Jaipur Vidyut Vitran Nigam Limited Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 16,000Document Cost
₹ 236Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_JVVNL_421072_4Tender No
E-NIT 15/2024-25Tender Authority
Jaipur Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://energy.rajasthan.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT, terms and condition, special condition, declaration format etc
BOQ Items
11.29
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand ) including making joints with without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete including painting etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineerin- charge).
6
36618
6103
14.2.1
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix.
4
2548
637
1.31/B
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
88
440
5
1.1/B
Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil
88
3080
35
5.1.2/B-5
Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks cement mortar 1:6 (1- cement: 6- coarse sand).
8
34104
4263
12.3.2/B-12
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish: (A) 20mm thick
70
13300
190
12.22.1 Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete.
(A) New plastered surface (three or more coats)
70
5880
84
12.42/B-12
Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ).
70
6020
86
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements