2 pole structure of pcc pole in exacavated pit in alignment after cheching the same with pilum line (5.3) PCC Poles 9 Mtr. Long (200Kg) (5.3.3)
27
1149
31027.59
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire I P.G.clamps.Alumlnlum jointing sleeves will be .used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. (7.1) ACSR RABBIT (7.1.10)
57.9
2294
132831.86
Erection & fixing of G.I. Stay sets with anchor plates in ecavated pit in required postion and back filling with soil with proper ramming . The worj includes fixing of stay clamps. Stay insulator with stay wire at both end with proper tension Size of stay set/ stay wire (5.4) 8'X3/4" with 7/8 SWG stay wire (5.4.2)
250
250
62740
Fixing of 11 kv pin insulator with pins.
825
10
8514
Fixing of 11 Kv B&S/T&C type disc insulator of 11 kv lines (each unit consiting of 1 nos. disc.& 1 set of H/W) on terminal point including fixing ofhardware and strips.
246
23
5709.66
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates, 11 KV line (6.8.2)
33
61
2037.42
Supply if Nut Bolts (SUPPLY PART) (25.3)
216
85
18522
PART D- Transportation
-
-
-
Safe carriage of PCC poles including loading/un-loading c) 9 Mtr/ 11 Mtr.long 400 Kg. PCC pole Within 10 Kms. (3.1.7)
288
202
58245.12
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.1.8)
288
98
28454.4
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site Within 10 Kms. (3.2.1)
30
338
10159.8
above 10 km & up to 30 kms add for each km. per pole or part thereof (3.2.2)
30
95
2874
above 30 km & up to 70 kms (next 10KM )(3.2.3)
30
29
891
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. (3.3) Within 10 Kms.(3.3.1)
15
405
6088.35
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.3.2)
15
115
1734
above 30 km & up to 70 kms (next 10KM) (3.3.3)
15
36
549
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. Including loading /unloading and stacking in the Nigam. Stores / at work site. (3.4) Within 10 Kms.(3.4.1)
65
493
32089.2
above 10 km & up to 30 kms add for each km. per pole or part thereof(3.4.2)
65
95
6227
above 30 km & up to 70 kms (next 10KM) (3.4.3)
65
36
2379
PART E- Metering Part
-
-
-
Safe Loading of new/old 11 KV CT PT sets (all sizes) Set (24.1)
3
120
360.75
Safe unloading of new /oId 11 KV CT PT set (all sizes ) Set (24.2)
3
53
161.13
Installation , testing as per Nigams norms & commissioning of new 11KV CT PTset (all sizes) on erected supports including jumpering,crimping of lugs/ clamping Set earth connection of body &conducting pre commissioning test before energization
and satisfactory operation in all respect (24.3
3
702
2108.52
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%