Jaipur Vidyut Vitran Nigam Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Jaipur Vidyut Vitran Nigam Limited - JVVNL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Nov 2024
Closing Soon26 Nov 2024
Tender Amount₹ 8,89,172 
Notes
Download

Costs

  • EMD

    ₹ 17,783
  • Document Cost

    ₹ 2,950
  • Tender Fee

    ₹ 590

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)

2000

6

13480

... More
Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line.

10

29

299.8

... More
Excavation of pit in Hard soil

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

40

102

4091.6

... More
(C)Stay set/Depth of pit

-

-

-

... More
6'x 5/8" -0.75x0.5x1.35 m

-

-

-

... More
Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter.

-

-

-

... More
Hard /dense soil

47.25

77

3640.14

... More
Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix.

20

2371

47423.8

... More
Note

-

-

-

... More
The rates are all lead of cement,lime,ballast, sand,surkhi and grit etc.at site of work.

-

-

-

... More
For all concrete work coarse sand shall be used no extra will be paid .

-

-

-

... More
Concrete mix prepared by power driven mechanical mixer shall be used .

-

-

-

... More
Under exceptional coditions, where mechanical mixer and vibrator are not used (with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator

-

-

-

... More
Thickness of the cement concrete should not exceeed 100 mm.

-

-

-

... More
Plaster on new surface on walls in cement ,sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick.

20

128

2566.4

... More
Note

-

-

-

... More
The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift.

-

-

-

... More
The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc.

-

-

-

... More
Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete.

-

-

-

... More
25 mm thick with 12.5 mm thick nominal size aggregate.

20

167

3347.8

... More
75 mm thick with 20 mm thick nominal size aggregate.

20

398

7978.4

... More
Note

-

-

-

... More
The rates for all items include alll form of work, laying, curing, and finishing etc. The rates are for complete work at site inclusive of all leads

-

-

-

... More
The rates cover the preparation and cleaning of all places

-

-

-

... More
Safe carriage of PCC poles including loading / un-loading

-

-

-

... More
a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole

-

-

-

... More
Within 10 Kms.

40

231

9269.6

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

40

4

950

... More
c) 9 Mtr. 200KG Long PCC pole

-

-

-

... More
Within 10 Kms.

-

-

-

... More
Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof.

-

-

-

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site

-

-

-

... More
Within 10 Kms.

10

325

3256.5

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

10

4

230.5

... More
Safe carriage of Insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.

-

-

-

... More
Within 10 Kms.

3

390

1170.87

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

3

5

83.55

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.

-

-

-

... More
Within 10 Kms.

-

-

-

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

-

-

-

... More
Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading.from store to site

-

-

-

... More
b) 25 & 40 KVA

-

-

-

... More
Within 10 Kms.

1

238

238.51

... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.

1

6

33.9

... More
Safe Carriage of 33/11 KV Power Transformer

-

-

-

... More
c) 5.0 MVA

-

-

-

... More
Within 10 Kms

1

5081

5081.77

... More
Above 10 Kms & upto 30 Kms . Add for each Km or partthereof

1

50

254.05

... More
Safe carriage of Breakers/Kiosk etc. including Loading/Unloading & stacking in Nigam stores.

-

-

-

... More
Within 10 Kms

6

889

5337.78

... More
Above 10 Kms & upto 30 Kms . Add for each Km or part thereof

6

11

345.6

... More
Safe loading of power/ distribution transformer.

-

-

-

... More
(A) 33/11 KV power transformer.

-

-

-

... More
5 MVA

1

5035

5035.67

... More
Safe unloading of power/distribution transformers

-

-

-

... More
a) 33/11 KV power transformer.

-

-

-

... More
5.00 MVA

1

4265

4265.88

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
PCC Poles 9 Mtr. Long (400 Kg)

40

449

17996

... More
PCC Poles 9 Mtr. Long (200 Kg)

-

-

-

... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire

-

-

-

... More
6"x5/8" with 7/10 SWG stay wire

-

-

-

... More
Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station.

5

3160

15800.1

... More
Fixing of LT brackets with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(B) 2' long

-

-

-

... More
Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 Nos. disc.& 1set of H/W) on terminal point including fixing of hardware and strips.

18

46

845.28

... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.

30

33

1008.9

... More
Fixing of shackle insulator with hardware.

-

-

-

... More
Fixing of 33kv pin insulator with pins.

12

14

178.44

... More
Fixing of 11 KV pin insulator with pins.

18

9

178.56

... More
Assembly, installation and commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completion all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing discom store issue rates.

-

-

-

... More
(B)G.O. switch . without earthing blade.

-

-

-

... More
33kv G.O.switch

2

1112

2224.58

... More
11kv G.O.switch

5

865

4325.5

... More
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
33kv Horn Gap fuse set.

1

512

512.84

... More
11kv Horn Gap fuse set.

