Jhalawar Medical College Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Jhalawar Medical College - JMC Tender

Services
Healthcare and Medicine
Real Estate Service
Eprocure
Opening Date24 Feb 2024
Closing DateCancelled
Tender Amount₹ 5,00,000 
Notes
Download

Costs

  • EMD

    ₹ 10,000
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.0 TR Window/ Split A.C.

-

-

-

... More
25/50 / 40/80 Ltr. Water cooler

-

-

-

... More
60/120 Ltr. Water cooler

-

-

-

... More
150/150 Ltr. Water cooler

-

-

-

... More
165 Ltr Refrigerator

-

-

-

... More
200/210 Ltr Refrigerator

-

-

-

... More
280/310 Ltr Refrigerator

-

-

-

... More
Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.0 TR A.C.

-

-

-

... More
1.5 TR A.C.

-

-

-

... More
2.0 TR A.C.

-

-

-

... More
25/50 / 40/80 Ltr. Water cooler

-

-

-

... More
60/120 Ltr. Water cooler

-

-

-

... More
150/150 Ltr. Water cooler

-

-

-

... More
165 Ltr Refrigerator

-

-

-

... More
200/210 Ltr Refrigerator

-

-

-

... More
280/310 Ltr Refrigerator

-

-

-

... More
P & Replacement of condensing/ cooling coil of copper fins for following capacity A.C./ Water cooler/ Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.0 TR A.C.

-

-

-

... More
1.5 TR A.C.

-

-

-

... More
2.0 TR A.C.

-

-

-

... More
25/50 / 40/80 Ltr. Water cooler

-

-

-

... More
60/120 Ltr. Water cooler

-

-

-

... More
150/150 Ltr. Water cooler

-

-

-

... More
165 Ltr Refrigerator

-

-

-

... More
200/210 Ltr Refrigerator

-

-

-

... More
286/310 Ltr Refrigerator

-

-

-

... More
P & Replacement of fan motor of evaporator/ condensor complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of overload protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
Charging of Additional refrigerant and testing of performance of air conditioner/ fridge/ water cooler of following capacity Charging Gas

-

-

-

... More
P & Replacement of thermostat of A.C./ Water cooler/fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of selector switch of 1.0/1.5/2.0 TR A.C Fan as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of starting relay of A.C/ water cooler/fridge compressor as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of New PCB (Non Invertor) as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.5 Tr

-

-

-

... More
P & Replacement of New PCB (Non Invertor) as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 2 Tr

-

-

-

... More
P & Replacement of New PCB (Invertor) as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 1.5 Tr

-

-

-

... More
P & Replacement of New PCB (Invertor) as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 2 Tr

-

-

-

... More
Repairing of old PCB Non Invertor as required

-

-

-

... More
Repairing of old PCB Invertor as required

-

-

-

... More
P & Replacement of door gasket of 165/200 Ltr. Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of door gasket of 286/310 Ltr. Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of door handle of 165/200/286/310 Ltr. Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of lamp of Fridge as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of Fan Blade A.C. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
P & Replacement of fridge lock complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor.

-

-

-

... More
S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. Starting capacitor 80-100 micro farad

-

-

-

... More
100-120 micro farad

-

-

-

... More
120-150 micro farad

-

-

-

... More
Running capacitor 2.5/3.15 micro farad

-

-

-

... More
4.0 micro farad

-

-

-

... More
6.0 micro farad

-

-

-

... More
45 micro farad

-

-

-

... More
50 micro farad

-

-

-

... More
60 micro farad

-

-

-

... More
Supply & fixing MS powder coated stand suitable for 1.5/2.0 Tr outdoor type of Split AC. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR .

-

-

-

... More
Dismentling of split air conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc. including shifting of dismentaled material to store complete as required

-

-

-

... More
Installation of split air conditioner of any capacity/any type including existing indoor unit & outdoor unit , refrigerant piping , connecting cables , drain pipe etc.

-

-

-

... More
Supply & fixing Interconnecting refrigerant copper pipe with external thermal closed cell elastomeric nitrile rubber Insulation material FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 in form of tubular insulation between each set of indoor & outdoor units as per specifications nitrile including cost of adhesive complete as per specification and as required. All as per pre approved by Engineer in charge,chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge 6.35mm

-

-

-

... More
Supply & fixing Interconnecting refrigerant copper pipe with external thermal closed cell elastomeric nitrile rubber Insulation material FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 in form of tubular insulation between each set of indoor & outdoor units as per specifications nitrile including cost of adhesive complete as per specification and as required. All as per pre approved by Engineer in charge,chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge 9.53 mm

-

-

-

... More
Supply & fixing Interconnecting refrigerant copper pipe with external thermal closed cell elastomeric nitrile rubber Insulation material FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 in form of tubular insulation between each set of indoor & outdoor units as per specifications nitrile including cost of adhesive complete as per specification and as required. All as per pre approved by Engineer in charge,chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge 12.7 mm

-

-

-

... More
Supply & fixing Interconnecting refrigerant copper pipe with external thermal closed cell elastomeric nitrile rubber Insulation material FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 in form of tubular insulation between each set of indoor & outdoor units as per specifications nitrile including cost of adhesive complete as per specification and as required. All as per pre approved by Engineer in charge,chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge 19.05 mm

-

-

-

... More
Providing & Fixing of ISI marked (IS : 4985 - 2000) Hard rigid PVC 25mm drain water piping with fittings like elbow, soket, Tee etc & support with MS hanger on ceiling or recessed in wall with chasing & plastering with 6 mm thick closed cell elastomeric nitrile rubber insulation complete in all respect. All as per pre approved by Engineer in charge.

-

-

-

... More
P & Replacement of fan motor of Water Cooler complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 25 Hp Fan Motor

-

-

-

... More
P & Replacement of fan motor of Water Cooler complete as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 5 Hp Fan Motor

-

-

-

... More
P & Replacement of Fan Blade Water Cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. Fan Blade 6”

-

-

-

... More
Fan Blade 8”

-

-

-

... More
Fan Blade 12”

-

-

-

... More
Fan Blade 15”

-

-

-

... More
P & Replacement of Contactor protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 16Amp Single Pole

-

-

-

... More
P & Replacement of Contactor protection of A.C./ Water cooler as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. 16Amp Double Pole

-

-

-

... More
Supply & Fixing of FR PVC insulated & sheathed 3 core flexible copper conductor as per PWD specification for electrical Works confirming to IS:694 and as per IS 8130 : 2013 of 1.1 kV grade .Wire should be made from 99.99% purity copper, class 5 stranding in acc. to IEC 60228 for lower watt loss , oxygen free ( 10 ppm) for less chances of oxidization and higher silver content for gives better conductivity , insulation PVC type A ,flame retardant as per IS 10810-53, better amperage rating as per VDE 0298 part 4 including making connection etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. All as per pre approved by Engineer in charge, making connections. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 2.5 Sq.mm

-

-

-

... More
Supply & Fixing of FR PVC insulated & sheathed 3 core flexible copper conductor as per PWD specification for electrical Works confirming to IS:694 and as per IS 8130 : 2013 of 1.1 kV grade .Wire should be made from 99.99% purity copper, class 5 stranding in acc. to IEC 60228 for lower watt loss , oxygen free ( 10 ppm) for less chances of oxidization and higher silver content for gives better conductivity , insulation PVC type A ,flame retardant as per IS 10810-53, better amperage rating as per VDE 0298 part 4 including making connection etc. as required. OEM Must have its own in house NABL lab setup for all testing facilities for wires. All as per pre approved by Engineer in charge, making connections. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR. 4.0 Sq.mm

-

-

-

... More
Servicing of 1.0/1.5/2.0 TR capacity Split/ Window type air conditioner.  Ground Connections  Checking connection at the main plug  Cleaning of blower and condenser fan  Cleaning of air filter  Cleaning the evaporator and condenser coils  Cleaning the equipment  Checking and tightening of nuts & bolts  Oiling the motor  Checking cooling efficiency  Checking of voltage stabilizers

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.