4

444

1779.84

... More
Installation of lightening arrestors on erected structure /support (1 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
(A)sub-station type

-

-

-

... More
33 KV L.A. each

1

170

170.95

... More
11 KV L.A. each

4

148

593.28

... More
Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
10 and 16 KVA

-

-

-

... More
Fixing of PG clamp of Dog /Racoon Conductor

74

4

367.78

... More
Assembly,installation & commisioning of 11 KV Roaster switchs on erected structures with stting for accurate operation including fixing of allied accessories completed in all respect with post insulators and jumpering on both ends for connection with systm.The nuts & bolts will be supplied by contractor for which payment will be made as per prevailing Dicom store issue rates.

4

1619

6478.16

... More
Drawing of overhead ABC conductor (Areal bunched cable)on existing erected pole/support including laying. Jointing,stringing complete in all respect.

-

-

-

... More
1cX25 + 25 Sq mm

0.2

2067

413.49

... More
Earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16" dia.at flattened top and tightening of M.S.flat 50x6mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.

3

224

673.86

... More
Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder:

-

-

-

... More
Excavation of trench of 0.65Mtrs.depth and 0.5Mtr.width

-

-

-

... More
(b) Hard soil

200

152

30532

... More
Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust.

500

25

12865

... More
Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust.

500

38

19370

... More
Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/stay wire/MS flat inclamp depending on type of soil:

-

-

-

... More
(A) Where drilling is not required

30

190

5709.3

... More
(B) Where drilling is required

10

623

6230.1

... More
Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming &watering with lead up to 50 Mtr, and lift up to 1.5 Mtr.

500

5

2560

... More
Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint including material.

250

7

1782.5

... More
Earthing of new 33/11 KV S/S with bentonite compound (including material ) involving following activities.

4

5656

22627

... More
Digging of 10.5 ft. deep pit of 4 ' dia ( approx 132 cu.ft)

-

-

-

... More
Supply of 2" G.I pipe with cap(including fabrication of 30 holes in the periphery of pipe)

-

-

-

... More
Making chamber for water pouring including cast iron manhole cover

-

-

-

... More
Supply cost of 200 kg bentonite compound with making slurry

-

-

-

... More
Supply of black cotton soil approx 80 cu.ft.

-

-

-

... More
Connecting electrode with Mesh Earthing

-

-

-

... More
Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge.

-

-

-

... More
ACSR DOG/RABBIT

1000

23

23470

... More
Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom.

-

-

-

... More
33 KV VCB/SF-6 Breaker

1

5013

5013.96

... More
11 KV VCB (Outdoor )

5

5013

25069.8

... More
Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S.

4

19775

79101.56

... More
The installation work to be carried out as per drawing/design, under the supervision of concerned Assistant Engineer

-

-

-

... More
(A) Mounting structure

-

-

-

... More
The requisite steel members will be supplied by contractor including the hardware. Contractor shall joint/weld the members to form the mounting structure as per drawing. Necessary tools, welding, machines, lifting devices etc. shall be arranged by contractor.

-

-

-

... More
(B) Civil works

-

-

-

... More
Erection of lattices in alignment including excavation and concreting of structure foundation including cement, sand and grit 20 mm size (crusher broken) having ratio 1:3:6 and grit 40 mm size for ratio 1:5:10 and curing for period as required (21 days). Area of concreting will be as per the drawing.

-

-

-

... More
(C )Metering Equipments:

-

-

-

... More
The requisite metering equipments (CTPT set, meter,meter box & suitable conductors for jumpers), will be provided by the concerned Assistant Engineer in healthy condition at site. The cables from CTPT set to meter box laid down in 50 mm GI pipe with suitable bends & nipples, shall be provided by contractor alongwith the consumable items such as PVC tapes, petroleum jelly etc. The cable should be PVC multi strand copper 4 core 2.5/4 Sq. mm ISI marked and firm & tight connections shall be made by suitable connector e.g. at CTPT sets by using clamps and at meter/TTB by suitable lugs etc. The CTPT sets so installed shall be earthed by means of the MS Flat (size 50x6 mm) by joining it with the nearest earthing available at the sub-station. Requisite earthing material shall be made available by the contractor.

-

-

-

... More
(d) Meter:

-

-

-

... More
Meters should be fixed firmly inside the tamper proof box, as per drawing. All the meter fixture will be provided by contractor including all consumables.

-

-

-

... More
(E) Meter Box

-

-

-

... More
The meter box shall be provided by the concerned Assistant Engineer. However, hardware or any other items required to fix the meter inside the meter box will be provided by contractor. The meter box will be fixed firmly with sufficient strength at a place as per drawing. The test terminal block(TTB) link type shall be provided by contractor in the meter box.

-

-

-

... More
(F) Painting:

-

-

-

... More
All surfaces interior and exterior of lattice structure shall be white aluminum painted.

-

-

-

... More
(G) Commissioning of Metering Equipments:

-

-

-

... More
Installed meters inside the box and metering equipments duly mounted on the mounting structure will be powered up by connecting load in the presence of the concerned Assistant Engineer who will arrange the necessary shut down. The completion certificate shall be furnised by contractor.be filled accordingly. Since the work involves higher A.C. voltage level, the contractor shall take full care regarding safety norms, so as to avoid any accidental hazards.

-

-

-

... More
Safe Loading of new/old 11 KV CT PT sets (all sizes)

4

115

462.52

... More
Safe unloading of new /old 11 KV CT PT set (all sizes )

4

51

206.56

... More
Installation , testing as per Nigams norms & commissioning of new 11KV CT PT set (all sizes) on erected supports including jumpering,crimping of lugs/ clamping earth connection of body &conducting pre commissioning test before energization and satisfactory operation in all respect

4

675

2703.28

... More
Part - B - For 33 KV line T off Gudla 33 KV feeder line under AEN (A-II), Karauli

-

-

-

... More
Conducting route survey as per approved Route map and pegging of route with tee off point section point & double pole locations.

5

199

998.95

... More
Trimming of tree branches/plants and preparing route approchases for proposed line.

100

29

2998

... More
Excavation of pit in Hard soil

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

80

255

20457.6

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

5

1310

6552.5

... More
( c ) Stay set/ Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.35 m

40

232

9298.8

... More
Excavation of pit in Hard rock ( Where blasting/ drilling is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

20

958

19174

... More
Safe carriage of PCC poles including loading / un-loading

-

-

-

... More
a) 9 Mtr. Long PCC pole 400 KG

-

-

-

... More
Within 10 Kms.

100

231

23174

... More
Above 10 Kms. & upto 30 Kms. Add for each 5 Km.or part thereof.

100

4

7125

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site

-

-

-

... More
Within 10 Kms.

4

325

1302.6

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

4

4

276.6

... More
Safe carriage of Insulator, hardware, cable, breakers, kiosks, pannels etc.including loading/unloading and stacking in Nigam.stores etc.

-

-

-

... More
Within 10 Kms.

3

390

1170.87

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

3

5

250.65

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.

-

-

-

... More
Within 10 Kms.

3

474

1424.13

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

3

4

276.6

... More
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.

-

-

-

... More
Lattice Structure

3

4888

14665.59

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
PCC Poles 9 Mtr. Long (400 Kg)

90

449

40491

... More
Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
PCC Poles 9 Mtr. Long(400 Kg.)

5

1297

6489.05

... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire

-

-

-

... More
8'x3/4" with 7/8 SWG stay wire

40

278

11152.4

... More
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.

5

2823

14119.45

... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
33 KV line

10

81

815.2

... More
Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware and strips.

108

46

5071.68

... More
Fixing of 33kv pin insulator with pins.

300

14

4461

... More
Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33kv G.O.switch

2

1235

2471.96

... More
Fixing of PG clamp of Dog /Racoon Conductor

55

4

273.35

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)

40

335

13408.8

... More
ACSR DOG

15

2584

38764.5

... More
Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
G.I.Earth wire 6 SWG

3

894

2682.69

... More
Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire laces at an interval of two meter each or required as per location using EYE bolt, nuts and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts will be provided by thecontractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
M.S. Nut & Bolt

1

103266

103266.78

... More
Part - C - For erection of 11 KV line Interconnections from 33/11 KV S/S ROAND KALAN work under AEN A-II KARAULI

-

-

-

... More
Conducting route survey as per approved Route map and pegging of route with tee off point section point & double pole locations.

3.5

199

699.27

... More
Trimming of tree branches/plants and preparing route approchases for proposed line.

70

29

2098.6

... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

60

102

6137.4

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/0.8 Mtr/ 1.5mx1.5m x2.10 m deep

4

1310

5242

... More
(C)Stay set/Depth of pit

-

-

-

... More
6'x 5/8" -0.75x0.5x1.35 m

25

209

5230.25

... More
Safe carriage of PCC poles including loading / un-loading

-

-

-

... More
(c) 9 mtr.200 KG long PCC poles

-

-

-

... More
Within 10 kms

60

194

11667.6

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

60

4

5700

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site

-

-

-

... More
Within 10 Kms.

3

325

976.95

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

3

4

276.6

... More
Safe carriage of Insulator, hardware, cable, breakers, kiosks, pannels etc.including loading/unloading and stacking in Nigam.stores etc.

-

-

-

... More
Within 10 Kms.

2

390

780.58

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

2

5

222.8

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.

-

-

-

... More
Within 10 Kms.

2.4

474

1139.3

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

2.4

4

221.28

... More
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.

-

-

-

... More
Lattice Structure

2.4

4888

11732.47

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
PCC Poles 9 Mtr. Long (200 Kg)

56

378

21220.08

... More
Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
PCC Poles 9 Mtr. Long (200 Kg)

2

1105

2210

... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire

-

-

-

... More
6'x5/8" with 7/10 SWG stay wire

25

241

6032.75

... More
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.

4

2823

11295.56

... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
11 KV line

10

59

593.7

... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1 Nos. disc & 1 set of H/W ) on terminal point including fixing of hardware and strips.

30

22

669.3

... More
Fixing of 11 KV pin insulator with pins.

174

9

1726.08

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
ACSR RABBIT

10.5

2205

23162.79

... More
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)

12

335

4022.64

... More
Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
G.I.Earth wire 10 SWG

2.59

682

1766.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.